• 제목/요약/키워드: Scheduling stage

검색결과 167건 처리시간 0.019초

Differential Evolution Algorithm for Job Shop Scheduling Problem

  • Wisittipanich, Warisa;Kachitvichyanukul, Voratas
    • Industrial Engineering and Management Systems
    • /
    • 제10권3호
    • /
    • pp.203-208
    • /
    • 2011
  • Job shop scheduling is well-known as one of the hardest combinatorial optimization problems and has been demonstrated to be NP-hard problem. In the past decades, several researchers have devoted their effort to develop evolutionary algorithms such as Genetic Algorithm (GA) and Particle Swarm Optimization (PSO) for job shop scheduling problem. Differential Evolution (DE) algorithm is a more recent evolutionary algorithm which has been widely applied and shown its strength in many application areas. However, the applications of DE on scheduling problems are still limited. This paper proposes a one-stage differential evolution algorithm (1ST-DE) for job shop scheduling problem. The proposed algorithm employs random key representation and permutation of m-job repetition to generate active schedules. The performance of proposed method is evaluated on a set of benchmark problems and compared with results from an existing PSO algorithm. The numerical results demonstrated that the proposed algorithm is able to provide good solutions especially for the large size problems with relatively fast computing time.

컨벤션시스템의 서비스 품질제고를 위한 최적운영계획 수립 (The Optimal Operating Planning of Convention Systems for Service Quality)

  • 김창대;문재영
    • 품질경영학회지
    • /
    • 제36권1호
    • /
    • pp.40-48
    • /
    • 2008
  • The purpose of this study is to rationally manage service facilities of convention center. This study is to develop the algorithm to consider optimal assignment and optimal operation system planning for convention center. The scheduling algorithm of this study develops through constructing the mathematical model and analyzing the mathematical structure of variables and constraints in model. The scheduling algorithm develops to consist eight stage of optimal operation planning and five stage of optimal assignment planning. Especially, this study indicates that optimum answer through mathematical model and results of algorithm is nondiscrimination.

A Note on the Reversibility of the Two Stage Assembly Scheduling Problem

  • Yoon, Sang-Hum;Lee, Ik-Sun;Sung, Chang-Sup
    • Management Science and Financial Engineering
    • /
    • 제13권1호
    • /
    • pp.25-34
    • /
    • 2007
  • This paper is concerned with proving a conjecture that the two stage assembly system is reversible in deterministic makespan scheduling context. The reversibility means that a job sequence in the assembly system has the same makespan as that of its reverse sequence in the disassembly system which is the reversal of the assembly system. The proposed conjecture shows that the reversibility of serial flowshops can be extended to non-serial and synchronized shops.

2단계 추계학적 야전 포병 사격 순서 결정 모형에 관한 연구 (A Two-Stage Stochastic Approach to the Artillery Fire Sequencing Problem)

  • 조재영
    • 한국국방경영분석학회지
    • /
    • 제31권2호
    • /
    • pp.28-44
    • /
    • 2005
  • The previous studies approach the field artillery fire scheduling problem as deterministic and do not explicitly include information on the potential scenario changes. Unfortunately, the effort used to optimize fire sequences and reduce the total time of engagement is often inefficient as the collected military intelligence changes. Instead of modeling the fire sequencing problem as deterministic model, we consider a stochastic artillery fire scheduling model and devise a solution methodology to integrate possible enemy attack scenarios in the evaluation of artillery fire sequences. The goal is to use that information to find robust solutions that withstand disruptions in a better way, Such an approach is important because we can proactively consider the effects of certain unique scheduling decisions. By identifying more robust schedules, cascading delay effects will be minimized. In this paper we describe our stochastic model for the field artillery fire sequencing problem and offer revised robust stochastic model which considers worst scenario first. The robust stochastic model makes the solution more stable than the general two-stage stochastic model and also reduces the computational cost dramatically. We present computational results demonstrating the effectiveness of our proposed method by EVPI, VSS, and Variances.

변동성을 고려한 탑재프로세스 모델링과 시뮬레이션에 관한 연구 (A Study on the Erection Process Modeling and Simulation considering Variability)

  • 임현규;이용길;김병철;우종훈
    • 대한조선학회논문집
    • /
    • 제53권2호
    • /
    • pp.101-107
    • /
    • 2016
  • Generally, the shipbuilding industry has finite resources and limited workspace. Due to finite resources, limited workspace and state of block preparation, erection process in shipbuilding industry is frequently delayed than erection process scheduling which is planned at long-term plan stage. In this study, considering variability of block reserve ratio, the degree of delay in real erection process is measured and compared to scheduling which is planned at long-term plan stage in shipbuilding industry including finite capacity and variative lead time. Also, the erection process scheduling which has minimum lead time can be checked through simulation. The results of this study could be improved the accuracy of erection process scheduling by checking the main event compliance ratio by block reserve ratio and calculating the optimum erection pitch for the main event compliance.

