• Title/Summary/Keyword: Shipbuilding and Marine Industry

Search Result 153, Processing Time 0.025 seconds

A Study on the Analysis of Welding Distortion for Moon Pool Structure of FPSO Vessel (FPSO선 Moon Pool구조의 용접변형 해석에 관한 연구)

  • KIM SANG-IL
    • Journal of Ocean Engineering and Technology
    • /
    • v.17 no.3 s.52
    • /
    • pp.27-32
    • /
    • 2003
  • The welding distortion of a hull structure in the shipbuilding industry is inevitable at each assembly stage. The geometric inaccuracy caused by the distortion tends to preclude the introduction of automation and mechanization. Thus, additional man-hours are needed for the adjusting work in the assembly stage. To overcome this problem, a distortion control method should be applied. For this purpose, it is necessary to develop an accurate prediction method that can explicitly account for the influence of various factors on the welding distortion. In order to minimize the weld-induced residual deformation, this paper proposes the optimum welding sequence as a method for distortion control. The validity of this method has been substantiated by a number of numerical simulations and experiments.

A Study on the Spatial Features of Shipbuilding Subcontract Structures (조선산업 하청구조의 공간 특성에 관한 연구)

  • 우연섭
    • Journal of the Korean Geographical Society
    • /
    • v.39 no.1
    • /
    • pp.116-131
    • /
    • 2004
  • The purpose of this study is to inquiry spatial features of shipbuilding subcontract structures. These days, firms are trying to get their goals by wav of production system which is related to other firm. Shipbuilding subcontract structures which builds complex and grand plant show a different peculiarity according to spatial features having rules of business relations with contracting firms. First of all, internal subcontracting firms which takes part in the production process of contracting firm and shipbuilding cooperative complex firms which showing a peculiarity of spin-off firms are closely related with contracting firm. And firms in Changwon that have a specialized with machine industry and those of Busan that have made development in marine equipment industries traditionally are connected with subcontract relations because of a high level of specialization relatively. On the other hand, subcontracting firms which range from non-localized and provide standardized products are less connected with contracting firm. In order to develop of Korea' shipbuilding industry, first, close cooperative relation is important with subcontracting firms which concentrate internal and outside contacting firm. And, it is necessary to strengthen selective business relations with far distance firms which are specialized in technology.

A Study on Generation Method of Sloshing Impact Pressure Data Using Generative Adversarial Networks (GAN을 이용한 슬로싱 충격압력 데이터 생성 방법 연구)

  • Bo-gyeong Kang;Sang-jin Oh;Sang-Beom Lee;Jun-Hyung Jung;Sung-chul Shin
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.26 no.1
    • /
    • pp.35-46
    • /
    • 2023
  • A model test is performed to measure the sloshing impact pressure in the liquid tank. A preprocessing is performed to learn the model test results applied with various environmental conditions. In this study, we propose a method for generating data similar to the total pressure data using Generative Adversarial Networks. In addition, after approximating the generated result to the three parameter Weibull distribution, the difference of the three parameters was compared through the RMSE and SMAPE calculation results. As a result, the distribution of the generated data showed similar results to the total pressure data distribution.

Current Status of the 2nd Generation of Intact Stability: Investigation of the Pure Loss of Stability and Parametric Roll Mode

  • Chung, Jaeho;Shin, Dong Min;Kim, Won-Don;Moon, Byung Young
    • Journal of Ocean Engineering and Technology
    • /
    • v.34 no.2
    • /
    • pp.55-65
    • /
    • 2020
  • A review of the 2nd generation of intact stability by the International Maritime Organization is performed. The main issues with the new stability criteria are reviewed. In particular, the physical background and related mathematical formulations of the pure loss of stability and parametric roll are summarized. Based on a literature review, benchmark calculation results for 17 different types of ships are discussed, and the final results are in excellent agreement with our physical expectations. Some relatively serious design problems are found in the application of the new stability criteria to sample ships built in Korea, and possible technical solutions are proposed, which have to be improved in the coming years.

The opening efficiency of the miniaturized small-scale net for anchovy boat seine to reduce the fleet size (선단축소를 위한 기선권현망 축소형 소형어구의 전개성능)

  • AN, Young-Su;BACK, Young-su;JIN, Song-han;JANG, Choong-Sik;KANG, Myoung-hee;CHA, Bong-jin;CHO, Youn-hyoung;CHA, Ju-hyeng;KIM, Bo-Yeon
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.55 no.1
    • /
    • pp.7-19
    • /
    • 2019
  • This study was conducted in order to improve opening efficiency of the miniaturized small-scale net for anchovy boat seine gear to reduce the fleet size. Field experiment was performed to observe geometry of nets by catcher boats. When the distance between the two ships was 150, 300 and 450 m and the speed of towing nets was 0.6, 0.9, and 1.2 kt, the vertical opening and actual opening of each part of the miniaturized small-scale net was as follows: the front part of the wing net, 6.8-9.5 m, 45-63%; the middle part of the wing net, 16.1-30.7 m, 34-65%; the entrance of the inside wing net, 21.6-41.2 m, 44-84%; the square and bosom, 17.4-34.0 m, 38-75%; the entrance of the body net, 16.5-29.4 m, 36-64%; the entrance of the bag net, 14.5-21.9 m, 70-106%; the flapper, 6.7-7.7 m, 81-83%, and the end of the bag net, 8.6-10.9 m, 64-81%. The tension of towing nets was measured to be 2,734-6,812 kg approximately, which indicates that the fleet can tow nets with 350 hp, the standard engine horse power. The fishing operation time was shortened comparing to existent net with the large-scale buoy attachment operation. It was also possible to operate the ship without fish detecting boat.

