• Title/Summary/Keyword: Sea Area Utilization Impact Assessment

Search Result 23, Processing Time 0.028 seconds

Assessment of Documentation Status of the Statement on the Sea Area Utilization according to Artificial Structure Installation in Public Water (공유수면 인공구조물 설치에 따른 해역이용협의서 작성실태 평가)

  • Eom, Ki-Hyuk;Lee, Dae-In;Kim, Gui-Young;Yoon, Sung-Soon
    • Journal of Environmental Impact Assessment
    • /
    • v.22 no.3
    • /
    • pp.265-276
    • /
    • 2013
  • This study assessed documentation status of each environmental assessment items by analyzing the 243 case of marine EIS on the Consultation System of Sea Area Utilization. Observed rate of tidal elevation, current, temperature, salinity in maine environment were below 20%. The EFDC tool is applied substantially in hydrodynamic modeling. The verification process, however, is very insufficient using the recent observed data. Also, in-situ assessment rate of pelagic organism such as phytoplankton was below 50%, and assessment for Chlorophyll a was not accomplished. Ecological index evaluation for zooplankton and benthic ecosystem were not considered in statements. Especially, the rational assessment on the fisheries resources and protected species were very limited. It was necessary that the core assessment items (checklists) were established for environmental scoping. Furthermore, suggestion of information related to development, regional coastal management plan, aquaculture farms, and facilities were enhanced. The redundancy problem of proceedings between Environmental Impact Assessment and Sea Area Utilization Assessment System was improved.

An Effective Environmental Assessment for the Simple Statement of the Sea Area Utilization Consultation System (간이해역이용협의 유형분석 및 효율적 환경평가방안)

  • Lee, Dae-In;Eom, Ki-Hyuk;Kim, Gui-Young
    • Journal of Environmental Impact Assessment
    • /
    • v.22 no.3
    • /
    • pp.255-264
    • /
    • 2013
  • This paper diagnosed the assessment problems and development types of the simple statement of the Sea Area Utilization Consultation System. and suggested the key assessment items for system improvement. The major types of Public Water occupation and use, and distribution characteristic of regional and coastal were analyzed by evaluate 529 review items during 2010-2012. The artificial structure installation including harbor and fishing port facilities in the South and West coast, and seawater supply and drainage for land-based aquaculture and power plant were dominated. The checklists considering each types of occupation and use in Public Water were suggested. In addition, policy proposals for system improvement were suggested.

Improvement of Review System on Sea Area Utilization-Impact by Marine Environmental Management Law (해양환경관리법상 해역이용영향 검토기관의 발전방향)

  • Lee, Dae-In;Eom, Ki-Hyuk;Kim, Gui-Young;Jang, Ju-Hyoung
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.11 no.1
    • /
    • pp.55-62
    • /
    • 2008
  • This study investigated the status and problems of marine-related environmental impact assessment and a utilization-consultation system in Korea and suggested improvement of the review organization. Also, it conducted SWOT analysis based on evaluation of functions, roles and performance of the marine environmental impact assessment center and proposed development strategies of the center through introduction of expert opinions and advanced systems. The performance statement-review by the center in 2007 included 358 cases in total; 165 (46.1%) for consultation on utilization of sea area, 104 for environmental impact assessment (29.0%), and 89 (24.9%) for prior environmental review. The consultation on utilization of sea area can be divided into that for public water surface-use (41%) and reclamation (32%), and sea aggregate extraction process (21%). Although bad impacts on marine environment are reducing under the current system, there are some limits and problems to supplement it in terms of content, system and operation. Review system on sea area utilization-impact(marine environmental impact assessment center) by marine environmental management law needs to obtain expertise, fairness and efficiency and, to do so, have operational supports and institutional improvement to maximize its own functions and roles. At the same time, it is necessary for the center to establish identity and the status as a professional review organization by setting active development strategies inside the center. Finally, it should strengthen an consultation system of marine environmental impact assessment led by the related ministry to achieve effective coastal management.

  • PDF

The Problems and its Improvement of Sea Area Utilization Consultation and Impact Assessment for Projects Related to Marine Environment Restoration (해양환경복원관련 사업에 따른 해역이용협의·영향평가의 문제점 및 개선방안)

  • Yi, Yong Min;Jun, Eun Ju;Lee, Dae In;Kim, Gui Young
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.25 no.1
    • /
    • pp.34-44
    • /
    • 2019
  • Marine activities are becoming more diverse and extensive due to recent social developments, exceeding the environmental capacity of the marine ecosystem. The resilience, resistance, and constancy of marine ecosystems are being damaged or degraded. This prevents the ecosystem from functioning properly, leading to a decline in ecosystem services and value. As a means of returning the damaged ecosystem to health, more and more people are interested in restoration. At a time when restoration projects are gradually expanding, various problems that may arise when implementing the Sea Area Utilization Consultation and Impact Assessment for restoration projects need to be checked, in addition to confirming the direction to be pursued. Therefore, in this study terms related to restoration from research papers and reports were summarized, and the status of the Sea Area Utilization Consultation related to restoration projects and the status of the restoration project were reviewed. In addition, problems with Sea Area Utilization Consultations were considered through a case study to ensure the successful execution of restoration projects. Based on this, we intend to present improvement measures for Sea Area Utilization Consultations and Impact Assessments for restoration projects. This will provide effective information for future policies and plans.

