An exploration well is drilled where oil or gas potential is shown by a seismic survey and interpretation. With the advance of drilling technology, most of the easily accessible oil had been developed by the end of the 20th century. To satisfy the ever increasing demand for oil, and bolstered by high oil prices, the major oil companies started to drill in deep water, which requires a deep offshore drilling unit. Offshore drilling units are generally classified by their maximum operating water depth. Many semi-submersible rigs have been purpose-designed for the drilling industry as the allowable drilling water depth has become deeper by the developed technics since the first semi-submersible was launched in 1963. Semi-submersible rigs are commonly used for shallow to deep water up to 3,000 m. Drilling equipment such as a top drive, blowout preventer, drawworks and power system, mud circulation system, and subsea wellhead system are explained to help with an understanding of offshore drilling procedures in the oil and gas fields. The objective of this paper is to introduce the main components of a semi-submersible rig and, by doing so, to raise the awareness of offshore drilling, which accounts for over 30% of the total oil production and will continue to increase.
Special Issue of the Society of Naval Architects of Korea
/
2015.09a
/
pp.69-73
/
2015
An evaluation of the accidental limit state (ALS) for design of a semi-submersible drilling rig is one of the essential design requirements as well as ultimate limit state (ULS) and fatigue limit state (FLS). This paper describes the ALS evaluation on the explosion accident at shale shaker room of semi-submersible drilling rig. There are three steps for the ALS evaluation such as structural analysis at concept design, risk based safety design and structural analysis at detailed design. For the ALS evaluation at concept design, conceptual explosion overpressure from the Rule guided by the classification society was used in the structural analysis that was carried out using LS-DYNA. To set up the design accidental load (DAL), explosion analysis was carried out using FLACS taking safety barriers into consideration. Then, the structural analysis was carried out applying DAL for the ALS evaluation at detailed design. Through the ALS evaluation on the explosion at shale shaker room, the importance of the risk based safety design was described.
Journal of the Society of Naval Architects of Korea
/
v.50
no.3
/
pp.129-137
/
2013
Each owner or operator of offshore products uses a maintenance management system like CMMS(Computerized Maintenance Management System) in order to manage their assets effectively and efficiently for a long time. But most of maintenance management systems have been focused on machinery items, not on 'Hull' until now. On the other hand, classifications like ABS, DNV, GL are having a sale on hull inspection and maintenance system for ships and an interest in hull maintenance system is increasing because of the application of EDD(Extended Dry Docking). This paper discusses the concept, inspection process and the practical application of Hull maintenance for Semi-submersible drilling rig to extend the service life and run a stable operation.
Seo, Dong-jae;Park, Sang-un;Noh, Joung-hwan;Shim, Hak-mu
Special Issue of the Society of Naval Architects of Korea
/
2017.10a
/
pp.105-108
/
2017
Condensation is one of the common issues which we can easily see in everyday life. For example, the surface of glasses with cold water is easily moisturized. This wet surface gives us uncomfortable feeling and is sometimes dangerous because it is slippery. As the safety on working space is one of the most important issue on offshore project, condensation is also important matter to take care of with precaution. Since the bottom of vessel or offshore facility is submersed in the water, the risk of having condensate on the steel surface is getting higher because sea water temperature is normally lower than ambient temperature. And if there is any electric equipment or person working in that space, condensation is normally not allowed. The pontoon of semi-submersible drilling rig is such a space which is submersed, with electric and mechanical equipments and person working periodically. To prevent condensation in pontoon, study was conducted by checking several cases.
A semi-submersible drilling rig is regarded as one of the typical offshore structures operated in the field with moderate environments such as the Gulf of Mexico, Brazil, and West Africa. Its typical roll and pitch natural periods are around 30 seconds, which avoids prevailing regions of the wave energy spectrum, and their responses in waves are quite acceptable for common operation conditions. But large roll and pitch motions can be induced by wave difference frequency energy spectrum if the metacentric heights of a semi-submersible decrease to small values in some loading conditions, and it is because the roll and pitch natural periods increase and approach to the region where the spectral density of the low frequency wave drift moment has significant value. This paper describes the low frequency roll motion of a semi-submersible that are excited by the wave 2nd order difference frequency energy by a series of model experiments. From the model tests with several different initial metacentric heights (GM), it was observed that a semi-submersible can experience large roll motion due to the wave group spectrum.
