• Title/Summary/Keyword: Selecting Construction Methods

Search Result 125, Processing Time 0.029 seconds

Exact solutions for free vibration of multi-step orthotropic shear plates

  • Li, Q.S.
    • Structural Engineering and Mechanics
    • /
    • v.9 no.3
    • /
    • pp.269-288
    • /
    • 2000
  • The governing differential equations for free vibration of multi-step orthotropic shear plates with variably distributed mass, stiffness and viscous damping are established. It is shown that a shear plate can be divided into two independent shear bars to determine the natural frequencies and mode shapes of the plate. The jk-th natural frequency of a shear plate is equal to the square root of the square sum of the j-th natural frequency of a shear bar and the k-th natural frequency of another shear bar. The jk-th mode shape of the shear plate is the product of the j-th mode shape of a shear bar and the k-th mode shape of another shear bar. The general solutions of the governing equations of the orthotropic shear plates with various boundary conditions are derived by selecting suitable expressions, such as power functions and exponential functions, for the distributions of stiffness and mass along the height of the plates. A numerical example demonstrates that the present methods are easy to implement and efficient. It is also shown through the numerical example that the selected expressions are suitable for describing the distributions of stiffness and mass of typical multi-storey buildings.

Feasibility of Forest Land Conversion to Other Use by Considering Forest Fragmentation (산지전용타당성조사제도에서 산림파편화지수의 고려방안 연구)

  • Kim, Mina;Choi, Jaeyong;Lee, Sanghyuk
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.16 no.4
    • /
    • pp.53-63
    • /
    • 2013
  • The purpose of this study is to analyze impacts of the forest fragmentation caused by development project. Furthermore, to investigate the applicability of landscape indicator when 'Feasibility of forest land conversion to other use' is conducted. The study site was consisted of golf course development and road construction. It is to compare before and after impacts of areal and linear development. As for the methods, selecting landscape indices, clustered into 3 Categories have been utilized. Category I was concerned with 'size of forest patches', II as 'shape of forest patches', and III as 'Core Area' These were calculated by FRAGSTATS, the program for analyzing fragmentation. The results showed that linear development caused more fragmented than areal development projects. Also, patch size, patch shape and core area are related to impacts of development, while Patch size decreased, patch shape and core area increased after development. Therefore, it is necessary to minimize the impacts of forest by considering fragmentation when development project is planned.

A Study on the Indoor Air Pollutants Emission Characteristics by Composed Building Materials (건축자재 마감구성에 따른 실내공기오염물질 방출특성에 관한 연구)

  • Park, Jin-Chul;Rhee, Eon-Ku;Yu, Hyung-Ku
    • Proceedings of the SAREK Conference
    • /
    • 2005.11a
    • /
    • pp.3-8
    • /
    • 2005
  • Building parts of Multi-Family Houses are consisted of several building material assembly. Therefore, after selecting building materials with test result of emission intensity and their feature, composed building materials are made equally with actual construction methods, and experimented emission intensity. 7 days after experiment, formaldehyde emission intensity appeared low in an order of Tile Wall, Wood Flooring, Wallpaper, Reum Flooring, Silk Wallpaper, and 20 days after experiment, TVOC emission intensity appeared low in an order of Tile Wall, Reum Flooring, Silk Wallpaper, Wood Flooring, Wallpaper. There was a clear difference in TVOC emission intensity according to kind of building materials. Composed building materials that weight per unit area is big and omission intensity is high, they effect continuously to indoor air because decrement is small.

  • PDF

Evaluation of vertical dynamic characteristics of cantilevered tall structures

  • Li, Q.S.;Xu, J.Y.;Li, G.Q.
    • Structural Engineering and Mechanics
    • /
    • v.11 no.4
    • /
    • pp.357-372
    • /
    • 2001
  • In this paper, cantilevered tall structures are treated as cantilever bars with varying cross-section for the analysis of their free longitudinal (or axial) vibrations. Using appropriate transformations, exact analytical solutions to determine the longitudinal natural frequencies and mode shapes for a one step non-uniform bar are derived by selecting suitable expressions, such as exponential functions, for the distributions of mass and axial stiffness. The frequency equation of a multi-step bar is established using the approach that combines the transfer matrix procedure or the recurrence formula and the closed-form solutions of one step bars, leading to a single frequency equation for any number of steps. The Ritz method is also applied to determine the natural frequencies and mode shapes in the vertical direction for cantilevered tall structures with variably distributed stiffness and mass. The formulae proposed in this paper are simple and convenient for engineering applications. Numerical example shows that the fundamental longitudinal natural frequency and mode shape of a 27-storey building determined by the proposed methods are in good agreement with the corresponding measured data. It is also shown that the selected expressions are suitable for describing the distributions of axial stiffness and mass of typical tall buildings.