주문 생산 방식을 따르는 혼합 흐름 공정에서의일정계획에 관한 연구 (Scheduling Methods for a Hybrid Flowshopwith Dynamic Order Arrival)

  • 이근철
    • 대한산업공학회지
    • /
    • 제32권4호
    • /
    • pp.373-381
    • /
    • 2006
  • This paper considers a scheduling problem for a hybrid flowshop with dynamic order arrival. A hybrid flowshop is an extended form of a flowshop, which has serial stages like a flowshop but there can be more than one machine at each stage. In this paper, we propose a new method for the problem of scheduling with the objective of minimizing mean tardiness of orders which arrive at the shop dynamically. The proposed method is based on the list scheduling approach, however we use a more sophisticated method to prioritize lots unlike dispatching rule-based methods. To evaluate the performance of the proposed method, a simulation model of a hybrid flowshop-type production system is constructed. We implement well-known dispatching rules and the proposed methods in the simulation model. From a series of simulation tests, we show that the proposed methods perform better than other methods.

이종병렬기계생산의 일정계획지원 시스템 (A Scheduling Support System for Non-identical Parallel Machine Lines)

  • 정남기;정민영
    • 경영과학
    • /
    • 제17권2호
    • /
    • pp.67-73
    • /
    • 2000
  • This paper describes a scheduling support system for a plant where the machine environment may be modeled as non-identical parallel machine lines (NPML). That is, there are a number of stages in series with various different-capability-machines at each stage. Arriving continuously are jobs with their specific due dates, processing times and candidate processing machines. We’ve developed a real-time scheduling module in conjunction with a supporting production information system which supplies necessary data to the module. This scheduling module is one of the 9 modules in this system, and is composed of both a scheduling interface and a production monitoring interface. This module allows users to generate many candidate schedules by selecting their business policies. The selective arguments which are available consist of allocation costs, batch sizes and machine selection intervals. They are now being implemented at a powder metallurgy plant.

  • PDF

A scheduling problem of manufacturing two types of components at a two-machine pre-assembly stage

  • Sung, Chang-Sup;Yoon, Sang-Hum
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 1996년도 추계학술대회발표논문집; 고려대학교, 서울; 26 Oct. 1996
    • /
    • pp.307-309
    • /
    • 1996
  • This paper analyses a deterministic scheduling problem concerned with manufacturing two types of components at a pre-assembly stage which consists of two independent feeding machines each producing its own type of component. Each type represents a unique component which may have variations in its size or quality. Therefore, the completion time of each component depends on both its type and quality (size) variations. Such manufactured components are subsequently assembled into various component dependent products. The problem has the objective measure of minimizing the total weighted completion time of a finite number of jobs(products) where the completion time of each job is measured by the latest completion time of its two components at the pre-assembly stage. The problem is shown to be NP-complete in the strong sense. A WSPT rule coupled with a machine-aggregation idea is developed for good heuristics which show the error bound of 2.

  • PDF

A modified simulated annealing search algorithm for scheduling of chemical batch processes with CIS policy

  • Kim, Hyung-Joon;Jung, Jae-Hak
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1995년도 Proceedings of the Korea Automation Control Conference, 10th (KACC); Seoul, Korea; 23-25 Oct. 1995
    • /
    • pp.319-322
    • /
    • 1995
  • As a trend toward multi-product batch processes is increasing in Chemical Process Industry (CPI), multi-product batch scheduling has been actively studied. But the optimal production scheduling problems for multi-product batch processes are known as NP-complete. Recently Ku and Karimi [5] have studied Simulated Annealing(SA) and Jung et al.[6] have developed Modified Simulated Annealing (MSA) method which was composed of two stage search algorithms for scheduling of batch processes with UIS and NIS. Jung et al.[9] also have studied the Common Intermediate Storage(CIS) policy which have accepted as a high efficient intermediate storage policy. It can be also applied to pipeless mobile intermediate storage pacilities. In spite of these above researches, there have been no contribution of scheduling of CIS policy for chemical batch processes. In this paper, we have developed another MSA for scheduling chemical batch processes with searching the suitable control parameters for CIS policy and have tested the this algorithm with randomly generated various scheduling problems. From these tests, MSA is outperformed to general SA for CIS batch process system.

  • PDF

유전 알고리즘과 시뮬레이션을 통한 동적 스케줄링 (A Genetic Algorithm and Discrete-Event Simulation Approach to the Dynamic Scheduling)

  • 윤상한;이종환;정관영;이현수;위도영;정지용;서영복
    • 산업경영시스템학회지
    • /
    • 제36권4호
    • /
    • pp.116-122
    • /
    • 2013
  • This study develops a dynamic scheduling model for parallel machine scheduling problem based on genetic algorithm (GA). GA combined with discrete event simulation to minimize the makespan and verifies the effectiveness of the developed model. This research consists of two stages. In the first stage, work sequence will be generated using GA, and the second stage developed work schedule applied to a real work area to verify that it could be executed in real work environment and remove the overlapping work, which causes bottleneck and long lead time. If not, go back to the first stage and develop another schedule until satisfied. Small size problem was experimented and suggested a reasonable schedule within limited resources. As a result of this research, work efficiency is increased, cycle time is decreased, and due date is satisfied within existed resources.