• Title/Summary/Keyword: Setup time

Search Result 661, Processing Time 0.025 seconds

The Research of the CDMA Base station Traffic Analysis for Using the RTD Method (RTD 방식을 이용한 CDMA 기지국 Traffic 분석에 관한 연구)

  • Jo, Ung;Chin, Yong-Ohk
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.25 no.5A
    • /
    • pp.660-667
    • /
    • 2000
  • This paper aims at analyzing the traffic of CDMA base station. RTD(Round Trip Delay) method, used for the study, is one of the developed tool for calculating the call setup time between the BTS(Base Station TransceiverSubsystem) and mobile station.We compare the calculated call setup time in air with the field experiments.And we suggest the RTD method for dividing the traffic of the connected repeater from that of the BTS, andwe can testify it by the experiment which analyze the difference of the received time between the base stationand the repeater including the forced delay elements.

  • PDF

An Experiment on On-Demand Circuit Provisioning in SONET/SDH ASON Networks (지능형 광 전달망에서의 on-demand 회선 생성 성능 분석 실험)

  • Nga, Kinh Thi Thuy;Kim, Byung-Jae;Lee, Yong-Gi;Kang, Min-Ho
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2005.08a
    • /
    • pp.174-179
    • /
    • 2005
  • In the SONET/SDH based ASON, one VC3 connection contains 21 VC12 calls. Hence, it can serve up to 21 VC12 calls. When a new VC12 call arrives, if there exists at least one available VC3 connection in the network, that VC12 call is severed immediately. However, if there is no available VC3 connection, that VC12 call has to wait a certain time, called setup latency, for the a new VC3 connection to be established. This is inconvenient for the customers. On the other hand, if there are more VC3 connections than the network requires, this can waste network resources. In this paper, we proposed the solution for these problems. In order to reduce the number of VC12 calls which have to wait, we setup a new VC3 before all VC12 time slots are occupied. Furthermore, to avoid the waste of the network resources, we do not establish all VC3 connections at the same time, but do establish step by step.

  • PDF

Stock Efficiency Algorithm for Lot Sizing Problem (로트 크기 문제의 비축 효율성 알고리즘)

  • Lee, Sang-Un
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.21 no.2
    • /
    • pp.169-175
    • /
    • 2021
  • The lot sizing problem(LSP) is a hard problem that classified as non-deterministic(NP)-complete because of the polynomial-time optimal solution algorithm is unknown yet. The well-known W-W algorithm can be obtain the solution within polynomial-time, but this algorithm is a very complex, therefore the heuristic approximated S-M algorithm is suggested. This paper suggests O(n) linear-time complexity algorithm that can be find not the approximated but optimal solution. This algorithm determines the lot size Xt∗ in period t to the sum of the demands of interval [t,t+k], the period t+k is determined by the holding cost will not exceed setup cost of t+k period. As a result of various experimental data, this algorithm finds the optimal solution about whole data.

Development of Full-scale Airframe Durability Test Technique (항공기 전기체 내구성시험 기법 개발)

  • Shul, Chang-Won;Yang, Myung-Seog;Lee, Kee-Bhum;Jung, Jae-Kwon;Kang, Hui-Won;Lee, Kyung-Yong
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.32 no.6
    • /
    • pp.117-125
    • /
    • 2004
  • This paper describes the test technique for the full-scale airframe durability test according to the military handbook(MIL-HDBK-1530) and ASIP(Aircraft Structure Integrity Program) to evaluate structural integrity and to obtain basic data for IPA(Initial Production Approval) of the Korean advanced trainer(T-50). This paper covers the full-scale airframe floating setup technique, the optimized test load simulation method, test rig design technique, test setup design and installation techniques, test safety device design and operation technique, and durability test results. As 1st life durability test was successfully performed, it was confirmed that this method is available in a full-scale airframe structural test.

Distributed processing for the Load Minimization of an SIP Proxy Server (SIP 프록시 서버의 부하 최소화를 위한 분산 처리)

  • Lee, Young-Min;Roh, Young-Sup;Cho, Yong-Karp;Oh, Sam-Kweon;Hwang, Hee-Yeung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.9 no.4
    • /
    • pp.929-935
    • /
    • 2008
  • As internet telephony services based on Session initiation Protocol (SIP) enter the spotlight as marketable technology, many products based on SIPs have been developed and utilized for home and office telephony services. The call connection of an internet phone is classified into specific call connections and group call connections. Group call connections have a forking function which delivers the message to all of the group members. This function requires excessive message control for a call connection and creates heavy traffic in the network. In the internet cail system model. most of the call-setup messages are directed to the proxy server during a short time period. This heavy message load brings an unwanted delay in message processing and. as a result, call setup can not be made. To solve the delay problem, we simplified the analysis of the call-setup message in the proxy server, and processed the forking function distributed for the group call-setup message. In this thesis, a new system model to minimize the load is proposed and the subsequent implementation of this model demonstrates the performance improvement.