An analysis of rock mass characteristics which influence the choice of support

  • Bednarek, Lukasz;Majcherczyk, Tadeusz
    • Geomechanics and Engineering
    • /
    • v.21 no.4
    • /
    • pp.371-377
    • /
    • 2020
  • There are currently three common methods for selecting excavation supports in Polish hard coal mines. While many factors are considered when choosing appropriate support, these do not include layering or cracking in the excavation ceiling. Although global classifications of rock mass are rarely used in hard coal mines, they are utilised much more frequently during the construction of underground structures such as tunnels. Mining classifications of rock mass have been developed (e.g., in Germany) and they rely on a number of factors but are often related to local mining and geological conditions. This paper discusses the selected findings of a study carried out on seven excavation sites with diverse mining and geological characteristics. Based on the collected data, two indicators were developed to describe rock mass quality. The first indicator is referred to as the roof lithology index WL and describes the quality of the excavation roof in terms of its layering and lithology. The second indicator is the crack intensity factor n and represents the amount of cracks in an excavation's roof. The correctness of the developed indicators was supported by reliable data from the excavation in which the designed support did not fulfill its task but was changed at a later stage, after calculating the proposed indicators.

A Study on 5G Service Methods by using BOCR Model and ANP

  • Song, Inkuk
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.16 no.10
    • /
    • pp.3299-3312
    • /
    • 2022
  • Recently, South Korea preferentially allocated frequencies to build 5G networks as a core competitiveness of the 4th Industrial Revolution. Although the government recognize the importance of 5G construction and preoccupation, network operators have limited to some services, testing the possibility of practical use of 5G. They hesitated to actively build and to carry out the service of a complete 5G network. While 5G is being developed and standardized like this, no one is sure of this step exactly what 5G will be. Thus, following research questions are asked by various stakeholders of 5G market: What is an ideal service providing method for the practical use of 5th generation mobile network? And what are the critical elements to be considered when selecting the service providing method? Therefore, the study aims to investigate 5G service providing issues and elements to be considered and to provide most appropriate service providing method for the practical use of 5G. The results identify that 'Specialized Service' is most appropriate method at the aspects of benefit and opportunity as well as the aspect of risk. In addition, the outcomes imply that the experts replying to the survey not only expect the expansion of emerging market, but also concern the social risk and cost. Since the study dealt with economic, social and business issues in providing 5G service, it might contribute not only to practical research, but also to academic research regarding 5G service method.

A Comparative Analysis of the Pre-Processing in the Kaggle Titanic Competition

  • Tai-Sung, Hur;Suyoung, Bang
    • Journal of the Korea Society of Computer and Information
    • /
    • v.28 no.3
    • /
    • pp.17-24
    • /
    • 2023
  • Based on the problem of 'Tatanic - Machine Learning from Disaster', a representative competition of Kaggle that presents challenges related to data science and solves them, we want to see how data preprocessing and model construction affect prediction accuracy and score. We compare and analyze the features by selecting seven top-ranked solutions with high scores, except when using redundant models or ensemble techniques. It was confirmed that most of the pretreatment has unique and differentiated characteristics, and although the pretreatment process was almost the same, there were differences in scores depending on the type of model. The comparative analysis study in this paper is expected to help participants in the kaggle competition and data science beginners by understanding the characteristics and analysis flow of the preprocessing methods of the top score participants.