Proceedings of the Computational Structural Engineering Institute Conference
/
1994.10a
/
pp.103-112
/
1994
Various kinds of fatigue failures of ocean structures were reported and the importance of fatigue life estimation at the design state is significantly recognized and various kinds of analysis approaches have been discussed. In this paper characteristics of the simplified method proposed here and the spectral method are studied and the elements of the approach are discussed. The merits and demerits of the forementioned analysis schemes are studied and the relating parameters such as SCF and S-N curves are also investigated. The simplified fatigue analysis approach and tile spectral fatigue analysis technique is applied for the analysis of bracing members of typical semi-submersible drilling rig structure for the verification of the usage of two methods and the sensitivity study has been performed using the simplified method. The result from the spectral analysis give a more realistic picture of the fatigue life of the offshore structure considered here.
Journal of the Korean Society of Fisheries and Ocean Technology
/
v.53
no.4
/
pp.413-422
/
2017
The objective of this study was to prove possible effects of a habitable place for fish around semi-submersible drilling rig which measured underwater radiated noise, irradiance distribution of rig's light and conducted experimental fishing in Malaysia territory and observed for distribution of fishes around the rig by ROV during drilling operation in the East Sea of Korea. As a result underwater radiated noise was $130dB/{\mu}Pa$ from 156.25 to 187.50 Hz, irradiance distribution of light was between 21.5 and 43.1 lx. Despite this result, underwater radiated noise was not a threat to fish around rig and low irradiance distribution of light also played a role in the luring influence of the fishes at night. Fish showed up in the beginning of drilling operation and at the end of drilling operation. However, there are few fish in the midst of drilling operation. The main reason for this result was the destruction of the habitable place due to blow out mud and broken pieces of ground formation in drilling hole. The results are expected to contribute to reasonable fishery management around rig.
For the purposes of drilling oil field and extracting oil deep water in more rough weather, the size of drilling rigs must be estimated. In this paper, the three dimensional source distribution method is used and we assume 10 deg. heeling and trimming condition of the drilling rig(SR-192). Also, the effects of the hydrodynamic forces which include the drift forces for field method, and the motion responses are studied with changing the incident wave direction in the assumed inclining condition. The theory and numerical codes used in this thesis appeared to be very useful for the preliminary design of drilling rigs.
Journal of the Computational Structural Engineering Institute of Korea
/
v.26
no.4
/
pp.247-254
/
2013
In this paper, dynamic response analysis of a heave compensation system is performed for offshore drilling operations based on multibody dynamics. With this simulation, the efficiency of the heave compensation system can be virtually confirmed before it is applied to drilling operations. The heave compensation system installed on a semi-submersible platform consists of a passive and an active heave compensator. The passive and active heave compensator are composed of several bodies that are connected to each other with various types of joints. Therefore, to carry out the dynamic response analysis, the dynamics kernel was developed based on mutibody dynamics. To construct the equations of motion of the multibody system and to determine the unknown accelerations and constraint forces, the recursive Newton-Euler formulation was adapted. Functions of the developed dynamics kernel were verified by comparing them with other commercial dynamics kernels. The hydrostatic force with nonlinear effects, the linearized hydrodynamic force, and the pneumatic and hydraulic control forces were considered as the external forces that act on the platform of the semi-submersible rig and the heave compensation system. The dynamic simulation of the heave compensation system of the semi-submersible rig, which is available for drilling operations with a 3,600m water depth, was carried out. From the results of the simulation, the efficiency of the heave compensation system were evaluated before they were applied to the offshore drilling operations. Moreover, the calculated constraint forces could serve as reference data for the design of the mechanical system.
Kim, Chul-Ho;Kim, Yoon-Sik;Jung, Hyun-Woo;Ryu, Seung-Nam;Yoon, Kyoung-Kuk
Journal of Advanced Marine Engineering and Technology
/
v.36
no.7
/
pp.942-947
/
2012
As electricity has been used in ship's propulsion, it is necessary to increase the system voltage and current for the electrical distribution system. So it is required to improve the system safety and efficiency, the power stability, the efficiency of the generation through various analysis of ship's electric power system. In this paper, the electrical service reliability of the power distribution system of semi submersible drilling rigs has been analysed and discussed using ETAP.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.