Analysis of Coastal Area Utilization by Consultation of Marine Environmental Impact Assessment Related-Systems (해양환경영향평가 관련 협의에 의한 연안이용분석)

  • Lee, Dae-In;Eom, Ki-Hyuk;Kwon, Kee-Young;Kim, Gui-Young;Yoon, Sung-Soon;Jang, Ju-Hyoung
    • Journal of Environmental Impact Assessment
    • /
    • v.17 no.2
    • /
    • pp.97-103
    • /
    • 2008
  • This study presented politic proposals and diverse utilization-type in coastal areas by analyzing results of reviewed related-statements of marine environment during the one year period of 2007 by Marine Environmental Impact Assessment Center. Total of 358 cases were reviewed, which was a significant increase from 270 in 2006. Consultation on the utilization of sea areas (CUSA) accounted for the largest number of 165 (46.1%) and it was followed by 104 cases of environmental impact assessment (EIA) (29.0%) and 89 cases of prior environmental review (PER) (24.9%). As such, evaluation statements (EIA+PER) related to consultations of the Ministry of Environment accounted for approximately 54% of the entire cases reviewed. To analyze the overall results of reviewing marine-related evaluation statements, utilization and planning were conducted by 47.9%, 38.4% and 13.7% in the South Sea, West Sea and East Sea of Korea, respectively. In evaluation statements (EIA+PER), port construction, industrial complex construction, urban management plan and road construction took up most of the part by 40.9%, 20.2%, 10.4% and 7.3%, respectively. In terms of CUSA-statement, it was evaluated that consultations were mostly carried out on use and reclamation of public water surface in coastal areas and on sea aggregate extraction process in EEZ. The largest number of plans for coastal use were established for Jeollanam-do, followed by Gyeongsangnam-do, Chungcheongnam-do, Gyeongsangbuk-do and Gyeonggi-do. In particular, development plans were concentrated on Jeollanam-do and Gyeongsangnam-do with stable marine environment and outstanding view of the nature. In most cases, these regions are adjacent to the areas designated as a sea area for environmental management and fisheries resources protection zone. Therefore, conflicts exist between development and preservation. Also, rather than random development, more detailed marine environmental impact assessment, gathering of public opinions and politic harmony are essentially required. For efficient coastal management and environmentally sound and sustainable development, fulfilling consistent and transparent coastal policies as well as active and reliable decision making to center on coastal environment by management bodies will be important.

A Study on Connectivity between Maritime Traffic Safety Audit Scheme and Sea Area Utilization Impact Assessment (해상교통안전진단제도와 해역이용협의제도간 연계성에 관한 연구)

  • Lee, Sang-Il;Cho, Ik-Soon
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.20 no.2
    • /
    • pp.165-171
    • /
    • 2014
  • This study aims to examine whether Marine sand mining business is Maritime Traffic Safety Audit and priority between Maritime Traffic Safety Audit and Sea Area Utilization Impact Assessment because development and action to use in the ocean is ambiguous, it is overlapped with system of environmental aspect, and priority is not designated. Therefore, the way to improve to settle the overlapping problem etc. between Maritime traffic Safety Audit and Sea Area Utilization Impact Assessment was suggested and legal ground for sand mining is suggested. Because management department for Maritime Safety Act and Marine Environment Management Act is Ministry of Oceans and Fisheries, the solution for this is both embodying co-experts on each committee for determinant of system with maintaining contact and radical revise of law. If revised, the possibility of accident in ocean is decreased, and it can be a way to protect marine environment.

Diagnosis of Development Projects and Water Quality Changes in the Environmental Management Sea Areas and Improvement of Impact Assessment (환경관리해역의 이용개발현황과 수질변화경향 및 영향평가 개선방안)

  • Jun, Eun Ju;Yi, Yong Min;Lee, Dae In;Kim, Gui Young
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.24 no.6
    • /
    • pp.726-734
    • /
    • 2018
  • The total number of Sea Area Utilization Consultation in the environment management sea areas reviewed from 2015 to 2017 were 60. The number of development projects in the environment conservation sea areas decreased steadily, but special management sea areas increased. Development types in environment management sea areas showed that artificial structure installation was the highest ratio, followed by fishery port development and construction of habor and coastal maintenance and sea water intake and draining. By comparing the trend of water quality changes using marine environment information system (MEIS) data in the environment management areas from 2006 to 2017, COD showed no significant changes but the environment conservation sea areas increased slightly, and the concentration of TN and TP decreased. Gwangyang and Masan bays in the special management sea areas and Gamak bay in the environment conservation sea areas displayed oxygen deficient mass in the summer. As the use of development projects of the environment management sea areas are performed continuously, an analysis of the status of sufficient water quality changes is necessary for environmental impact assessment (Sea Area Utilization Consultation) in the marine environment and should be evaluated mainly for management of contamination by diagnosing thoroughly water quality effects and the pollution of sediment. Especially, the water quality goal for the purpose of designation in each of the environment management sea areas is set clearly, connection with pollution source control and the total pollution load management system (TPLMS) should be proposed and measured to reduce the amount of contaminated water.

