• Title/Summary/Keyword: Ship block assignment

Search Result 2, Processing Time 0.015 seconds

Automation of block assignment planning using a diagram-based scenario modeling method

  • Hwang, In Hyuck;Kim, Youngmin;Lee, Dong Kun;Shin, Jong Gye
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.6 no.1
    • /
    • pp.162-174
    • /
    • 2014
  • Most shipbuilding scheduling research so far has focused on the load level on the dock plan. This is because the dock is the least extendable resource in shipyards, and its overloading is difficult to resolve. However, once dock scheduling is completed, making a plan that makes the best use of the rest of the resources in the shipyard to minimize any additional cost is also important. Block assignment planning is one of the midterm planning tasks; it assigns a block to the facility (factory/shop or surface plate) that will actually manufacture the block according to the block characteristics and current situation of the facility. It is one of the most heavily loaded midterm planning tasks and is carried out manually by experienced workers. In this study, a method of representing the block assignment rules using a diagram was suggested through analysis of the existing manual process. A block allocation program was developed which automated the block assignment process according to the rules represented by the diagram. The planning scenario was validated through a case study that compared the manual assignment and two automated block assignment results.

A Case Study on Assembly Block Operations Management at Shipyard (조선 조립블록 운영관리에 관한 사례연구)

  • Park, Chang-Kyu;Seo, Jun-Yong
    • Korean Management Science Review
    • /
    • v.23 no.2
    • /
    • pp.175-185
    • /
    • 2006
  • How to efficiently manage assembly blocks at shipyard has been a hot management issue in the shipbuilding Industry, because it has significantly influenced on the productivity of shipbuilding process. This paper introduces the real practice of assembly block operations management in Hyundai Heavy Industries (HHI) and the Ship Assembly Block Operations Optimization (SABOO) project that h3s been launched in HHI as an academy-and-industry collaborative project, aimed to diagnose problems, propose possible solutions, and develop a prototype system in order to search ways of improving the assembly block operations management. Through the field interviews, observations, and benchmarking studies, the SABOO project diagnosed the most rudimental and urgent problem and proposed possible solutions. In addition, the SABOO project developed the prototype system that embodied the visual function of monitoring the shipyard on a real-time and the Interactive block assignment function that utilized the assembly block assignment algorithm developed by the project. As a whole, the SABOO project tested the possibility and gained an insight in extending the functions of block transportation/stockyard management system.