• 제목/요약/키워드: Shield layer

검색결과 115건 처리시간 0.024초

코팅공정 개선에 의한 TiN코팅 고속도강 공구의 내마모특성 향상 (Enhancenent of Wear Resistance of TiN Coated High Speed Steel Tools through Improving some Coating Processes)

  • Lee, Y.M.;Son, Y.H.;Kim, H.S.;Back, J.Y.
    • 한국정밀공학회지
    • /
    • 제13권11호
    • /
    • pp.32-37
    • /
    • 1996
  • Using the are ion plating(AIP) process, TiN coating was deposited onto high speed steel substrates. The effects of coating thickness, titanisum interlayer and shield on wear resisting capability of the coated tools were investigated. In order to promote good adhesion between the substrate and the TiN coating a thin Ti interlayer was deposited. A shield was set up also between Ti target and high speed steel substrates to prevent molten droplets from reaching the substrate. Three series of varying thickness of TiN coated layer were prepared with or without the Ti interlayer, and with or without the shield. The tools with the Ti layer and the shield showed longer tool lifes than those of other series of tools and the commercially available TiN coated HSS tools, by up to 70%.

  • PDF

다층단열재와 증기냉각쉴드를 사용한 액체수소 저장용기의 열해석 (Thermal Analysis of a Liquid Hydrogen Vessel with Multi-Layer-Insulation and Vapor-Cooled Shield)

  • 정일권;강병하
    • 한국수소및신에너지학회논문집
    • /
    • 제16권3호
    • /
    • pp.284-289
    • /
    • 2005
  • Thermal analysis of cryogenic-capable vessels with insulations have been carried out to store liquid hydrogen($LH_2$). The combined insulations of MLI(Multi-Layer Insulation) and VCS(Vapor-Cooled Shield) under high vacuum are considered in the analysis for various volumes of vessels. Vapor-Cooled Shields(VCS) are installed at cylinder wall as well as disc side of the $LH_2$ vessels. The results indicate that optimal distribution of boiloff vapor from $LH_2$ vessel into two sides of VCS exists based on the evaporation loss. As the volume of $LH_2$ vessel is increased, mass flow rate of boiloff is increased while the evaporation loss per unit volume is decreased.

쉴드 TBM 세그먼트 지수재의 배열수 변화에 따른 방수성능 평가 (Waterproofing performance evaluation according to the number of layer for shield TBM segment hydrophilic rubber waterstop)

  • 함수권;정훈;김범주;정경한;이석원
    • 한국터널지하공간학회 논문집
    • /
    • 제22권1호
    • /
    • pp.47-58
    • /
    • 2020
  • 최근 국내에서는 쉴드 TBM (Tunnel Boring Machine)을 이용한 터널 굴착에 대한 관심이 크게 증가하고 있다. 쉴드 TBM 터널은 비배수 터널로써 세그먼트 이음부에서 누수가 발생할 경우에는 터널의 사용성 및 안정성에 문제가 될 수 있다. 본 연구에서는 쉴드 TBM 터널의 세그먼트 시공 시 시공오차 및 세그먼트 과다변형에 의한 수팽창 지수재의 방수 성능을 검토하였다. 특히, 수팽창 지수재 1열 배열 및 2열 배열 각각에 대하여 방수 성능을 검토하여, 2열배열의 효율성을 검증하였다. 실험결과, 1열 배열 및 2열 배열 수팽창 지수재는 동일한 방수 성능을 보였다. 즉, 1열 배열 및 2열 배열 모두, 수팽창 지수재는 엇갈림에 대해서는 대응성이 좋으나, 틈새 간격에 대해서는 대응성이 불리한 것으로 나타났다.

순채 생육지에서 수체와 저토의 환경요인 분석 (Characterization of Water and Sediment Environment in Water Shield (Brasenia schreberi) Habitats)

  • Kim, Yoon-Dong
    • The Korean Journal of Ecology
    • /
    • 제19권3호
    • /
    • pp.209-216
    • /
    • 1996
  • In order to identify the habitat characteristics of water shield (Brasenia schreberi), water quality and sediment characters were investigated. Water shield had peculial habitats such as old reservoir, developed basin-like reservior, a water depth within 1.5 m, constant water level, and thick sediment layer at the bottom. The species had very dense populations under the favorable growing conditions and occasionally grew together with Utricularia japonica. When water shield decreased, Nelumbo nucifera, Nuphar japonicum and Zizania latifolia increased. Natural populations of water shield need protection because it is endangered by the human activities and their harvest. The optimal conditions for the growth of water shield was near neutral pH. low conductivity and low turbidity. Therefore the input of pollutants should be controlled for its growth. The inorganic ion contents such as K, Mg, and Na were higher in the water shield growing area. Especially iron content of the sediments in the reservoirs with water shield was nearly five times as high as that in the reservoirs without water shield. thus iron might be one of the major limiting factors for the growth. It was considered that molybdenum can be another major factor because water shield is a nitrogen fixing plant.

