• Title/Summary/Keyword: Seepage of dam

Search Result 88, Processing Time 0.023 seconds

A Study on the Effect of Applying Water Seepage Lowering Method Using Swelling Waterstop for Expansion Joint in the Concrete Dam (콘크리트 댐에서 수축이음부의 수팽창성 차수재를 이용한 침투저감 공법 적용효과 연구)

  • Han, Kiseung;Lee, Seungho;Kim, Sanghoon;Kim, Sejin;Pai, Sungjin
    • Journal of the Korean GEO-environmental Society
    • /
    • v.22 no.10
    • /
    • pp.21-29
    • /
    • 2021
  • Most concrete gravity-type dams in and out of the country were constructed by column method to control cracks caused by concrete hydration heat generated during construction, resulting in a certain level of leakage after impoundment through various causes, such as contraction joints and construction joints. However, due to the characteristics of concrete structures that shrink and expand according to temperature, concrete dams have vertical joints and drains to allow penetration. PVC waterproof shows excellent effects in completion of the dam, which however increases the possibility of interfacial failure due to different thermal expansion. Other causes of penetration may include problems with quality control during installation, generation of cracks due to heat of hydration of concrete, waterproofing methods, etc. In the case of Bohyunsan Dam in Yeongcheon, North Gyeongsang Province, the amount of drainage in the gallery was checked and underwater, and it was confirmed that there are many penetrations from drainage holes connected to vertical joints, and that some of the PVC waterproofs are not fully operated. As a new method to prevent penetration through vertical joints, D.S.I.M. (Dam Sealing Innovation Method) developed by World E&C was applied to Bohyunsan Dam and checked the amount of drainage in the gallery. As a result of first testing three most leaking vertical joints, the drain in the gallery was reduced by 87% on the average and then applied to the remaining 13 locations, which showed a 83% reduction effect based on the total drain in the gallery. Summing up these results, it was found that D.S.I.M. preventing water leakage from the upstream face is a valid construction method to reduce the water see-through and penetration quantity seen in downstream faces of concrete dams. If D.S.I.M. is applied to other concrete dams at domestic and abroad, it is expected that it will be very effective to prevent water leakage through vertical joints that are visible from downstream faces.

An Experimental Study on Overflow and Internal Erosion Protection Technology of a Reservoir (저수지 제체월류 및 내부침식 보호기술 모형실험 연구)

  • Jin, Ji-Huan;Lee, Tae-Ho;Yoo, Jeon-Yong;Im, Eun-Sang;Lee, Seung-Joo;Kim, Yong-Seong
    • Journal of the Korean Geosynthetics Society
    • /
    • v.18 no.4
    • /
    • pp.181-191
    • /
    • 2019
  • Most of the reservoirs in South Korea are fill dam, and overflow and piping phenomena have been detected as the main causes of failure of fill dam. In this study, an operating ◯◯ reservoir located in Gongju-si is modeled in centrifuge model test to study the behavior of reservoir during water level rise and overflow conditions. In order to simulate seepage and overflow in the real reservoir, the model was constructed in 1/50 scale, and deteriorated and reinforced conduits were installed. After modeling the reinforced and deteriorated conditions of the conduits, LVDTs, pore pressure gauges were installed and centrifuge model tests were carried out with water level rise and overflow conditions in order to analyze the reservoir behavior according to the reinforcement methods. The results of centrifuge model test in water level rise condition show that deteriorated conduit has adverse effects in the stability of the reservoir body, and the conduit which is reinforced by the inverse lining method has enhanced stability of the reservoir body. Moreover, installation of water spillway is seen to prevent the scour and erosion of the reservoir body. The study provides a basic data required for the reinforcement of conduit and water spillway in the reservoir.

