Journal of the Institute of Electronics Engineers of Korea SD
/
v.46
no.4
/
pp.28-36
/
2009
Sequence-Pair(SP) model represents the topological relation between modules. In general, SP model based floorplanners search solutions using Simulated-Annealing(SA) algorithm. Several SA based floorplanning techniques using SP model have been published. To improve the performance of those techniques they tried to improve the speed for evaluation function for SP model, to find better scheduling methods and perturb functions for SA. In this paper we propose a two phase SA based algorithm. In the first phase, white space between modules is reduced by applying compaction technique to the floorplan obtained by an SP. From the compacted floorplan, the corresponding SP is determined. Solution space has been searched by changing the SP in the SA framework. When solutions converge to some threshold value, the first phase of the SA based search stops. Then using the typical SA based algorithm, ie, without using the compaction technique, the second phase of our algorithm continues to find optimal solutions. Experimental results with MCNC benchmark circuits show that how the proposed technique affects to the procedure for SA based floorplainning algorithm and that the results obtained by our technique is better than those obtained by existing SA-based algorithms.
Journal of Korean Society of Industrial and Systems Engineering
/
v.39
no.1
/
pp.130-139
/
2016
The purpose of this paper is to analyze the problems and the sources of defective products and draw improvement plans in a small plastic boat manufacturing process using TOC (Theory Of Constraints) and statistical analysis. TOC is a methodology to present a scheme for optimization of production process by finding the CCR (Capacity Constraints Resource) in the organization or the all production process through the concentration improvement activity. In this paper, we found and reformed constraints and bottlenecks in plastic boat manufacturing process in the target company for less defect ratio and production cost by applying DBR (Drum, Buffer, Rope) scheduling. And we set the threshold values for the critical process variables using statistical analysis. The result can be summarized as follows. First, CCRs in inventory control, material mix, and oven setting were found and solutions were suggested by applying DBR method. Second, the logical thinking process was utilized to find core conflict factors and draw solutions. Third, to specify the solution plan, experiment data were statistically analyzed. Data were collected from the daily journal addressing the details of 96 products such as temperature, humidity, duration and temperature of heating process, rotation speed, duration time of cooling, and the temperature of removal process. Basic statistics and logistic regression analysis were conducted with the defection as the dependent variable. Finally, critical values for major processes were proposed based on the analysis. This paper has a practical importance in contribution to the quality level of the target company through theoretical approach, TOC, and statistical analysis. However, limited number of data might depreciate the significance of the analysis and therefore it will be interesting further research direction to specify the significant manufacturing conditions across different products and processes.
Load distribution is vital to the performance of multipath transport. The task becomes more challenging in real-time multimedia applications (RTMA), which impose stringent delay requirements. Two key issues to be addressed are: 1) How to minimize end-to-end delay and 2) how to alleviate packet reordering that incurs additional recovery time at the receiver. In this paper, we propose sub-packet based multipath load distribution (SPMLD), a new model that splits traffic at the granularity of sub-packet. Our SPMLD model aims to minimize total packet delay by effectively aggregating multiple parallel paths as a single virtual path. First, we formulate the packet splitting over multiple paths as a constrained optimization problem and derive its solution based on progressive approximation method. Second, in the solution, we analyze queuing delay by introducing D/M/1 model and obtain the expression of dynamic packet splitting ratio for each path. Third, in order to describe SPMLD's scheduling policy, we propose two distributed algorithms respectively implemented in the source and destination nodes. We evaluate the performance of SPMLD through extensive simulations in QualNet using real-time H.264 video streaming. Experimental results demonstrate that: SPMLD outperforms previous flow and packet based load distribution models in terms of video peak signal-to-noise ratio, total packet delay, end-to-end delay, and risk of packet reordering. Besides, SPMLD's extra overhead is tiny compared to the input video streaming.
Many embedded real-time systems have adopted processors supported with dynamic voltage scaling(DVS) recently. Power is one of the important metrics for optimization in the design and operation of embedded real-time systems. We can save considerable energy by using slowdown of processor supported with DVS. In this paper, we propose heuristic algorithms to calculate task slowdown factors for an efficient energy consumption in embedded real-time systems with task synchronization. The previous algorithm has a following constraint : given the tasks are ordered in a nondecreasing order of their relative deadline, the task slowdown factors computed are in a nonincreasing order. In this paper, we relax the constraint and propose heuristic algorithms which have the same time complexity that previous algorithm has and can save more energy. Experimental results show that the proposed algorithms are energy efficient.
To reduce switch cost, the optimum numbers of tunable wavelength converters (TWCs) and internal wavelengths required for contention resolution of asynchronous and variable length packets like internet traffics, is presented in the optical packet switch (OPS) with the shared fiber delay line (FDL) buffer. To optimize TWCs and internal wavelength related to on OPS design cost, we proposed a scheduling algorithm for the limited TWCs and internal wavelengths. For three TWC alternatives (not shared, partially shared, and fully shared cases), the optimum numbers of TWCs and internal wavelengths to guarantee minimum pocket loss are evaluated to prevent resource waste. Under o given load, TWCs and internal wavelengths could be significantly reduced, guaranteeing the same pocket loss probability as the performance of on OPS with full TWCs and internal wavelengths.