  • PDF

Increased impedance by quench at a shield layer of HTS power cable for fault current limiting function

  • Choi, Youngjun;Kim, Dongmin;Cho, Jeonwook;Sim, Kideok;Kim, Sungkyu;Kim, Seokho
    • 한국초전도ㆍ저온공학회논문지
    • /
    • 제21권4호
    • /
    • pp.59-63
    • /
    • 2019
  • To reduce the fault current below the current capacity of a circuit breaker, researches on HTS (High Temperature Superconductor) power cables with fault current limiting (FCL) function are increasing. An FCL HTS power cable transports current with low a impedance during normal operation. Yet, it limits the fault current by an increased inductive or resistive impedance of conducting layer when quench occurs at the FCL HTS power cable by the large fault current. An inductive type FCL HTS power cable uses increased inductive impendence caused by leakage magnetic flux outside the cable core when the quench occurs at a shield layer losing the magnetic shielding effect. Therefore, it has an advantage of less resistive heating than resistive type FCL HTS power cable and temperature increase is suppressed. This paper describes an ideal circuit model for the FCL HTS power cable to investigate the effectiveness of increased inductive impedance when quench occurs at the shield layer. Then, FEM analysis is presented with a simplified model cable composed of various iron yokes to investigate the effect of the shape of yoke on the generation of the inductive impedance.

Optimization of radiation shields made of Fe and Pb for the spent nuclear fuel transport casks

  • V.G. Rudychev;N.A. Azarenkov;I.O. Girka;Y.V. Rudychev
    • Nuclear Engineering and Technology
    • /
    • 제55권2호
    • /
    • pp.690-695
    • /
    • 2023
  • Recommendations are given to improve the efficiency of radiation protection of transport casks for SNF transportation. The attenuation of ${\gamma}$-quanta of long-lived isotopes 134Cs, 137mBa(137Cs), 154Eu and 60Co by optimizing the thicknesses and arrangement of layers of Fe and Pb radiation shields of transport casks is studied. The fixed radiation shielding mass (fixed mass thickness) is chosen as the main optimization criterion. The effect of the placement order of Fe and Pb layers in a combined two-layer radiation shield with an equivalent thickness of 30 cm is studied in detail. It is shown that with the same mass thicknesses of the Fe and Pb layers, the placement of Fe in the first layer, and Pb - in the second one provides more than twofold attenuation of ${\gamma}$-quanta compared to the reverse placement: Pb - in the first layer, Fe - in the second. The increase in the efficiency of attenuation of ${\gamma}$-quanta for TC with combined shielding of Fe and Pb is shown to be achieved by designing the first layer of radiation shielding around the canister with SNF from Fe of the maximum possible thickness.

쉴드 TBM터널 상부 지반 연약대 전기탐사 (Electrical Resistivity Imaging for Upper Layer of Shield TBM Tunnel Ceiling)

  • 정현기;박철환
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 춘계 학술발표회 논문집
    • /
    • pp.401-408
    • /
    • 2005
  • Recently shield TBM tunnellings are being applied to subway construction in Korean cities. Generally these kinds of tunnellings have the problems in the stability of ground such as subsidence because urban subway is constructed in the shallow depth. A sinkhole occurred on the road just above the tunnel during tunneling in Kwangju, so a survey for upper layer of the tunnel was needed. But conventional Ground Probing Radar can't be applicable due to the presence of steel-mesh screen in the shield segment, so no existent geophysical method is applicable in this site. Because the outer surface of each shield segment is electrically insulated, dipole-dipole resistivity method which is popular in engineering site investigation, was tried to this survey for the first time. Specially manufactured flexible ring-type electrodes were installed into the grouting holes at an interval of 2.4 m on the ceiling. The K-Ohm II system which has been developed by KIGAM and tested successfully in many sites, was used in this site. The system consists of 1000Volt-1Ampere constant-current transmitter, optically isolated 24 bit sigma-delta A/D conversion receiver - maximum 12 channel simultaneous measurements, and graphical automatic acquisition software for easy data quality check in real time. Borehole camera logging with circular white LED lighting was also done to investigate the state of the layer. Measured resistivity data lack of some stations due to failing opening lids of holes, shows general high-low trend well. The dipole-dipole resistivity inversion results discriminate (1) one approximately 4 meter diameter cavity (grouted but incompletely hardened, so low resistivity - less than $30{\Omega}m$), (2) weak zone (100-200${\Omega}m$), and (3) hard zone (high resistivity - more than 1000${\Omega}m$) very well for the distance of 320 meters. The 2-D inversion neglects slight absolute 3-D effect, but we can get satisfactory and useful information. Acquired resistivity section and video tapes by borehole camera logging will be reserved and reused if some problem occurs in this site in the future.