Strength and Permeability Characteristics of Soil-Bentonite Mixture (Soil-Bentonite 혼합토의 강도 및 투수 특성)

  • Jin, Guangri;Im, Eunsang;Kim, Kiyoung;Sin, Donghoon
    • Journal of the Korean GEO-environmental Society
    • /
    • v.11 no.4
    • /
    • pp.5-12
    • /
    • 2010
  • Soil mixture using bentonite as a cutoff material is used a lot for various structures such as landfills, banks and dams as cutoff materials. But seepage water is expected to seep since shear failure of filter layer occurs due to external load, embankment load when constructed. Generally, only coefficient of permeability of Soil Mixture is considered irrespective of the changes of intensity on amount of additives. This research is to study on how the changes of amount of bentonite affects permeability and strength of soil mixture. So successive experiments for measuring permeability and strength were conducted as the amount of bentonite changes from 0 to 4%, mixing with the bed material and then making specimens. Around construction site of B dam. As a result, 2.085E-07 cm/sec was shown when the amount of Soil Mixture was 4%. It is proved that unconfined compressive strength and tensile strength increase as the amount of bentonite increases, but saturation shear strength of bentonite soil mixture from the CD experiment is hardly influenced by the amount of bentonite.

Model experiments for the reinforcement method of agricultural reservoirs by overtopping

  • Lee, Young-Hak;Lee, Dal-Won;Heo, Joon;Ryu, Jung-Hyun
    • Korean Journal of Agricultural Science
    • /
    • v.47 no.1
    • /
    • pp.163-171
    • /
    • 2020
  • In this study, a large laboratory model experiment was conducted with the aim of developing an embankment reinforcement method to prevent overtopping, which is the main cause for the failure of agricultural reservoirs. The model experiment was carried out with concrete and asphalt as a permanent reinforcement method and with geomembrane as the emergency method at a deteriorated homogeneous reservoir. Under the non-reinforced conditions, the pattern of the failure appeared in several scour directions from the downstream slope as the overtopping began, and the width and depth of the erosion were magnified as it gradually moved to the dam crest. Under the conditions reinforced with asphalt and concrete, the overtopping was stabilized. In the case of the concrete reinforcement, it was found that the slope of the riprap boundary exhibited downward erosion by the current; thus, it was necessary to construct an extension up to the riprap joint of the upstream and downstream sides to prevent the expansion of the failure. Under the conditions reinforced with the geomembrane sheet, the overtopping was stabilized, and no seepage was found that required the emergency reinforcement method. Asphalt, concrete, and geomembrane sheet reinforcements have been shown to be capable of delaying failure for about 1 hour and 40 minutes compared to the non-reinforcement conditions. The reinforcement method is considered to be a very effective method to prevent disasters during overtopping. The pore water pressure can be used as useful data to predict the risk of failure at an embankment.

Safety Analysis of Reservoir Dikes in South Korea through the Interpretation of the Electrical Resistivity Data Considering Three-dimensional Structure (3차원 구조를 고려한 전기비저항 탐사자료 해석을 통한 국내 저수지 제체 안전성 분석)

  • Song, Sung-Ho;Yong, Hwan-Ho;Lee, Gyu-Sang;Cho, In-Ky
    • Geophysics and Geophysical Exploration
    • /
    • v.22 no.3
    • /
    • pp.160-167
    • /
    • 2019
  • Resistivity inversion result may be distorted if the seepage line fluctuation within central core with the change of reservoir water level as well as the conductivity of the reservoir water is not taken into consideration because the reservoir dike is composed of three-dimensional (3D) resistivity structure. Consequently, to accurately analyze the resistivity changes inside the reservoir dike according to the change of reservoir water level, 3D electrical resistivity modeling for the 2D survey line considering topography and physical properties of dam components was carried out. In addition, 2D inversion was performed with the simulated 2D resistivity data for a given 3D model in order to compare it with the inversion result of real field data. For 283 reservoirs in Korea, 2D inversion results for the simulated 2D data and field 2D resistivity data were compared. Finally, the reservoirs with an inversion ratio of 50% or less were selected as reservoirs that require further precise investigation.

Effect of Cut-off Wall near the Entrance of Spillway Tunnel (비상여수로 입구부의 차수벽 설치 효과 분석)

  • Kim, Gyoo-Bum;Son, Young-Chul;Seo, Kyung-Soo
    • The Journal of Engineering Geology
    • /
    • v.20 no.2
    • /
    • pp.147-153
    • /
    • 2010
  • Cut-off wall with a low permeability can be constructed to prevent groundwater seepage in spillway tunnel areas. Three spillway tunnels are constructed in Im-ha multipurpose dam region and three types of cut-off walls with a variety of directions and scales are designed. As a result of MODFLOW modeling to assess the effect of cut-off wall for three types, groundwater inflows to the tunnels range from 64.26 $m^3/day$ to 65.49 $m^3/day$ and also they through a cut-off wall section from a reservoir do from 44.08 $m^3/day$ to 45.31 $m^3/day$ and it does not show any significant difference among them. Therefore, a construction process and an environmental conservation rather than the effectiveness of cut-off wall need to be considered to select the best cut-off wall in this region.

