• Title/Summary/Keyword: Schedule risk

Search Result 222, Processing Time 0.022 seconds

Progressive Design-Build: Its Functions as a Contracting Method and the Four Pillars of Project Success

  • Jeong, Euiseok;Anderson, Connor;Lin, Ken-Yu;Migliaccio, Giovanni C
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.25-32
    • /
    • 2022
  • As a project delivery method, Design-Build (DB) has provided owner, architect, and contractor groups with a process of early design and rapid construction for the past three decades. Although there are many benefits to using standard DB, dissatisfaction has arisen due to limitations to innovate, limited owner involvement during design, and often lengthy procurement. Progressive Design-Build (PDB) has become an appealing alternative providing benefits not seen with standard DB. This paper investigates how PDB impacts a project and how it compares against standard DB; it also presents a proposed framework for evaluating the owner's responsibility and assessment of a project, which we named the "Four Pillars of Project Success". The four pillars are defined with respect to an owner's responsibility and assessment of a project, including project predictability, project risk, project schedule, and project cost. We conducted a literature review, examined several public project case studies, analyzed PDB project information collected by the Design-Build Institute of America (DBIA), and held stakeholder interviews with owners, contractors, and architects who have used both PDB and standard DB. This paper offers insight into PDB's structure and outcomes so an owner group can make an informed decision when considering PDB as their next construction contracting method.

  • PDF

Modular reactors: What can we learn from modular industrial plants and off site construction research

  • Paul Wrigley;Paul Wood;Daniel Robertson;Jason Joannou;Sam O'Neill;Richard Hall
    • Nuclear Engineering and Technology
    • /
    • v.56 no.1
    • /
    • pp.222-232
    • /
    • 2024
  • New modular factory-built methodologies implemented in the construction and industrial plant industries may bring down costs for modular reactors. A factory-built environment brings about benefits such as; improved equipment, tools, quality, shift patterns, training, continuous improvement learning, environmental control, standardisation, parallel working, the use of commercial off shelf equipment and much of the commissioning can be completed before leaving the factory. All these benefits combine to reduce build schedules, increase certainty, reduce risk and make financing easier and cheaper.Currently, the construction and industrial chemical plant industries have implemented successful modular design and construction techniques. Therefore, the objectives of this paper are to understand and analyse the state of the art research in these industries through a systematic literature review. The research can then be assessed and applied to modular reactors.The literature review highlighted analysis methods that may prove to be useful. These include; modularisation decision tools, stakeholder analysis, schedule, supply chain, logistics, module design tools and construction site planning. Applicable research was highlighted for further work exploration for designers to assess, develop and efficiently design their modular reactors.

Safety Techniques-Based Improvement of Task Execution Process Followed by Execution Maturity-Based Risk Management in Precedent Research Stage of Defense R&D Programs (국방 선행연구단계에서 안전분석 기법에 기반한 수행프로세스의 개선 및 수행성숙도 평가를 활용한 위험 관리)

  • Choi, Se Keun;Kim, Young-Min;Lee, Jae-Chon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.10
    • /
    • pp.89-100
    • /
    • 2018
  • The precedent study stage of defense programs is a project stage that is conducted to support the determination of an efficient acquisition method of the weapon system determined by the requirement. In this study, the FTA/FMEA technique was used in the safety analysis process to identify elements to be conducted in the precedent study stage and a methodology for deriving the key review elements through conceptualization and tailoring was suggested. To supplement the key elements derived from the existing research, it is necessary to analyze various events that may arise from key elements. To accomplish this, the HAZOP technique for safety analysis in other industrial fields was used to supplement the results of kdy element derivation. We analyzed and modeled the execution procedure by establishing input/output information and association with the key elements of the precedent study stage derived by linking HAZOP/FTA/FMEA techniques. In addition, performance maturity was evaluated for performance of precedent study, and a risk-based response manual was generated based on inter-working information with key elements with low maturity. Based on the results of this study, it is possible to meet the performance, cost, and schedule of the project implementation through application of the key elements and procedures and the risk management response manual in the precedent study stage of the defense program.

Project Risk Assessment Through Construction Sequence Analyses for Industrial Plant Construction Projects (산업플랜트 건설 프로젝트의 주요 공정 시퀀스 분석을 통한 리스크 평가)

  • Lee, Kyusung;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.140-151
    • /
    • 2013
  • In 2011 and 2012, Korean construction firms awarded around $ 64.5. Billion each year from the overseas market in 2011. This contract value accounted for overwhelming portion of total overseas construction contract values, and this growth is expected to continue for the next decade. However, contract scopes awarded to the Korean construction firms mainly involve detailed design and construction phases due to their competitiveness for the construction techniques. In other words, front-end-engineering-design and construction project management are not considered part of core business due to the lack of project management skills and experience. The researchers focused on development of construction sequence model required to improve construction planning and scheduling skills for the Korean construction firms. The model identifies critical work items and the sequence throughout project execution process. In addition, the researchers developed a risk evaluation method by applying fuzzy theory to the critical construction activities for the industrial plant construction projects. Developed methodology will help project practitioners to develop project schedule in a timely and effe ctive manner and evaluate project risks associated with scheduling process for the industrial plant construction projects.