  • PDF

Experimental and numerical study on the stability of slurry shield tunneling in circular-gravel layer with different cover-span ratios

  • Liu, Xinrong;Liu, Dongshuang;Xiong, Fei;Han, Yafeng;Liu, Ronghan;Meng, Qingjun;Zhong, Zuliang;Chen, Qiang;Weng, Chengxian;Liu, Wenwu
    • Geomechanics and Engineering
    • /
    • 제28권3호
    • /
    • pp.265-281
    • /
    • 2022
  • A set of slurry shield test system capable of cutter cutting and slurry automatic circulation is used to investigate the deformation characteristics, the evolution characteristics of support resistance and the distribution and evolution process of earth pressure during excavating and collapsing of slurry shield tunneling in circular-gravel layer. The influence of cover-span ratio on surface subsidence, support resistance and failure mode of excavation face is also discussed. Three-dimensional numerical calculations are performed to verify the reliability of the test results. The results show that, with the decrease of the supporting force of the excavation face, the surface subsidence goes through four stages: insensitivity, slow growth, rapid growth and stability. The influence of shield excavation on the axial earth pressure of the front soil is greater than that of the vertical earth pressure. When the support resistance of the excavation face decreases to the critical value, the soil in front of the excavation face collapses. The shape of the collapse is similar to that of a bucket. The ultimate support resistance increase with the increase of the cover-span ratio, however, the angle between the bottom of the collapsed body and the direction of the tunnel excavation axis when the excavation face is damaged increase first and then becomes stable. The surface settlement value and the range of settlement trough decrease with the increase of cover-span ratio. The numerical results are basically consistent with the model test results.

22.9kV 중성점 다중접지계통에 CD형 초전도케이블을 적용한 경우의 지락전류변화 (Ground Fault Current Variation of 22.9kV Multi Neutral Grounded Distribution System with CD Type Superconducting Cable)

  • 이종배;황시돌;손송호;이근준
    • 전기학회논문지
    • /
    • 제56권6호
    • /
    • pp.993-999
    • /
    • 2007
  • This paper discusses the effects of CD type superconducting cable operation in 22.9kV multi neutral grounded distribution system during L-G fault and counterplans to power system protection. In case of using the 3-phase CD-type superconducting cable, the inductance of superconducting cable system would be decreased due to the current of shield part of superconducting cable, which is opposite direction and nearly equal value with respect to main superconductor. However, when the shield circuit system is operated in shorted state, shield current decreases faulted ground current and give effects to power system protection scheme. This study examines the phenomena of single line to ground fault case in above mentioned system using the EMTDC program and discusses the right operation method of superconducting shield.

Field test and research on shield cutting pile penetrating cement soil single pile composite foundation

  • Ma, Shi-ju;Li, Ming-yu;Guo, Yuan-cheng;Safaei, Babak
    • Geomechanics and Engineering
    • /
    • 제23권6호
    • /
    • pp.513-521
    • /
    • 2020
  • In this paper, due to the need for cutting cement-soil group pile composite foundation under the 7-story masonry structure of Zhenghe District and the shield tunnel of Zhengzhou Metro Line 5, a field test was conducted to directly cut cement-soil single pile composite foundation with diameter Ф=500 mm. Research results showed that the load transfer mechanism of composite foundation was not changed before and after shield tunnel cut the pile, and pile body and the soil between piles was still responsible for overburden load. The construction disturbance of shield cutting pile is a complicated mechanical process. The load carried by the original pile body was affected by the disturbance effect of pile cutting construction. Also, the fraction of the load carried by the original pile body was transferred to the soil between the piles and therefore, the bearing capacity of composite foundation was not decreased. Only the fractions of the load carried by pile and the soil between piles were distributed. On-site monitoring results showed that the settlement of pressure-bearing plates produced during shield cutting stage accounted for about 7% of total settlement. After the completion of pile cutting, the settlements of bearing plates generated by shield machine during residual pile composite foundation stage and shield machine tail were far away from residual pile composite foundation stage which accounted for about 15% and 74% of total settlement, respectively. In order to reduce the impact of shield cutting pile construction on the settlement of upper composite foundation, it was recommended to take measures such as optimization of shield construction parameters, radial grouting reinforcement and "clay shock" grouting within the disturbance range of shield cutting pile construction. Before pile cutting, the pile-soil stress ratio n of composite foundation was 2.437. After the shield cut pile is completed, the soil around the lining structure is gradually consolidated and reshaped, and residual pile composite foundation reaches a new state of force balance. This was because the condensation of grouting layer could increase the resistance of remaining pile end and friction resistance of the side of the pile.