• Title/Summary/Keyword: Series-parallel compensation

Search Result 36, Processing Time 0.025 seconds

A Voltage Balancer Based on Two Phase Interleaved IPOS DC-DC Converter for Voltage Drop Compensation in Bi-polar LVDC (양극성 저압 직류배전망에서 전압강하 복구를 위한 2상 인터리브드 IPOS DC-DC 컨버터 기반 전압 밸런서)

  • Park, Tae-Hwa;Park, Jung-Min;Park, Yun-Ji;Won, Chung-Yuen
    • Proceedings of the KIPE Conference
    • /
    • 2018.07a
    • /
    • pp.330-331
    • /
    • 2018
  • 본 논문에서는 양극성 저압 직류배전망에서 전압강하 발생 시 에너지저장시스템(ESS)을 이용한 2상 인터리브드 IPOS(Input Parallel Output Series) DC-DC 컨버터 기반의 전압 밸런서를 제안한다. ESS와 직렬로 연결된 전압 밸런서는 입력은 병렬로, 출력은 직렬 구성되어 있으며, 이러한 구성은 한 개의 ESS를 통해 두 개의 배전망을 제어할 수 있다. 제안하는 전압 밸런서는 시뮬레이션을 통하여 타당성을 검증하였다.

  • PDF

The Development and Experimental Evaluation of 100kVA Unified Power Quality Conditioner interconnected to the Li-Battery System (리튬 배터리를 연계한 100kVA UPQC 개발 및 성능시험)

  • Lee, Hak-Ju;Chae, Woo-Kyu;Park, Jung-Sung;Sohn, Jin-Man;Choi, Eun-Sik
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.26 no.10
    • /
    • pp.102-110
    • /
    • 2012
  • This paper propose the advanced topology of UPQC, its DC link is connected with Lithium battery, to compensate the momentary interruptions. The proposed system can be operated as UPS mode using the parallel inverter, which control the charge or discharge of battery, in case of the interruption. We dvelop 100kVA UPQC using the proposed topology to rise the power quality and the reliability of Microgrid. We verify its usefulness through voltage compensation test, UPS operation test and etc. using Microgrid test facility.

Application of Multi-Level Inverter for Improvement of Power Quality in AC 25[kV] Electrified Railway System (교류전기철도 전력품질 향상을 위한 직.병렬 보상장치 적용에 관한 연구)

  • Park, Soo-Cheol;Song, Joong-Ho;Chang, Sang-Hoon
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.21 no.1
    • /
    • pp.131-141
    • /
    • 2007
  • This paper proposes analysis on new equipment for power quality in electric railway. The proposed equipment consists of series inverter and parallel inverter. Each inverter is connected by capacitor as dc link. This structure can be compensated for active and reactive power in catenary through transformer. We verified the proposed equipment using the PSCAD/EMTDC and the calculation results from the proposed approach are widely described in the paper.

Design of Compensation Circuits for LED Fault in Constant Current Driving (정전류 구동에서 LED 고장 보상 회로 설계)

  • Lee, Kwang;Jang, Min-Ho
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.17 no.1
    • /
    • pp.71-76
    • /
    • 2022
  • Since brightness is proportional to the operating current, a method of connecting several LEDs in series and driving with a constant current source is widely used for driving circuits of LED lights. Because several LEDs are connected in series, if some LEDs open due to a fault, the current path is broken and all other LEDs connected in series are turned off. In this paper, we designed a circuit to solve this problem by connecting a Zener diode having a breakdown voltage of about 0.4V higher than the LED operating voltage in parallel with each LED to create a current bypass in case of LED failure. Through simulations and experiments, it was confirmed that the current of the Zener diode hardly flows when the LED is operating normally, and that the Zener diode stably operates as a current bypass when the LED fails.

Efficiency Optimization with a Novel Magnetic-Circuit Model for Inductive Power Transfer in EVs

  • Tang, Yunyu;Zhu, Fan;Ma, Hao
    • Journal of Power Electronics
    • /
    • v.18 no.1
    • /
    • pp.309-322
    • /
    • 2018
  • The technology of inductive power transfer has been proved to be a promising solution in many applications especially in electric vehicle (EV) charging systems, due to its features of safety and convenience. However, loosely coupled transformers lead to the system efficiency not coming up to the expectation at the present time. Therefore, at first, the magnetic core losses are calculated with a novel magnetic-circuit model instead of the commonly used finite-element-method (FEM) simulations. The parameters in the model can be obtained with a one-time FEM simulation, which makes the calculation process expeditious. When compared with traditional methods, the model proposed in the paper is much less time-consuming and relatively accurate. These merits have been verified by experimental results. Furthermore, with the proposed loss calculation model, the system is optimized by parameter sweeping, such as the operating frequency and winding turns. Specifically, rather than a predesigned switching frequency, a more efficiency-optimized frequency for the series-parallel (SP) compensation topology is detected and a detailed investigation has been presented accordingly. The optimized system is capable of an efficiency that is greater than 93% at a coil separation distance of 200mm and coil dimensions of $600mm{\times}400mm$.

Electric Power Energy Saving and Efficient Measures in Buildings using the Smart-Meter (스마트미터를 활용한 건축물의 전력에너지 절감 및 효율화 방안)

  • Hwang, Hyun Bae;Jung, Byeong Soo
    • Journal of Digital Convergence
    • /
    • v.12 no.11
    • /
    • pp.365-372
    • /
    • 2014
  • In this paper, We implement a power-saving and efficient measures in buildings using the smart-meter. In order to save electric power energy, We propose an improved automatic power-factor controller(APFC) and demand control measures. This is achieved by controlling directly circuit breakers and the capacitor bank feeders in real time via a two-way smart-meter's ICT skills. Improved APFC is minimizing installation costs by series-parallel connecting heterologous capacitors to form a more diverse capacitor banking and controlling using the smart-meter. In order to suppress the demand power, We have designed a smart-meter with communication functions using Atmel's AVR465 and tested an operated lodging building for 24-hours. As a result, We made sure to always retained more than 95% power factor and did not occur over compensation.