STRESS REDUCTION PROTOCOL FOR PROPER EXTRACTION OF ADVANCED INFECTED TEETH IN MEDICALLY COMPROMISED PATIENTS : REVIEW OF LITERATURE & REPORT OF CASES (전신질환자에서 과도한 감염치아 발치시 스트레스 감소법 : 문헌적 고찰 및 증례보고)

  • Yoo, Jae-Ha;Choi, Byung-Ho;Hong, Soon-Jae;Nam, Woong;Kim, Jong-Bae;Yoon, Jung-Hoon
    • Journal of the Korean Association of Oral and Maxillofacial Surgeons
    • /
    • v.26 no.1
    • /
    • pp.85-92
    • /
    • 2000
  • Common dental procedures(dental extraction & minor operation) are potentially stress-inducing in many patients, especially medically compromised patients. The body's response to dental stress involves the cardiovascular system(an increase in cardiovascular workload), the respiratory organ and the endocrine system(change in metabolism). To minimize the stress to the medical risk patient, the stress reduction protocol was established. The obtained contents were as follows: (1) Recognize the patient's degree of medical risk (2) Complete medical consultation before dental therapy (3) Schedule the patient's appointment in the morning (4) Monitor and record preoperative and postoperative vital signs (5) Use psychosedation during therapy (6) Use adequate pain control during therapy (7) Short length of appointment : do not exceed the patient's limits of tolerance (8) Follow up with postoperative pain/anxiety control (9) Telephone the higher medical risk patient later on the same day that treatment was given Though the stress reduction protocol above was applied to the dental extraction in medically compromised patients with the advanced infected teeth, the final responsibility for the complications(syncope, bleeding & infection, etc.) in a patient rests with the dentist who ultimately treats him. For the prevention of postextraction complications & poor prognosis, the authors treated the advanced infected teeth with the pulp extirpation, opening drainage through the canal and complete occlusal reduction. The final extraction and wound closure were then done after $1{\sim}2$ weeks. The final prognosis was comfortable without common complications.

  • PDF

Serological Response of Pups to the Selected Canine Vaccines and Vaccination Schedules against Canine Parvovirus (Canine parvovirus 함유 혼합백신들과 예방접종 스케줄에 따른 강아지의 혈청학적 반응)

  • Kim, Doo;Jeoung, Seok-young;Ahn, So-jeo;Jung, Jong-ho;Park, Son-il
    • Journal of Veterinary Clinics
    • /
    • v.21 no.1
    • /
    • pp.1-6
    • /
    • 2004
  • This study was undertaken to provide the appropriate vaccination protocol of canine parvovirus (CPV) vaccine for the companion dogs in Korea. A total of 120 healthy pups (20 pups per group) at 6 weeks of age were randomly assigned to one of four commercially available vaccines [C, G, K, and V groups] and one of vaccination schedules [V2 and V4 groups]. The serological responses to the CPV component of the vaccines were determined by measuring HI titers. The maternal antibodies was declined to under the protective level at 6 weeks of age. Therefore, it was considered that vaccination of pups for CPV should be started at 6 weeks of age. And when the combination vaccine was used, the immunogenicity of V vaccine was superior to the other vaccines and optimum vaccination schedule was 3 times vaccination with 3 weeks-interval starting vaccination at 6 weeks of age. Although pups were vaccinated at 6 weeks of age, the geometric mean CDV titers of pups in all groups by 9 weeks of age were under the protective level. So, hygienic measures including avoiding to exposure to the high risk areas were needed to prevent CPV infection in this period.

A Probabilistic Prediction of Weapon Systems Evaluation Test Execution Ratio and Management Scheme (무기체계 평가시험 수행율의 확률적 예측 및 관리기법)

  • Jang, Young-sik;Han, Sung-hee;Han, Hyun-goo;Mun, Chang-min
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.21 no.2
    • /
    • pp.468-474
    • /
    • 2017
  • A test service for the weapon systems evaluation is one of the most important processes during the weapon systems acquisition or development life cycle. Before completion of weapon systems development, the appropriate evaluation test can reduce risk and expense which might be expected during weapon systems development procedure. In this paper, it is suggested that a probabilistic prediction method based on Monte Carlo simulation for how much the annual weapon systems evaluation test excution ratio can be reached compared to the yearly initial planned test quantity. And then a weapon systems evaluation test quantitative management scheme is suggested to assist decision making for the test schedule manager who can arrange monthly test schedule based on the prediction result of annual test excution ratio. And the proposed method is applied for the weapon systems evaluation firing test data of the 8th directorate, Agency for Defense Development(ADD). And also the application result is examined.

