Consideration of stress and load state changes using measurement results of a shield tunnel in operation (운용 중 쉴드터널 계측결과를 이용한 응력 및 하중상태 변화추이 고찰)

  • Yong Hag Kim;Kook Hwan Cho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.26 no.5
    • /
    • pp.463-476
    • /
    • 2024
  • The shield TBM method can eliminate environmental hazards such as noise and vibration, and is environmentally friendly and allows safe tunnel construction even in soft ground conditions, but there are many restrictions on its application due to its high construction costs compared to the NATM. Therefore, in order to increase the applicability of the shield TBM method, it is necessary to ensure economic efficiency by reducing construction costs, and it is very important to reduce segment construction costs, which account for the largest proportion of shield TBM tunnel construction costs at about 35 to 40%. As part of this, this paper considers the changes in segment stress during tunnel construction and operation, tunnel external load conditions, etc. through analysis of long-term measurement data of shield TBMs in Japan, which has abundant experience in shield TBM construction, and compares and analyzes the differences between predicted values at the design stage and measured values during operation. Through this, we study improvements to ensure segment economic efficiency at the shield TBM design stage.

A Case Study of Delay Analysis for E.P.B Shield TBM Method in Construction Site (E.P.B(Earth Pressure Balance) Shield TBM 공사의 공기지연 사례연구)

  • Kwak, Jun-Hwan;Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.6D
    • /
    • pp.737-743
    • /
    • 2009
  • Shield TBM, since it was employed for Suyoungman Bay riverbed tunnel of Busan Subway in 2000,has been increasingly adopted in Korea, and in line with growing popularity, the study on Shield TBM has been expanded. However the studies mostly focus on ground condition in a bid to estimate the advancement rate and develop the model for calculating the excavation efficiency, whereas the efforts to analyze the cause of delay and to develop the improvement measures have been neglected. Thus the studies were mostly intended to analyze the schedule slippage focusing on ground conditions, while the study on schedule behind due to equipment itself and related facilities have yet to be attempted in earnest. This study hence was aimed at evaluating the troubles and schedule slippage caused by mechanical elements such as shield TBM equipment and tools and ground conditions, making use of FMEA approach so as to analyze the risk of schedule delay by such elements, thereby proposing the preventive measures to deal with high-risk factors. So, this study suggest the solution to highly ranked trouble factor for the purpose of enhance the efficiency on Shield TBM.

A study on the establishment of domestic criteria through analysis of shield TBM requirements in overseas ITB (Invitation to Bid) (해외 쉴드TBM 입찰안내서 분석을 통한 국내 발주 기준 정립에 관한 연구)

  • Kim, Ki-Hwan;Kim, Hyouk;Mun, Cheol-Hwa;Kim, Young-Hyu;Kim, Dong-Ho;Lee, Jae-Yong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.6
    • /
    • pp.985-997
    • /
    • 2017
  • In many countries, most of the tunneling works have been ordered by the shield TBM, and also Korean companies are actively bidding and execute in this project. In case of Korea, refurbished machines are mainly using in power cable, gas pipelines, and water and sewage tunnel. Also in metro projects, shield TBM of over diameter 7m is required mainly by using brand new machine. Since the shield TBM is not easy to change once it is produced, it is necessary for the client to provide sufficient information on the production conditions so as to satisfy various characteristics of the construction. In this study, to manufacturing optimal shield TBM, the Client's TBM requirements of tunnel construction in Hong Kong and UK was analyzed and compared with the domestic requirements. The results are expected to provide as client's guidelines for bidding stage and manufacturing for shield TBM tunneling in Korea in the future.