Investigating the supporting effect of rock bolts in varying anchoring methods in a tunnel

  • Wang, Hongtao;Li, Shucai;Wang, Qi;Wang, Dechao;Li, Weiteng;Liu, Ping;Li, Xiaojing;Chen, Yunjuan
    • Geomechanics and Engineering
    • /
    • v.19 no.6
    • /
    • pp.485-498
    • /
    • 2019
  • Pre-tensioned rock bolts can be classified into fully anchored, lengthening anchored and point anchored bolts based on the bond length of the resin or cement mortar inside the borehole. Bolts in varying anchoring methods may significantly affect the supporting effect of surrounding rock around a tunnel. However, thus far, the theoretical basis of selecting a proper anchoring method has not been thoroughly investigated. Based on this problem, 16 schemes were designed while incorporating the effects of anchoring length, pretension, bolt length, and spacing, and a systematic numerical experiment was performed in this paper. The distribution characteristics of the stress field in the surrounding rock, which corresponded to various anchoring scenarios, were obtained. Furthermore, an analytical approach for computing the active and passive strengthening index of the anchored surrounding rock is presented. A new fully anchoring method with pretension and matching technology are also provided. Then, an isolated loading model of the anchored surrounding rock was constructed. The physical simulation test for the bearing capacity of the model was performed with three schemes. Finally, the strengthening mechanism of varying anchoring methods was validated. The research findings in this paper may provide theoretical guidelines for the design and construction of bolting support in tunnels.

Selection of concrete lining corrosion protection method for large sewer tunnels (하수터널의 콘크리트 라이닝 부식 방지공법 선정방법에 관한 고찰)

  • Moon, Joon-Shik;Lee, Sungjune
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.16 no.4
    • /
    • pp.347-360
    • /
    • 2014
  • Recently construction of large sewer tunnels used also as underground sluiceways/storages is increasing in order to prevent urban inundation, untreated sewage flow into rivers from combined sewer overflows and consequential river pollution due to climate change. Most of these large sewer tunnels are constructed with concrete and the concrete lining should be protected from corrosion caused by hydrogen sulfide($H_2S$). This paper introduced popular concrete corrosion protection methods for large sewer tunnels with 100-plus years of life cycle, and pros and cons of each corrosion protection methods were described by giving specific examples. However, it is difficult to objectively assess corrosion protection alternatives because of insufficient track record of corrosion protection methods applied to large sewer tunnels. In this paper, the evaluation process for selecting a corrosion protection alternative was introduced for large sewer tunnels using a case study.

Simulation-Based Stochastic Markup Estimation System $(S^2ME)$ (시뮬레이션을 기반(基盤)으로 하는 영업이윤율(營業利潤率) 추정(推定) 시스템)

  • Yi, Chang-Yong;Kim, Ryul-Hee;Lim, Tae-Kyung;Kim, Wha-Jung;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.11a
    • /
    • pp.109-113
    • /
    • 2007
  • This paper introduces a system, Simulation based Stochastic Markup Estimation System (S2ME), for estimating optimum markup for a project. The system was designed and implemented to better represent the real world system involved in construction bidding. The findings obtained from the analysis of existing assumptions used in the previous quantitative markup estimation methods were incorporated to improve the accuracy and predictability of the S2ME. The existing methods has four categories of assumption as follows; (1) The number of competitors and who is the competitors are known, (2) A typical competitor, who is fictitious, is assumed for easy computation, (3) the ratio of bid price against cost estimate (B/C) is assumed to follow normal distribution, (4) The deterministic output obtained from the probabilistic equation of existing models is assumed to be acceptable. However, these assumptions compromise the accuracy of prediction. In practice, the bidding patterns of the bidders are randomized in competitive bidding. To complement the lack of accuracy contributed by these assumptions, bidding project was randomly selected from the pool of bidding database in the simulation experiment. The probability to win the bid in the competitive bidding was computed using the profile of the competitors appeared in the selected bidding project record. The expected profit and probability to win the bid was calculated by selecting a bidding record randomly in an iteration of the simulation experiment under the assumption that the bidding pattern retained in historical bidding DB manifest revival. The existing computation, which is handled by means of deterministic procedure, were converted into stochastic model using simulation modeling and analysis technique as follows; (1) estimating the probability distribution functions of competitors' B/C which were obtained from historical bidding DB, (2) analyzing the sensitivity against the increment of markup using normal distribution and actual probability distribution estimated by distribution fitting, (3) estimating the maximum expected profit and optimum markup range. In the case study, the best fitted probability distribution function was estimated using the historical bidding DB retaining the competitors' bidding behavior so that the reliability was improved by estimating the output obtained from simulation experiment.

  • PDF