• 제목/요약/키워드: Shop Operation

검색결과 158건 처리시간 0.019초

멀티 셀 유연생산환경을 위한 통합운용시스템 (An Integrated Shop Operation System for Multi-Cell Flexible Manufacturing Systems under Job Shop Environments)

  • 남성호;류광열;신정훈;권기억;이석우
    • 한국정밀공학회지
    • /
    • 제29권4호
    • /
    • pp.386-394
    • /
    • 2012
  • Recent trends in the flexible manufacturing systems are morphing cell control for the shop-wide production operation system and providing the integrated operation and execution system together with vendor-specific FMC/FMS platform. In these requirements, the shop-floor level operation system plays a role of coordinating the control activity of each cell, and has to provide flexibility for the complexity of mixed operations of various cells. This paper suggests a system architecture for the mixed environments of multi-cells and job shop, its corresponding enabling technologies based on comparative studies with other related studies and commercialized systems. This approach includes a process definition model considering the integration with upper BOM-BOP and external service modules, and reconfigurable device-level interface which provides dynamic interconnections with machine tools and cell controllers. The function modules and their implementation results are also described to provide the feasibility of the proposed approaches as the flexible shop-floor operation system for the multi-cell environments.

대체기계와 공정순서를 고려한 Job Shop에서의 통합 일정계획 (Integrated Job Shop Scheduling considering Alternative Machines and Operation Sequence)

  • 최형림;박병주;박용성;강무홍
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 2003년도 추계학술대회 및 정기총회
    • /
    • pp.85-88
    • /
    • 2003
  • In case that any jobs in a Job Shop can be scheduled on more than one machine and may have flexible operation sequences, with considering such case it is very difficult and complex to make the optimal process plans and scheduling. But they should be considered for an integrated model to perform more effective process planning and scheduling in this job shop problem. In this paper, we propose GA-based scheduling method to integrate effectively the problem of alternative machines, alternative operation sequences and scheduling. The performance of proposed GA is evaluated through comparing integrated scheduling with not integrated scheduling in molding company with alternative machines and operation sequences. Also, we use benchmark problems to evaluate performance. The scheduling method in this research will apply usefully to real world scheduling problems.

  • PDF

자동차 금형 생산공정의 물류분석 (Performance Analysis of a Die FAbrication Process In Automotive Production)

  • 김상훈
    • 한국시뮬레이션학회:학술대회논문집
    • /
    • 한국시뮬레이션학회 1998년도 추계학술대회 및 정기총회
    • /
    • pp.36-40
    • /
    • 1998
  • Tool shop of the‘D’Motor Co.(DMC) fabricates dies for producing automotive press panels. In order to increase the production capacity of the tool shop, DMC established an FMS that consists of high-speed machines and a CMM at the tool shop in 1997. Due to the difference in machine capability among the existing machines and the new FMS it is needed to find an optimal way of allocating workloads among machines to maximize the production. In a way to solve this, we model the die fabrication process of the tool shop and analyze its performance by computer simulation. In this study, we at first identify the bottleneck processes of the die fabrication process under the current operation policy. Then, we derive some alternative operating policies applicable to the tool shop, and analyze the optimal operation policy by comparing the performance of the tool shop following each alternative policy.

  • PDF

엔진 블록 가공라인의 물류분석 (Performance Analysis of the Block Production Line in an Engine Production Plant)

  • 김상훈
    • 한국시뮬레이션학회:학술대회논문집
    • /
    • 한국시뮬레이션학회 1999년도 춘계학술대회 논문집
    • /
    • pp.105-109
    • /
    • 1999
  • Tool shop of the D Heavy Industries Co.(DHI) fabricates engines for a bus, truck, small ship. In order to increase the production capacity of engines, DHI will be established the new tool shop that consists of a block line, head line, assembly line, test line and AS/RS in 1999. In order to assure the production capacity designed of the new tool shop for producing engines and improve the production process of it, it is needed to find a bottleneck process and an optimal way of allocating workloads among machines and workers to maximize the production. In a way to solve this, we model the engine fabrication process of the tool shop and analyze its performance by computer simulation. In this study, we at first identify the bottleneck processes of the engine fabrication process under the designed operation policy. Then, we derive some alternative operating policies applicable to the new tool shop of an engine, and analyze the optimal operation policy by comparing the performance of the tool shop following each alternative policy.

  • PDF

이기종 멀티 셀 유연생산환경에서의 실시간 통합운용을 위한 공정관리 체계 (Process Management Systems for Integrated Real-Time Shop Operations in Heterogeneous Multi-Cell Based Flexible Manufacturing Environment)

  • 윤주성;남성호;백재용;권기억;이동호;이석우
    • 한국생산제조학회지
    • /
    • 제22권2호
    • /
    • pp.281-286
    • /
    • 2013
  • As the product lifecycle is getting shorter and various models should be released to respond to the needs of customers and markets, automation-based flexible production line has been recognized as the core competitiveness. According to these trends, system vendors supply cell-level systems such as FMC(Flexible Manufacturing Cell) that is integration of core functions of FMS(Flexible Manufacturing System) and RMC(Reconfigurable Manufacturing Cell) that can easily extend components of FMC. In the cell-based environment, flexible management for shop floor composed of existing job shop, FMCs and RMCs from various system vendors has emerged as an important issue. However, there could be some problems on integrated operation between heterogeneous cells to use vendor-specific cell controllers and on seamless information flow with high level systems such as ERP(Enterprise Resource Planning). In this context, this paper proposes process management systems supporting integrated shop operation of heterogeneous multi-cell based flexible manufacturing environment: First of all, (1) Integrated Shop Operation System to apply the process management system is introduced, and (2) Multi-Layer BOP(Bill-Of-Process) model, a backbone of the process management system, is derived with its data structure. Finally, application of the proposed model is illustrated through system implementation results.

