• 제목/요약/키워드: Sequence simulation

Search Result 1,073, Processing Time 0.024 seconds

An Enhanced Fast Handover Scheme for Proxy Mobile IPv6 (Proxy Mobile IPv6를 위한 개선된 신속한 핸드오버 방안)

  • Kang, Ju-Eun;Kum, Dong-Won;Cho, You-Ze
    • Journal of the Institute of Electronics Engineers of Korea TC
    • /
    • v.46 no.6
    • /
    • pp.1-10
    • /
    • 2009
  • In a network-based approach such as Proxy Mobile IPv6 (PMIPv6), the serving network controls the mobility management on behalf of a Mobile Node (MN), thereby eliminating a MN from any mobility-related signaling. Although PMIPv6 is being standardized by the IETF NetLMM WG, PMIPv6 still suffers from a lengthy handover latency and the on-the-fly packet loss during a handover. Therefore, this paper presents an enhanced fast handover scheme for PMIPv6. The proposed handover scheme uses the Neighbor Discovery message of IPv6 to reduce the handover latency and packet buffering at the Mobile Access Gateway (MAG) to avoid the on-the-fly packet loss during a handover. In addition, it uses an additional packet buffering at the Local Mobility Anchor (LMA) to solve the packet ordering problem. We evaluate the performance of the proposed handover scheme using both analytical model and simulation. The numerical analysis shows that the proposed scheme has a relatively shorter handover latency. Simulation results demonstrate that the proposed scheme could avoid the on-the-fly packet loss and ensure the packet sequence.

Design and Implementation of a Single-Chip 8-Bit Microcontroller (단일 칩 8비트 마이크로컨트롤러의 설계 및 구현)

  • Ahn, Jung-Il;Park, Sung-Hwan;Kwon, Sung-Jae
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.11 no.4
    • /
    • pp.72-81
    • /
    • 2006
  • In this paper, we first define a total of 64 instructions that are considered to be essential and frequently used, construct a datapath diagram, determine the control sequence using a finite state machine, and implement an 8-bit microcontroller using FPGA in VHDL. In the past, only functional simulation results of a rudimentary microcontroller were reported, the microcontroller lacked interrupt handling capability, or it was not implemented in hardware. We have designed a self-contained 8-bit microcontroller such that it can perform data transfer, addition, and logical operations, as well as stack and external interrupt operations. Following timing simulation of the designed microcontroller, we implemented it in an FPGA and verified its operation successfully. The design and implementation has been done under the Altera MAX+PLUS II integrated development environment using the EP1K50TC144-3 chip. The maximum operating frequency, the total number of logic elements used, and the logic utilization were found to be 9.39 MHz, 2813, and 97%, respectively. The result can be used as a microcontroller IP, and as needs arise, the VHDL code can be modified accordingly.

  • PDF

Implementation of a Kinematic Network-Based Single-Frequency GPS Measurement Model and Its Simulation Tests for Precise Positioning and Attitude Determination of Surveying Vessel (동적네트워크 기반 단일주파수 GPS 관측데이터 모델링을 통한 측량선의 정밀측위 및 자세각결정 알고리즘 구현과 수치실험에 의한 성능분석)

  • Hungkyu, Lee;Siwan, Lyu
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.33 no.2
    • /
    • pp.131-142
    • /
    • 2015
  • In order to support the development of a cost-effective river bathymetric system, this research has focused on modeling GPS observables, which are obtained by array of five single-frequency receivers (i.e., two references and three rovers) to estimate the high accurate kinematic position, and the surveying vessel altitude. Also, by applying all GPS measurements as multiple-baselines with constraining rover baselines, we derived the socalled ‘kinematic network model.’ From the model, the integer-constrained least-squares (LS) for position estimation and the implicit LS for attitude determination were implemented, while a series of simulation tests with respect to the baseline lengths around 2km performed to demonstrate its accuracy analysis. The on-the-fly (OTF) ambiguity resolution tests revealed that ninety-nine percents of time-to-fix-first ambiguity (TTFF) can be decided in less than two seconds, when the positioning accuracy of ambiguity-fixed solutions was assessed as the greater than or equal to one and two centimeters in horizontal and vertical, respectively. Comparing to the GPS-derived attitudes, the achievable accuracy gradually descended in sequence of yaw, pitch and roll due to the antenna geometric configuration. Furthermore, the RMSE values for the baseline lengths of three to six meters were within ±1′for yaw, and less than ±10′and ±20′for pitch and roll, respectively, but those of between six to fifteen meters were less than ±1′for yaw, ±5′for pitch, and ±10′for roll.