Backup path Setup Algorithm based on the Bandwidth Sharing in Mesh Networks (메쉬 구조의 망에서 대역 공유를 통한 복구 경로 설정 알고리즘)

  • 이황규;홍석원
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.6 no.1
    • /
    • pp.41-47
    • /
    • 2002
  • Path setup considering QoS is one of the main problems to solve in Internet traffic engineering. In network restoration that is one of the traffic engineering components, to establish a backup path or backup path for a working path to be protected is the main task. The backup path should have enough bandwidth to guarantee the working paths. Thus this work requires the QoS routing solution that is to set up a backup path as well as a working path at the same time provisioning enough bandwidth. In this paper, we propose an algorithm to setup a backup path that shares the bandwidth of other backup paths whose working path does not pass along the same link with the working path we are considering. In this way we can reduce much bandwidth consumption caused by setting up backup paths. We also analyze the disjoint path computation algorithms. Finally we show simulation results how the algorithm can reduce the bandwidth consumption and how it will affect blocking when we setup paths.

An Integrated Production and Inventory Model in a Single-Vendor Multi-Buyer Supply Chain (단일 공급자 다수 구매자 공급체인에서 통합 생산 및 재고 모형)

  • Chang, Suk Hwa
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.38 no.3
    • /
    • pp.117-126
    • /
    • 2015
  • This paper is to analyze an integrated production and inventory model in a single-vendor multi-buyer supply chain. The vendor is defined as the manufacturer and the buyers as the retailers. The product that the manufacturer produces is supplied to the retailers with constant periodic time interval. The production rate of the manufacturer is constant for the time. The demand of the retailers is constant for the time. The cycle time of the vendor is defined as the elapsed time from the start of the production to the start of the next production, while the cycle times of the buyer as the elapsed time between the adjacent supply times from the vendor to the buyer. The cycle times of the vendor and the buyers that minimizes the total cost in a supply chain are analyzed. The cost factors are the production setup cost and the inventory holding cost of the manufacturer, the ordering cost and the inventory holding cost of the retailers. The cycle time of the vendor is investigated through the cycle time that satisfies economic production quantity with the production setup cost and the inventory holding cost of the manufacturer. An integrated production and inventory model is formulated, and an algorithm is developed. An numerical example is presented to explain the algorithm. The solution of the algorithm for the numerical examples is compared with that of genetic algorithm. Numerical example shows that the vendor and the buyers can save cost by integrated decision making.

Heuristic Method for Sequencing Problem in Mixed Model Assembly Lines with Setup Time (준비시간이 있는 혼합모델 조립라인에서 투입순서문제를 위한 탐색적 방법)

  • Hyun, Chul-Ju
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2008.11a
    • /
    • pp.35-39
    • /
    • 2008
  • This paper considers the sequencing of products in mixed model assembly lines. The sequence which minimizes overall utility work in car assembly lines reduce the cycle time, the number of utility workers, and the risk of conveyor stopping. The sequencing problem is solved using Tabu Search. Tabu Search is a heuristic method which can provide a near optimal solution in real time. Various examples are presented and experimental results are reported to demonstrate the efficiency of the technique.

  • PDF

Seamless CVE Environment Using TeakLite Core for DVD Servo (DVD Servo용 IC개발에 적용한 TeakLite core 기반의 Seamless CVE 환경)

  • 서승범;안영준;배점한
    • Proceedings of the IEEK Conference
    • /
    • 2000.11b
    • /
    • pp.204-207
    • /
    • 2000
  • Verification is one of the most critical and time-consuming tasks in today's design process. This paper describes the basic idea of Co-verification and the environment setup for the design of DVD Servo with TeakLite DSP core by using Seamless CVE, Hardware/software Co-verification too1.

  • PDF

An Adaptive Dispatching Architecture for Constructing a Factory Operating System of Semiconductor Fabrication : Focused on Machines with Setup Times (반도체 Fab의 생산운영시스템 구축을 위한 상황적응형 디스패칭 방법론 : 공정전환시간이 있는 장비를 중심으로)

  • Jeong, Keun-Chae
    • IE interfaces
    • /
    • v.22 no.1
    • /
    • pp.73-84
    • /
    • 2009
  • In this paper, we propose a dispatching algorithm for constructing a Factory Operating System (FOS) which can operate semiconductor fabrication factories more efficiently and effectively. We first define ten dispatching criteria and propose two methods to apply the defined dispatching criteria sequentially and simultaneously (i.e. fixed dispatching architecture). However the fixed type methods cannot apply the criteria adaptively by considering changes in the semiconductor fabrication factories. To overcome this type of weakness, an adaptive dispatching architecture is proposed for applying the dispatching criteria dynamically based on the factory status. The status can be determined by combining evaluation results from the following three status criteria; target movement, workload balance, and utilization rate. Results from the shop floor in past few periods showed that the proposed methodology gives a good performance with respect to the productivity, workload balance, and machine utilization. We can expect that the proposed adaptive dispatching architecture will be used as a useful tool for operating semiconductor fabrication factories more efficiently and effectively.