Trends in Predicting Groutability Based on Correlation Analysis between Hydrogeological and Rock Engineering Indices: A Review (수리지질 및 암반공학 지수 간 상관분석을 통한 절리암반 내 그라우트 주입성 예측 연구 동향: 리뷰논문)

  • Kwangmin Beck;Seonggan Jang;Seongwoo Jeong;Seungwoo Jason Chang;Minjune Yang
    • The Journal of Engineering Geology
    • /
    • v.33 no.2
    • /
    • pp.307-322
    • /
    • 2023
  • Rock-mass grouting plays a crucial role in the construction of dams and deep caverns, effectively preventing seepage in the foundations, enhancing stability, and mitigating hazards. Most rock grouting is affected by hydrogeological and rock engineering indices such as rock quality designation (RQD), rock mass quality (Q-value), geological strength index (GSI), joint spacing (Js), joint aperture (Ap), lugeon value (Lu), secondary permeability index (SPI), and coefficient of permeability (K). Therefore, accurate geological analysis of basic rock properties and guidelines for grouting construction are essential for ensuring safe and effective grouting design and construction. Such analysis has been applied in dam construction sites, with a particular focus on the geological characteristics of bedrock and the development of prediction methods for grout take. In South Korea, many studies have focused on grout injection materials and construction management techniques. However, there is a notable lack of research on the analysis of hydrogeological and rock engineering information for rock masses, which are essential for the development of appropriate rock grouting plans. This paper reviews the current state of research into the correlation between the grout take with important hydrogeological and rock engineering indices. Based on these findings, future directions for the development of rock grouting research in South Korea are discussed.

The Research of Storage Capacity & Sedimentation of Reservoirs in HONAM Province (호남지방에 저수지의 매몰상황과 저수량에 관한 조사연구(농학계))

  • 이창구
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.13 no.2
    • /
    • pp.2262-2275
    • /
    • 1971
  • Fourteenes rervoirs maintained by the local land improvement associations in the province of Chullabuk-Do and 20 reservoir maintained by thos in the province of Chullanam-Do, were surveyed in connection with a correction between storage capacity and sediment deposit. In addition to this survey, 3,347 of small reservoir, that lie scattered around in the above-mentioned two provinces were investigated by using existing two provinces were investigated by using existing records pertaining to storage capacity in the office of City and country, respectively. According to this investigation the following comclusions are derived. 1. A sediment deposition rate is high, being about $10.63m^3/ha$ of drainage area, and resulting in the average decreasc of storage capaity by 27.5%. This high rate of deposition coule be mainly attributed to the serve denudation of forests due to disorderly cuttings of trees. Easpecially, in small reservoir, an original average design storage depth of 197mm in irrigation water depth is decreased to about 140mm. 2. An average unit storage depth of 325.6mm as the time of initial construction is decreased to 226mm at present. This phenomena causes a greater shortage irrigation water, since it was assumed that original storage quantity was already in short. 3. Generally speaking, seepage rates through dam abutment intakepipe, etc, are high due to insufficient maintenance and management of reservoir. 4. It is recommended that sediment deposit should be dredged when a reservoir is dry in drought. 5. Farmers usually waste excessive irrigation water. 6. Water saving methods should be practiced by applying only necessary water for growing stage of rice. 7. In are as where water defficiency for irrigation is severe, a soil moisture content should be kept at about 70% by applying water once in several days. 8. Tube wells should be provided so as to exploit ground water and subsurface current below stream bed as much as possible. 9. If an intake weir was constructed, a water collection well should be built for the use in drought. 10. Water conservation should be forced by converting devastated forests contained in the drainage area of reservoir to protected forests so as to take priority of yrefor estation, gully control, the prohibition of disorderly cutting of trees, etc. 11. Collective rice nurseries should be adopted, and it should be recommended that irrigation water for rice nurseries is supplied by farmer themselves. 12. Sediment desposit in reservoir should be thoroughly dreged so as to secure a original design storage capacity. 13. The structure of overflow weir should be automatic so as to freely control flood level and not to increase dam height.

  • PDF