An Application Status and Consideration of System Improvement on the Sea Area Utilization Conference and Impact Assessment (해역이용협의제도 운용 현황 분석 및 실효성 제고방안)

  • Lee, Dae-In;Kim, Gui-Young;Jeon, Kyeong-Am;Eom, Ki-Hyuk;Yu, Jun;Kim, Yeong-Tae;Moon, Ju-Hoon;Kam, Min-Jae
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.14 no.4
    • /
    • pp.239-248
    • /
    • 2011
  • This paper evaluated types and characteristics of development projects occurred in coastal area (Public Water) by analyzing an application status of Sea Area Utilization Conference System that effective protect and manage marine environment and ecosystem from various artificial utilization and development enforced in 2008. Also, system improvement for stable settlement and security of efficiency considering exposed problems during system enforcement were diagnosed. The number of Sea Area Utilization Conference (SAUC) performanced during the period of 2009-2010 was 3,705, which consisted of simple SAUC (87.0%), general SAUC (12.8%), and Sea Area Utilization Impact Assessment (SAUIC; 0.2%). The general SAUC was accomplished for Public Water reclamation (43.4%), seawater supply and drainage (17.5%), dredging sediment (5.5%), installation of port facilities (4.6%) and fishing harbor facilities (2.3%), and others (23.4%). Statements of Environmental Impact Assessment (EIA) were reviewed mainly for construction of port facilities (32.9%), followed by construction of industrial complex, development of tourism and leisure complex, road construction, and development of energy facilities. It would be necessary to strengthen effectiveness of the system, advertisement, and capability of conference and review agency, and to enhance confidence of marine EIA continuously, according to the increase of development projects, and diversity and enlargement of development types.

Improvements of Post-Project Environmental Management for the System of the Sea Area Utilization Consultation (해역이용협의제도의 사후환경관리 개선방안)

  • Kim, Gui-Young;Lee, Dae-In;Eom, Ki-Hyuk;Jeon, Kyeong-Am;Kang, Sung-Kyung
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.16 no.2
    • /
    • pp.121-129
    • /
    • 2013
  • This study investigated the status and problems of the post-project environmental management for development projects and suggested improvements of the system to achieve effectiveness for the system of the sea area utilization consultation. The post-project environmental management has had several problems such as the neglect of implementations and checks for the consultation items, the lack of actions and notifications of results, the absence of awareness and expertise of the post-project environmental management. In addition, although it is very important to verify results of actual change and modelling of marine environment before and after the projects, the marine environmental monitoring and assessment have been perfunctorily carried out. Thus, for the improvements of the post-project environmental management to the system of the sea area utilization consultation, it is extremely necessary for related stakeholders to raise awareness of the post management and implement it faithfully, and establish the post management system for conflict resolution and enforce sanctions and accountability against executory items. Furthermore, it should establish systematic monitoring system of marine environmental impact survey.

Improvements in the Environmental Impact Assessment on Seawater and Sediment Qualities for Coastal Dredging Projects (연안준설 사업에 따른 해양 수질 및 퇴적물 영향평가 개선 방안)

  • Kim, Yeong-Tae;Kim, Gui-Young;Jeon, Kyeong-Am;Lee, Dae-In;Yu, Jun;Kim, Hee-Jung;Kim, In-Chul;Eom, Ki-Hyuk
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.19 no.2
    • /
    • pp.119-128
    • /
    • 2013
  • Since the early 2000s, demand for coastal dredging projects have been significantly increased, and the dredged sediments have showed the continuing marked increases through the multiple projects with other coastal development and constructions. As significant or potential degradation of marine environment has been mounting, we checked the current situation of marine environmental impact assessment through marine water and sediment qualities in relation with dredging projects of the sea area utilization consultation statements submitted in 2011. While analysis percentages of the general items were usually higher, harmful components such as metals revealed wide variation of analysis percentages. In the event of analysis of metals, the pre-treatment process (full digestion) and analysis method were not properly implemented in accordance with the guidelines for preparation of consultation statements. Although not specified in the guidelines, verification procedures (tests of recovery efficiency and detection limit) to secure the reliability were almost ignored. As a result, most of developers did conduct poor marine environmental impact assessment on coastal dredging and related projects. We suggested that the responsible government authority should establish new detailed guidelines on the sea area utilization consultation for more strict evaluation and diagnosis of marine environment and distinctly request the developer to obey the guidelines by complementing the system of the sea area utilization consultation.