Plan for Vitalization of Busan New Port by Activating Ship-Repair Industry (수리조선산업을 활용한 부산신항 활성화 방안)

  • Oh, Jin-Seok;Sin, Yong-Jon;Lee, Sang-Deuk
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.31 no.6
    • /
    • pp.810-817
    • /
    • 2007
  • Every ports is making great efforts to get competitiveness. It is progressing for the research on port model of new concept that connect port-related business to be developed from base running simple cargo processing to universal port that has economical efficiency and competitiveness, This research shows development way of Busan port that connect ship-repair industry which is port-related business. Development way is especially handled link between port and ship-repair industry field activation of high value-added ship as LNG etc.

A Study on Assessment of Stress at Work between White and Blue Collar Workers in Shipyard (조선업에서 사무직과 생산직 근로자의 직무스트레스 평가에 관한 연구)

  • Jeong, Hyunwook;Kim, Yuchang
    • Journal of the Korean Society of Safety
    • /
    • v.30 no.5
    • /
    • pp.80-85
    • /
    • 2015
  • In recent years, Korea's shipbuilding industry have expanded its business into offshore plant. These changes are increasing the interest on job stress in shipbuilding industry. The purpose of this study is to investigate the differences of job stressors between white and blue-collar workers. The survey was using Korean Occupational Stress Scale(KOSS) questionnaire and was administered to 8,080 workers of large shipyard company. As a result of the survey, compared with the median score of Korean workers, job stress level of shipyard company workers was low. However, seven categories of KOSS, except for job demand showed higher stress levels of blue-collar workers than white-collar workers. The overall stress level of shipyard company workers is low, however, it is important to find stressors by considering the type of work, working period etc., through a detailed analysis of KOSS 8-categories. The results of this study may be helpful to identify the level of stress and to establish preventive measures in Shipyard Company.

A Study on the Policy Directions related to the Introduction of Smart Maritime Autonomous Surface Ship (MASS) (스마트 자율운항선박(MASS)의 도입정책 연구)

  • Park, Han-Seon;Park, Hae-Ri
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2019.05a
    • /
    • pp.234-235
    • /
    • 2019
  • Smart Maritime Autonomous Surface Ship(MASS) is aiming to provide eco-friendly smart maritime navigation service based on safety, reliability and efficiency for maritime safety and marine environment protection. In the future, it is expected to bring about a radical change across the marine industry such as marine, maritime, port, logistics, ship-building and so forth. Therefore, in this paper, policy priorities related to the introduction of MASS were identified, and response strategies for each industry were set up, and a policy plan for establishing a smart maritime logistics system covering shipping, port and shipbuilding fields was proposed.

  • PDF

Design and Implementation of a Framework for Collaboration Systems in the Shipbuilding and Marine Industry (조선해양 설계분야에서 협업시스템을 위한 프레임워크의 설계 및 구현)

  • Yun, Moon-Kyeong;Kim, Hyun-Ju;Park, Min-Gil;Han, Myeong-Ki;Kim, Wan-Kyoo
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2015.05a
    • /
    • pp.270-273
    • /
    • 2015
  • In shipbuilding and marine industry, engineering and design software solutions have upgraded from the original 2D schematic data based CAD system to a modern 3D drawing-based system. Due to the fact that the massive amount of data usage in real time and data volumes of various engineering models including graphic data have increased, several problems such as lack of server resources and improper handling of 3D drawings have been raised. Besides, increasing the number of session connections per server can cause deterioration of server performance. Recently, increasing the yard's sophisticated design capabilities highlighted the need to develop engineering and design system which would not only overcome the network performance issues, but would provide efficient collaborative design environment. This paper presents an overview of the framework for collaborative engineering design system based on the virtual application (Citrix XenApp 6.5)and acceleration hardware technology of 3D graphics (NVIDIA GRID K2 solution).

  • PDF

Proposal of Informatization Performance Management Model for the ETO-based Shipbuilding and Marine Industry (ETO 기반 조선해양분야를 위한 정보화 성과관리모형 제안)

  • So, Seung-Uk;Kim, Seung-Hee
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.21 no.2
    • /
    • pp.157-167
    • /
    • 2021
  • Despite the importance of information technology, research on information-oriented performance management and performance management methods are very insufficient. In this paper, the SSU-ITPM model, a company-wide informatization performance evaluation and management model that reflects the characteristics of the shipbuilding and marine industry with high cooperative and process complexity, was presented. This model consisted of informatization planning and project management, informatization field utilization evaluation, informatization utilization quality evaluation, informatization user satisfaction evaluation, and informatization effect achievement evaluation. In addition, through the application of Company D, the feasibility of practical application of the model was confirmed. This study is expected to provide a practical reference model for informatization performance management of ETO plant-based companies such as the shipbuilding and offshore sector.