Plug-in hybrid electric vehicles (PHEVs) will be widely used in future transportation systems to reduce oil fuel consumption. Therefore, the electrical energy demand will be increased due to the charging of a large number of vehicles. Without intelligent control strategies, the charging process can easily overload the electricity grid at peak hours. In this paper, we consider a smart charging and discharging process for multiple PHEVs in a building's garage to optimize the energy consumption profile of the building. We formulate a centralized optimization problem in which the building controller or planner aims to minimize the square Euclidean distance between the instantaneous energy demand and the average demand of the building by controlling the charging and discharging schedules of PHEVs (or 'users'). The PHEVs' batteries will be charged during low-demand periods and discharged during high-demand periods in order to reduce the peak load of the building. In a decentralized system, we design an energy cost-sharing model and apply a non-cooperative approach to formulate an energy charging and discharging scheduling game, in which the players are the users, their strategies are the battery charging and discharging schedules, and the utility function of each user is defined as the negative total energy payment to the building. Based on the game theory setup, we also propose a distributed algorithm in which each PHEV independently selects its best strategy to maximize the utility function. The PHEVs update the building planner with their energy charging and discharging schedules. We also show that the PHEV owners will have an incentive to participate in the energy charging and discharging game. Simulation results verify that the proposed distributed algorithm will minimize the peak load and the total energy cost simultaneously.
The Journal of Korean Institute of Communications and Information Sciences
/
v.42
no.4
/
pp.932-938
/
2017
This paper presents the structure of an energy management system for distributed energy resources of a grid-connected microgrid. The energy management system of a grid-connected microgrid collects information of the microgrid such as the status of distributed energy resources and the time varying pricing plan through various protocols. The energy management system performs forecasting and optimization based on the collected information. It derives the operation schedule of distributed energy resources to reduce the microgrid electricity bill. In order to achieve optimal operation, the energy management system should include an optimal scheduling algorithm and a protocol that transfers the derived schedule to distributed energy resources. The energy management system operates as a rolling horizon controller in order to reduce the effect of a prediction error. Derived control schedules are transmitted to the distributed energy resources in real time through the international standard communication protocol.
In development of network-enabled consumer electronics, much of the time and effort is spent analyzing and solving network performance problems. In this paper, we define an instance of such problems discovered while developing a commercial home network gateway. We then analyze its cause and propose a solution mechanism. Our home network gateway uses art asymmetric link (ADSL) and suffers from an undesirable phenomenon where downlink traffic interferes with upload speed. We call this phenomenon the network performance interference problem. While this problem can easily be confused with receive livelock caused by packet contention at the input queue, we and that this is not the case. By performing extensive experiments and analysis, we reveal that our problem is caused by packet contention at the output queue and certain intrinsic characteristics of TCP. We devise an ACK-separation queuing mechanism for this problem and implement it in the home network gateway Our experiments show that it effectively solves the problem.
Kim, Chang-Seup;Choi, Bum-Gon;Koo, Bon-Tae;Lee, Mi-Young;Chung, Min-Young
Journal of the Korea Society for Simulation
/
v.20
no.1
/
pp.107-116
/
2011
Recently, femtocell has been concerned as one of effective solutions to relieve shadow region and provide high quality services to users in indoor environments. Even though femtocell offers various benefits to cellular operators and users, many technical issues, such as interference coordination, network synchronization, self-configuration, self-optimization, and so on, should be solved to deploy the femtocell in current network. In this paper, we develop a simulator for evaluating performance of long term evolution (LTE) femtocell systems under various interference scenarios. The simulator consists of a main-module and five sub-modules. The main-module connects and manages five sub-modules which have the functionality managing user mobility, packet scheduling, call admission control, traffic generation, and modulation and coding scheme (MCS). To provide user convenience, the simulator adopts graphical user interface (GUI) which can observes simulation results in real time. We expect that this simulator can contribute to developing effective femtocell systems by supporting a tool for analyzing the effect of interference between macrocell and femtocell.
Journal of the Korea Society of Computer and Information
/
v.15
no.6
/
pp.49-56
/
2010
In this paper, a joint PHY-MAC layer optimized resource allocation scheme for OFDMA based micro base stations is investigated. We propose cross-layer optimized two-stage resource allocation scheme including cross-layer functional description and control information flow between PHY-MAC layers. The proposed two-stage resource allocation scheme consists of a user grouping stage and a resource allocation stage. In the user grouping stage, users are divided into a macro base station user group and a micro base station user group based on the PHY-MAC layer characteristics of each user. In the resource allocation stage, a scheduling scheme and an allotment of resources are determined. In the proposed scheme, diversity and adaptive modulation and coding (AMC) schemes are exploited as schedulers. Simulation results demonstrate that the proposed scheme increases the average cell throughput about 40~80 % compared to the conventional system without micro base stations.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.