• 제목/요약/키워드: Scheduling stage

검색결과 167건 처리시간 0.022초

발전용 터빈 윤활계통 기계시스템의 상태진단기술 개발연구 (Study on the Development of Condition Monitoring Technology for Turbine Lubricating Systems in Power Plants)

  • 신규식;김재평;남창현;백수곤;권오관;안효석;윤의성;손동구
    • Tribology and Lubricants
    • /
    • 제10권4호
    • /
    • pp.51-58
    • /
    • 1994
  • Condition monitoring technology has recently been received much attention in the light of its significance on the maintenance of complex machineries such as turbines in power plants. Currently, turbines in power plants are maintained by scheduled overhaul based on the manufacturer's recommendations and the utility's experience. Although this preventive maintenance is known to be very effective, operators have less access to identify failure of elements when it happens between overhaul period. Therefore, in this study, a development of a on-line condition monitoring system through wear debris analysis of lubricating oils is aimed with a view to detecting abnormal wear behaviour of bearings and other wet-components at an early stage, allowing better outage scheduling and minimizing forced outages. For field application purposes, the on-line system developed was installed on the turbine of the No.4 unit at Ulsan Power Plant and its performance has been evaluated on site.

직교 다항식의 근사화를 적용한 다중 사용자 간섭 제거 기법 (Multiuser Interference Cancellation Scheme using Orthogonal Polynomial Approximation for Multiuser Signal Detection in CDMA System)

  • 노재호;고균병;최수용;이미숙;고종석;홍대식;강창언
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2001년도 하계종합학술대회 논문집(1)
    • /
    • pp.357-360
    • /
    • 2001
  • In this paper, we propose and evaluate a new interference cancellation method using low pass filtered data estimation method of the instantaneous decision sawnle obtained from each decision stage. With respect to the convergence to the optimal solution the superiority of the proposed method to parallel interference cancellation (PIC) referred as prevailing techniques is proved by its (asymptotic) spectral radius. Through the simulation under the various environment, we show the performance superiority of the IC scheme using proposed method to the PIC scheme. Furthermore, we show transcendence of the proposed method on the possibility of multirate transmission or multiple power scheduling and of performance in the various traffic environments.

  • PDF

터널 버력처리 공정의 시뮬레이션 모델 구축에 관한 연구 (Event Oriented Modeling Approach on Tunnel Muck Hauling Operations)

  • 김경민;서형범;김경주
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.574-578
    • /
    • 2006
  • 시뮬레이션은 건설관리를 위한 도구로써 많은 잠재력을 가지고 있으나, 국내의 경우 대단히 제한된 범위에서 마이크로 프로세스의 공정 평가에 적용을 시도하고 있는 단계에 있다. 시뮬레이션을 건설 공정에 적용하기 위해서는 현장 특성을 반영한 입력 데이터 수집과 모델 구축에 상당한 노력이 필요하며, 건설 주요 공정에 대한 시뮬레이션 모델을 구축하여 적용성을 검증하는 것은 필수적인 프로세스라고 할 수 있다. 본 연구에서는 시뮬레이션 모델 구축 방법론을 소개하고 현장 측정 데이터와의 비교 ${\cdot}$ 분석을 통해 모델을 검증하였다.

  • PDF

벼 휴립건답직파 절수재배에 알맞은 질소 수비량 (Optimum N Fertilization at Panicle Initiation Stage for Efficient Irrigation Scheduling in the Ridge Seeded Rice on Dry Paddies)

  • 최원영;박홍규;최민규;이기상;김상수;이재길;김순철;최선영
    • 한국농림기상학회:학술대회논문집
    • /
    • 한국농림기상학회 2001년도 춘계 학술발표논문집
    • /
    • pp.179-180
    • /
    • 2001
  • 1. 실험목적 : 벼 휴립건답직파재배시 절수재배에 알맞은 질소 수비량을 구명하고자 함. 2. 재료 및 방법 가. 공시품종 : 동진벼 나. 공시토양 : 전북통(미사질양토) 다. 물관리방법 : 3엽기부터 완전낙수기까지 5일 간격 고랑관개 라. 처리내용 -파종량(kg/ha) : 60, 100 -질소 수비량(kg/ha) : 24(50% 감비), 48(표준), 75(50% 증시), 96(100% 증시)(중략)

  • PDF

가중치와 준비시간을 포함한 병렬처리의 일정계획에 관한연구 (Unrelated Parallel Processing Problems with Weighted Jobs and Setup Times in Single Stage)

  • 구제현;정종윤
    • 대한산업공학회지
    • /
    • 제19권4호
    • /
    • pp.125-135
    • /
    • 1993
  • An Unrelated Parallel Processing with Weighted jobs and Setup times scheduling prolem is studied. We consider a parallel processing in which a group of processors(machines) perform a single operation on jobs of a number of different job types. The processing time of each job depends on both the job and the machine, and each job has a weight. In addition each machine requires significant setup time between processing jobs of different job types. The performance measure is to minimize total weighted flow time in order to meet the job importance and to minimize in-process inventory. We present a 0-1 Mixed Integer Programming model as an optimizing algorithm. We also present a simple heuristic algorithm. Computational results for the optimal and the heuristic algorithm are reported and the results show that the simple heuristic is quite effective and efficient.