Performance Analysis of MC-DS/CDMA System with Phase Error and Hybrid SC/MRC-(2/3) Diversity (위상 에러와 하이브리드 SC/MRC-(2/3)기법을 고려한 MC-DS/CDMA 시스템의 성능 분석)

  • Kim Won-Sub;Park Jin-Soo
    • The KIPS Transactions:PartC
    • /
    • v.11C no.6 s.95
    • /
    • pp.835-842
    • /
    • 2004
  • In this paper, we have analyzed the MC-DS/CDMA system with input signal synchronized completely through adjustment of the gain in the PLL loop, by using the hybrid SC/MRC-(2/3) technique, which is said to one of the optimal diversity techniques under the multi-path fading environment, assuming that phase error is defined to the phase difference between the received signal from the multi-path and the reference signal in the PLL of the receiver. Also, assuming that the regarded radio channel model for the mobile communication is subject to the Nakagami-m fading channel, we have developed the expressions and performed the simulation under the consideration of various factor, in the MC/DS-CDMA system with the hybrid SC.MRC-(2/3) diversity method, such as the Nakagami fading index(m), $the\;number\;of\;paths\;(L_p),$ the number of hybrid SC.MRC-(2/3) $diversity\;branches\;(L,\;L_c),$ the number of users (K), the number of subcarriers (U), and the gain in the PLL loop. As a result of the simulation, it has been confirmed that the performance improvement of the system can be achieved by adjusting properly the PLL loop in order for the MC/DS-CDMA system with the hybrid SC/MRC-(2/3) diversity method to receive a fully synchronized signal. And the value of the gain in the PLL loop should exceed 7dB in order for the system to receive the signal with prefect synchronization, even though there might be a slight difference according to the values of the fading index and the spread processing gain of the subcarrier.

A methodology for an effective utilization of construction equipment for highway construction projects (도로공사 공정계획을 위한 공정 로직 및 건설장비 효율화 방안)

  • Song, Hojeong;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.26-34
    • /
    • 2014
  • Highway construction is a combination of linear, repetitive, and highly equipment intensive operations. Various types of construction equipment are deployed to ensure undisrupted performance of construction, and thus productivity improvement and cost-saving can be achieved through well-thought-out planning. The selection of construction equipment is dependent upon construction sequence, site conditions, and construction methods. In the process of planning, management should consider various types of construction methods per each type of construction operation. Also, management should map out proper construction equipment operation plan that takes the construction duration and cost measures into consideration. However, limited availability of historic data from the similar types of operations has been a stumbling block to proper construction planning, making the operations performed based upon experience and intuition guided by rules-of-thumb. As a consequence, the planing phase rarely provided an adequate validity in the implementation phase. The researchers developed a process logic for each construction type that management can utilize from early phase of highway construction planning process. Moreover, derived the construction equipment combination optimized for efficiency by using the process simulation technique. The developed method is expected to be useful for the decision-making process that aims to evaluate efficiency of various process plans and to ensure optimal selection of construction equipment for highway construction projects.

A Demodulation Method for DS/CDMA Systems (DS/CDMA 시스템을 위한 새로운 복조 방식)

  • Jung, Bum-Jin;Jin, Ming-Lu;Kwak, Kyung-Sup
    • Journal of IKEEE
    • /
    • v.2 no.2 s.3
    • /
    • pp.212-224
    • /
    • 1998
  • There are two major factors of degrading the performance in the forward link of DS/CDMA systems. One is the multiple access interference (MAI) caused by using the same frequency bands simultaneously and the other is the multipath lading due to multipath propagation. PN codes which have minimum cross correlation properties among spread spectrum codes are necessary to reduce the MAI. In the conventional IS-95A system, the PN sequence has the period of $2^{15}$ and is of the length of 64 chips for spreading each data. In this case, since the length of PN code per bit is very short compared to the period of the PN code, the performance of the conventional system is not satisfied in view of suppressing the multipath interference. However, the correlation property of the PN codes at the demodulation can be improved by increasing the interval of Integration at the demodulation. This paper proposes a demodulation method to reduce the cross correlation among PN codes. The performance of the proposed demodulation method is investigated through computer simulations. We used multipath Ray lading channel and AWGN channel in the simulation. Our simulation results show the improved performance of $0.25{\sim}0.5dB$ SNR in a given BER compared to the conventional demodulation scheme.

  • PDF

A Study of Blasting Demolition by Scaled Model Test and PEC2D Analysis (축소모형실험 및 PFC2D해석에 따른 발파해체 거동분석)

  • 채희문;전석원
    • Tunnel and Underground Space
    • /
    • v.14 no.1
    • /
    • pp.54-68
    • /
    • 2004
  • In this study, scaled model tests were performed on blasting demolition of reinforced concrete structures and the experimental results were analyzed in comparison with the results of numerical analysis. The tests were designed to induce a progressive collapse, and physical properties of the scaled model were determined using scale factors obtained ken dimension analysis. The scaled model structure was made of a mixture of plaster, sand and water at the ratio determined to yield the best scaled-down strength. Lead wire was used as a substitute for reinforcing bars. The scaled length was at the ratio of 1/10. Selecting the material and scaled factors was aimed at obtaining appropriately scaled-down strength. PFC2D (Particle Flow Code 2-Dimension) employing DEM (Distinct Element Method) was used for the numerical analysis. Blasting demolition of scaled 3-D plain concrete laymen structure was filmed and compared to results of numerical simulation. Despite the limits of 2-D simulation the resulting demolition behaviors were similar to each other. Based on the above experimental results in combination with bending test results of RC beam, numerical analysis was carried out to determine the blasting sequence and delay times. Scaled model test of RC structure resulted in remarkably similar collapse with the numerical results up to 900㎳ (mili-second).