Rotating Shift and Daytime Fixed Work Schedules as a Risk Factor for Depression in Korean Police Officers (순환교대근무와 주간고정근무 경찰공무원의 우울감에 미치는 요인에 대한 연구)

  • Bae, Seung-Min;Lee, Yu-Jin;Kim, Seog-Ju;Cho, In-Hee;Kim, Jong-Hoon;Koh, Seung-Hee;Cho, Seong-Jin
    • Sleep Medicine and Psychophysiology
    • /
    • v.17 no.1
    • /
    • pp.28-33
    • /
    • 2010
  • Objectives: Working at other times than the regular day shift has been reported to be a stressor associated with health consequences and mental disorders as well as disturbance of sleep. In current study, we aimed at investigating the relationship between work schedule, sleep quality and depression among police officers. Methods: Eleven hundreds and forty five police officers (male: 1040, female: 105) completed questionnaires of basic socio-demographic data, Pittsburgh Sleep Quality Index (PSQI), Korean Scale of Occupational Stress (KOSS), Impact of Event Scale - Revised (IES-R) and Center for Epidemiologic Study-Depression (CES-D). Results: After controlling for age, sex and educational level, score of CES-D was correlated positively with the score of KOSS, PSQI and IES-R on partial correlation analysis (r=-0.077; p=0.009, r=0.262; p<0.000 and r=0.421, p<0.000, respectively). Logistic regression analysis revealed that female sex, age, the score of KOSS and IES-R and schedule of rotating shift work predicted higher score than 16 score of CES-D significantly in total subjects (p=0.023, p=0.015, p=0.000, p=0.000 and p=0.022, respectively). Conclusion: Current result suggested that not only female sex, age, higher occupational stress and impact of event scale but also rotating shift work schedule might be related to depression among police officers.

  • PDF

Guidelines for Dental clinicians in case of medically compromised Patients: Case reports of medically compromised patients taking oral Bisphosphonate (전신질환자 구강외과 소수술시의 주의사항 -골다공증약 복용환자 수술 포함-)

  • Kim, Sun-Jong;Kim, Myung-Rae
    • The Journal of the Korean dental association
    • /
    • v.48 no.7
    • /
    • pp.538-546
    • /
    • 2010
  • Dental surgical procedures are potentially stress-inducing to not only patients but clinicians especially in case of medically compromised patients. The body response to dental stress involves the cardiovascular, respiratory and the endocrine system. To minimize the stress to the medically compromised patients, the stress reduction protocols should be established. The protocols include (1) Recognize the patient's degree of medical risk (2) Medical consultation before dental therapy (3) Schedule the patient's appointment in the morning (4) Monitor and record preoperative, perioperative and postoperative vital signs (5) Intra-venous sedation during surgical procedures (6) Adequate pain control during therapy (7) Short length of appointment time (8) Contact the patients on the same day. Two cases of Bisphosphonate-related osteonecrosis of the jaws were analyzed. There were 2 women, and the mean age was 70 years (range, 64~74 years). both are medically compromised, with steroids. Both patients were taking an oral bisphosphonate for several years. BRONJ is defined as an area of exposed bone of more than 8 weeks - duration in a patient taking a bisphosphonate for bone disease. Bisphosphonates have been widely prescribed over the last decade for a range of bone diseases, mainly intravenously for bone cancers and orally for osteoporosis. Although it is still controversial as to precisely how the bisphosphonates work, generally it is accepted that they prevent osteoclast action, with consequent cessation of osteoblast activity, so that the bone turnover is markedly reduced or ceased. The aim of this study is to informed the clinicians how to prepare and recognize in case of the BRONJ with medically compromised patients.

Fatigue life prediction based on Bayesian approach to incorporate field data into probability model

  • An, Dawn;Choi, Joo-Ho;Kim, Nam H.;Pattabhiraman, Sriram
    • Structural Engineering and Mechanics
    • /
    • v.37 no.4
    • /
    • pp.427-442
    • /
    • 2011
  • In fatigue life design of mechanical components, uncertainties arising from materials and manufacturing processes should be taken into account for ensuring reliability. A common practice is to apply a safety factor in conjunction with a physics model for evaluating the lifecycle, which most likely relies on the designer's experience. Due to conservative design, predictions are often in disagreement with field observations, which makes it difficult to schedule maintenance. In this paper, the Bayesian technique, which incorporates the field failure data into prior knowledge, is used to obtain a more dependable prediction of fatigue life. The effects of prior knowledge, noise in data, and bias in measurements on the distribution of fatigue life are discussed in detail. By assuming a distribution type of fatigue life, its parameters are identified first, followed by estimating the distribution of fatigue life, which represents the degree of belief of the fatigue life conditional to the observed data. As more data are provided, the values will be updated to reduce the credible interval. The results can be used in various needs such as a risk analysis, reliability based design optimization, maintenance scheduling, or validation of reliability analysis codes. In order to obtain the posterior distribution, the Markov Chain Monte Carlo technique is employed, which is a modern statistical computational method which effectively draws the samples of the given distribution. Field data of turbine components are exploited to illustrate our approach, which counts as a regular inspection of the number of failed blades in a turbine disk.