공정납기를 이용한 jop shop 일정계획의 발견적 기법 (A heuristic technique for jop shop scheduling using operation due dates)

  • 배상윤;김여근;김영균
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1996년도 춘계공동학술대회논문집; 공군사관학교, 청주; 26-27 Apr. 1996
    • /
    • pp.46-49
    • /
    • 1996
  • This paper presents a multi-pass heuristic for job shop scheduling with due dates. The proposed heuristic iteratively improves solutions based on operation due dates. To find a good solution efficiently, a method for searching the neighborhood of current schedule is developed. The heuristic is compared with two existing heuristics as well as several dispatching rules in terms of solution quality and computation time. The experimental results show that the proposed approach is promising.

  • PDF

대안기계를 갖는 Jop Shop scheduling을 위한 발견적기법의 개발 (Development of heuristic method for job shop scheduling with alternative machines)

  • 최동순;정병희
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 1996년도 추계학술대회발표논문집; 고려대학교, 서울; 26 Oct. 1996
    • /
    • pp.303-306
    • /
    • 1996
  • This paper proposes a heuristic method for job shop scheduling with alternative machines. Our heuristic suggests four machine-selecting rules and two priority dispatching rules for modifying existent ones considering alternative machines, and then it extends existing nondelay/active job shop schedule generation. This heuristic provides good criteria(rules) in the selection of a proper machine among those performing a specific operation and for the dispatch of an operation to a selected machine and thus these rules permit the efficient job shop scheduling with alternative machines. The performances of our four machine-selecting rules in addition to the two priority dispatching rules, applied together with the existing 17 rules, are experimented and evaluated, respectively.

  • PDF

POSCO 광양 4냉연공장의 ROLL SHOP 자동화 운영기술 (Roll Shop Automation of Newly Completed No.4 CRM of Kwangyang Works, POSCO)

  • 이훈휘;최병조;조뇌하;김익준;조병용
    • 한국소성가공학회:학술대회논문집
    • /
    • 한국소성가공학회 1999년도 제3회 압연심포지엄 논문집 압연기술의 미래개척 (Exploitation of Future Rolling Technologies)
    • /
    • pp.208-216
    • /
    • 1999
  • Nowadays coustomer's needs for high surface quality steel sheet has greatly increased, so it is necessary to pay more attention to the roll grinding, texturing and handling. POSCO can acquire high surface quality roll and high productivity through World-first fully automated Roll Shop system which had been constructed '94.10.1∼'97.8.28 at Kwangyang Works. Roll Shop Automation System consists of Level-I, II, III control system and 23 automated machines. After the completion of the construction, the system started smoothy and keeps its operation with high productivity as expected. The installation of this system gave an epoch-making man power saving. This paper introduce its main facilities and operation.

  • PDF

대안기계를 고려한 Job Shop Scheduling의 발견적 기법 (A Heuristic Method for Job Shop Scheduling Considering Alternative Machines)

  • 최동순;정병희
    • 산업경영시스템학회지
    • /
    • 제20권43호
    • /
    • pp.127-137
    • /
    • 1997
  • This paper proposes a heuristic method for job shop scheduling with alternative machines. Our heuristic suggests two machine-selecting rules and two priority dispatching rules for modifying existent ones considering alternative machines, and then it extends existing nondelay/active job shop schedule generation. This heuristic provides good criteria(rules) in the selection of a proper machine among those performing a specific operation and for the dispatch of an operation to a selected machine and thus these rules permit the efficient job shop scheduling with alternative machines. The performances of our two machine-selecting rules in addition to the two priority dispatching rules, applied together with the existing 17 rules, are experimented and evaluated, respectively.

  • PDF

Job Shop 일정계획의 성능 향상을 위한 할당규칙의 정보 (The Information of Dispatching Rules for Improving Job Shop Performance)

  • 배상윤
    • 산업경영시스템학회지
    • /
    • 제29권4호
    • /
    • pp.107-112
    • /
    • 2006
  • This study presents the new dispatching rules for improving performance measures of job shop scheduling related to completion time and due dates. The proposed dispatching rule considers information, which includes the comparison value of job workload, work remaining, operation time, and operation due dates. Through computer experiments, the performance of the new dispatching rules is compared and analyzed with the existing rules. The results provide a guidance for the researchers to develop new dispatching rules and for practitioners to choose rules of job shop scheduling.