  • PDF

Foundation Fieldbus에서 긴급데이터의 지연시간 성능해석 및 실험적 검증 (Delay Analysis of Urgent Data in the Foundation Fieldbus and Experimental Verification)

  • 홍승호;손병관
    • 제어로봇시스템학회논문지
    • /
    • 제9권7호
    • /
    • pp.569-576
    • /
    • 2003
  • The data link layer of Foundation Fieldbus provides both token-passing and scheduling services for periodic, time-critical and time-available data. This study developed an analytical model that evaluates the delay performance of urgent data when the data link layer of Foundation Fieldbus provides token-passing service. The validity of analytical model is verified using an experimental model that consists of network interface boards of Foundation Fieldbus. Comparison of analytical and experimental models shows that the analytical model can be utilized in the approximate analysis of the delay characteristics of time-critical data in the Foundation Fieldbus. The analytical model can also be used in the basic design stage of Foundation Fieldbus network system.

효율적인 AGVS의 운용을 위한 다단계 차량 발주 방식에 관한 연구 (A Study on Multi-Stage Dispatching Rule for Efficient AGVS (Automated Guided Vehicle System))

  • 박대희
    • 한국시뮬레이션학회논문지
    • /
    • 제6권1호
    • /
    • pp.41-52
    • /
    • 1997
  • It is essential to construct an efficient material flow system for the successful introduction of automated manufacturing systems. Automated Guided Vehicle System (AGVS) plays a significant role more and more in modern manufacturing environments, because of the flexibility and the precision they offer. However, as the size and the complexity of systems increase, the problems of dispatching, routing and scheduling of AGVs become complicated due to their independent and asynchronous demands. In this paper, we review relevant papers, and provide a new and more efficient method for dispatching AGV, named MEVTT (Minimum Empty Vehicle Travel Time) and demonstrate its performance and efficiency using simulation.

  • PDF

Simulation for Shop Floor Control

  • Cho, Hyunbo
    • 한국시뮬레이션학회:학술대회논문집
    • /
    • 한국시뮬레이션학회 1996년도 춘계학술대회
    • /
    • pp.15-15
    • /
    • 1996
  • A shop floor control system (SFCS) is the central part of a CIM system used to control the activities of several pieces of manufacturing equipment (e.g., NC machines, robots, conveyors, AGVs, AS/RS). The SFCS receives orders and related process plans, and then performs selecting a specific process routing, allocating resources, scheduling the workpieces, downloading the processing instructions (e.g., RS-274 instructions for NC machines, VAL II programs for robot), monitoring the progress of activities, detecting and recovering from errors, and preparing reports on the status of the manufacturing system. Simulation has been utilized in discovering control policies used for resolving shop floor be control problems such as resource contentions, part dispatching, deadlock. The simulation model must be designed to respond to real-time data coming from a shop floor. However, to rapidly build a realtime simulation model of SFCS cannot be easily accomplished. This talk is to address an automatic program generator of discrete event simulation model for shop floor control from process plans and resource models. The program generator is capable of constructing complete discrete simulation models for multi-product and multi-stage flexible manufacturing systems.

  • PDF

작업장 특성을 고려한 가공경로선정 문제의 유전알고리즘 접근 (-Machining Route Selection with the Shop Flow Information Using Genetic Algorithm-)

  • 이규용;문치웅;김재균
    • 산업경영시스템학회지
    • /
    • 제23권54호
    • /
    • pp.13-26
    • /
    • 2000
  • Machining route selection to produce parts should be based on shop flow information because of input data at scheduling tasks and is one of the main problem in process planning. This paper addresses the problem of machining route selection in multi-stage process with machine group included a similar function. The model proposed is formulated as 0-1 integer programing considering the relation of parts and machine table size, avaliable time of each machine for planning period, and delivery date. The objective of the model is to minimize the sum of processing, transportation, and setup time for all parts. Genetic algorithm approach is developed to solve this model. The efficiency of the approach is examined in comparison with the method of branch and bound technique for the same problem. Also, this paper is to solve large problem scale and provide it if the multiple machining routes are existed an optimal solution.

  • PDF

Integration Facility Management: Interface Coordination in Process Management

  • Laksmana, Dimas Indra;Wijayaningtyas, Maranatha;Indriani, Sri;Kiswandono, Kiswandono
    • International Journal of Computer Science & Network Security
    • /
    • 제22권1호
    • /
    • pp.319-323
    • /
    • 2022
  • The information research system continues to be developed and directed at leading research National Institute of Technology (ITN) Malang in accordance with the Research Strategic Plan of ITN Malang. One of them is a computer system in a complete integrated facility management activity, such as this research scheme. The purpose of this research is to combine and integrate people, places, product, processes and technology. All of them are integrate existing organizational factors into a more effective, simplifying of complex processes, identifying and scheduling, notes, decision makers and more. This research was conducted in stages by design with a structured model stage for 3 (three) years (focus on humans, products and processes), research on Integration Facility Management: Interface Coordination in human resources and product management have been completed on 2019 and 2020. While the focus of research this year is to obtain an integrated facility management Interface Coordination in Process Management.