Developing Surface Water Quality Modeling Framework Considering Spatial Resolution of Pollutant Load Estimation for Saemangeum Using HSPF (오염원 산정단위 수준의 소유역 세분화를 고려한 새만금유역 수문·수질모델링 적용성 검토)

  • Seong, Chounghyun;Hwang, Syewoon;Oh, Chansung;Cho, Jaepil
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.59 no.3
    • /
    • pp.83-96
    • /
    • 2017
  • This study presented a surface water quality modeling framework considering the spatial resolution of pollutant load estimation to better represent stream water quality characteristics in the Saemangeum watershed which has been focused on keeping its water resources sustainable after the Saemangeum embankment construction. The watershed delineated into 804 sub-watersheds in total based on the administrative districts, which were units for pollutant load estimation and counted as 739 in the watershed, Digital Elevation Model (DEM), and agricultural structures such as drainage canal. The established model consists of 7 Mangyung (MG) sub-models, 7 Dongjin (DJ) sub-models, and 3 Reclaimed sub-models, and the sub-models were simulated in a sequence of upstream to downstream based on its connectivity. The hydrologic calibration and validation of the model were conducted from 14 flow stations for the period of 2009 and 2013 using an automatic calibration scheme. The model performance to the hydrologic stations for calibration and validation showed that the Nash-Sutcliffe coefficient (NSE) ranged from 0.66 to 0.97, PBIAS were -31.0~16.5 %, and $R^2$ were from 0.75 to 0.98, respectively in a monthly time step and therefore, the model showed its hydrological applicability to the watershed. The water quality calibration and validation were conducted based on the 29 stations with the water quality constituents of DO, BOD, TN, and TP during the same period with the flow. The water quality model were manually calibrated, and generally showed an applicability by resulting reasonable variability and seasonality, although some exceptional simulation results were identified in some upstream stations under low-flow conditions. The spatial subdivision in the model framework were compared with previous studies to assess the consideration of administrative boundaries for watershed delineation, and this study outperformed in flow, but showed a similar level of model performance in water quality. The framework presented here can be applicable in a regional scale watershed as well as in a need of fine-resolution simulation.

A Prediction Search Algorithm by using Temporal and Spatial Motion Information from the Previous Frame (이전 프레임의 시공간 모션 정보에 의한 예측 탐색 알고리즘)

  • Kwak, Sung-Keun;Wee, Young-Cheul;Kimn, Ha-Jine
    • Journal of the Korea Computer Graphics Society
    • /
    • v.9 no.3
    • /
    • pp.23-29
    • /
    • 2003
  • There is the temporal correlation of the video sequence between the motion vector of current block and the motion vector of the previous block. If we can obtain useful and enough information from the motion vector of the same coordinate block of the previous frame, the total number of search points used to find the motion vector of the current block may be reduced significantly. In this paper, we propose the block-matching motion estimation using an adaptive initial search point by the predicted motion information from the same block of the previous frame. And the first search point of the proposed algorithm is moved an initial point on the location of being possibility and the searching process after moving the first search point is processed according to the fast search pattern. Simulation results show that PSNR(Peak-to-Signal Noise Ratio) values are improved UP to the 1.05dB as depend on the image sequences and improved about 0.33~0.37dB on an average. Search times are reduced about 29~97% than the other fast search algorithms. Simulation results also show that the performance of the proposed scheme gives better subjective picture quality than the other fast search algorithms and is closer to that of the FS(Full Search) algorithm.

  • PDF

Exploitation of Auxiliary Motion Vector in Video Coding for Robust Transmission over Internet (화상통신에서의 오류전파 제어를 위한 보조모션벡터 코딩 기법)

  • Lee, Joo-Kyong;Choi, Tae-Uk;Chung, Ki-Dong
    • The KIPS Transactions:PartB
    • /
    • v.9B no.5
    • /
    • pp.571-578
    • /
    • 2002
  • In this paper, we propose a video sequence coding scheme called AMV (Auxiliary Motion Vector) to minimize error propagation caused by transmission errors over the Internet. Unlike the conventional coding schemes the AMY coder, for a macroblock in a frame, selects two best matching blocks among several preceding frames. The best matching block, called a primary block, is used for motion compensation of the destination macroblock. The other block, called an auxiliary block, replaces the primary block in case of its loss at the decoder. When a primary block is corrupted or lost during transmission, the decoder can efficiently and simply suppress error propagation to the subsequent frames by replacing the block with an auxiliary block. This scheme has an advantage of reducing both the number and the impact of error propagations. We implemented the proposed coder by modifying H.263 standard coding and evaluated the performance of our proposed scheme in the simulation. The simulation results show that AMV coder is more efficient than the H.263 baseline coder at the high packet loss rate.