A Study on Standard Construction Process Management System for Prediction of Proper Construction Period of Subsea Tunnel (해저터널 적정 공사기간 예측을 위한 표준공정관리 체계 연구)

  • Bae, Keunwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.4
    • /
    • pp.36-47
    • /
    • 2017
  • As a typical domestic subsea tunnel construction the Gadeok subsea tunnel applying the method of immersed tunnel has been completed and the Boryeong-Taean subsea tunnel is under construction using NATM. The high-speed railway subsea tunnels between the Honam and Jeju are under consideration, and the feasibility of constructing subsea tunnels with Japan and China is also under consideration. However, it is difficult to provide the process plan information for the construction work such as the analysis of the feasibility of the subsea tunnel and the prediction of the proper construction period because there is no case of domestic construction for it applying the shield TBM method. Due to economic and other reasons, government organizations are reluctant to apply the shield TBM, and there is lack of data on the construction process management field using the shield TBM method. Therefore, a standard construction process management system for the subsea tunnel is needed to analyze the feasibility of the subsea tunnel and to predict the proper construction period. By presenting the standard construction process management system of subsea tunnels such as WBS, Network Diagram, and construction period calculation model, I hope to contribute technically and economically to future subsea tunnel projects.

A Case Study on Penetrating Hard Rock with Alternative Methods of Shield TBM for Weathered Layer in Subway Construction (지하철공사에서 풍화대용 쉴드 TBM의 경암 구간 굴진 시 대체공법에 대한 사례연구)

  • Park, Hyung-Keun;Ko, Won Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6D
    • /
    • pp.623-629
    • /
    • 2010
  • Recently, the Shield TBM (Tunnel Boring Machine) construction method is used gradually to increase at the Tunnel Constructin site. However the design and application of the Shield TBM were carried out without sufficient investigation of the ground conditions in the construction site. Due to insufficient understanding to the corresponding equipment is frequently occurring unexpected construction cost and extension of a construction period. The most suitable alternative construction method was determined by analyzing tunneling rate, duration, construction cost of shield machine and tunneling data of alternative method. The result of the case study is suggested as follows. First, the accurate soil exploration on the construction site should be preceded to prevent from tunneling stoppage and schedule delay. Second, the most suitable selection of the shield machine to the ground conditions of the construction site should be executed based on the investigation. Third, the best alternative method for boring of hard rock section is 'hard rock blasting after open cut and cover method'.

State of the Art of Segment Lining in Shield Tunnel and Statistical Analysis of Its Key Design Parameters (쉴드터널 세그먼트 라이닝의 최신 기술동향과 핵심 설계항목의 통계 분석)

  • Chang, Soo-Ho;Lee, Gyu-Phil;Choi, Soon-Wook;Bae, Gyu-Jin
    • Tunnel and Underground Space
    • /
    • v.21 no.6
    • /
    • pp.427-438
    • /
    • 2011
  • Segment lining is a key permanent lining structure to maintain the shield tunnel stability in shield tunnel operation. Moreover, segment lining generally accounts for the largest proportion in the shield tunnel construction costs. As a result, technical improvements to increase its economic feasibility have been actively carried out. This study aims to propose the development directions of high-performance segments from their recent cutting technologies. In addition, based on over 2,100 world-widely collected segment design data, a series of statistical analyses of segment key design parameters such as thickness, width and the number of divisions as well as segment materials were carried out to approximately estimate them in a design stage.

쉴드터널의 계측시스템 구축

  • 진치섭;김성준
    • Computational Structural Engineering
    • /
    • v.8 no.2
    • /
    • pp.12-25
    • /
    • 1995
  • Shield 터널의 굴진에 따른 지반변위를 Real Time으로 측정하여 지반변위를 가장 작게 일으키는 굴진 Pattern을 결정하는 것이 계측시스템구축의 목적이다. 대상지반은 부산시 구포전력구 현장의 대표적인 지반이라 생각되는 Silt 층인 #11 작업구 인근과 모래층인 #7 작업구 인근에서 각각 실시하였다. 계기매설에서 계측결과분석은 1994년 6.22-11.5에 수행하였다. 계측결과로부터 얻어지는 효과는 Shield 터널굴진에 따른 지반변위의 형태와 크기를 파악할 수 있고 가장 적절한 굴진 Pattern 제시로 인근 매설물에 영향을 미치지 않는 시공을 가능케 하며 자동계측의 계기매설 및 계측기술을 습득할 수 있다. 본 전력구 공사에서는 자동계측용 Computer Software 및 관련장비를 확보하고 국내 최초의 Shield 터널 자동계측을 수행하였다.

  • PDF