• Title/Summary/Keyword: Schedule network

Search Result 275, Processing Time 0.024 seconds

Prediction method of node movement using Markov Chain in DTN (DTN에서 Markov Chain을 이용한 노드의 이동 예측 기법)

  • Jeon, Il-kyu;Lee, Kang-whan
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.20 no.5
    • /
    • pp.1013-1019
    • /
    • 2016
  • This paper describes a novel Context-awareness Markov Chain Prediction (CMCP) algorithm based on movement prediction using Markov chain in Delay Tolerant Network (DTN). The existing prediction models require additional information such as a node's schedule and delivery predictability. However, network reliability is lowered when additional information is unknown. To solve this problem, we propose a CMCP model based on node behaviour movement that can predict the mobility without requiring additional information such as a node's schedule or connectivity between nodes in periodic interval node behavior. The main contribution of this paper is the definition of approximate speed and direction for prediction scheme. The prediction of node movement forwarding path is made by manipulating the transition probability matrix based on Markov chain models including buffer availability and given interval time. We present simulation results indicating that such a scheme can be beneficial effects that increased the delivery ratio and decreased the transmission delay time of predicting movement path of the node in DTN.

New Database Table Design Program of Real Time Network for High Speed Train

  • Cho, Chang-Hee;Park, Min-Kook;Kwon, Soon-Man;Kim, Yong-Ju;Kim, Sung-Shin
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2003.10a
    • /
    • pp.2164-2168
    • /
    • 2003
  • Real time control system such as in factory automation fields, defense field, aerospace, railway industries, financial trading and so forth, includes multiple computers on multiple nodes, and share data to process various actions and functions. This is similar to multitasking in a multiprocessor computer system. The task processing efficiency of such system is proportionally increased by process speed of each process computer. And also it is greatly influenced by communication latencies of each node. To provide proper operation of such real time system, a network that can guarantee deterministic exchange of certain amount of data within a limited time is required. Such network is called as a real time network. As for modern distributed control system, the timeliness of data exchange gives important factor for the dynamics of entire control system. In a real time network system, exchanged data are determined by off-line design process to provide the timeliness of data. In other word, designer of network makes up a network data table that describes the specification of data exchanged between control equipments. And by this off-line design result, the network data are exchanged by predetermined schedule. First, this paper explains international standard real time network TCN (Train Communication Network) applied to the KHST (Korean High Speed Train) project. And then it explains the computer program developed for design tool of network data table of TCN.

  • PDF

The study on Multicast Cell Scheduling for Parallel Multicast packet switch with Ring Network (링망을 이용한 병렬 멀티캐스트 패킷스위치에서의 멀티캐스트 셀 스케줄링에 관한 연구)

  • 김진천
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.4 no.5
    • /
    • pp.1037-1050
    • /
    • 2000
  • A goal of a BISDN network is to provided integrated transport for a wide range of applications such as teleconferencing, Video On Demand etc. There require multipoint communications in addition to conventional point-to-point connections. Therefore multicast capabilities are very essential in multimedia communications. In this paper, we propose a new multicast cell scheduling method on the Parallel Multicast Packet Switch with Ring network: PMRN which are based on separated HOL. In this method, we place two different HOLs, one for unicast cells and the other for multicast cells. Then using non-FIFO scheduling, we can schedule both unicast cells and multicast cells which are available at the time in the input buffer. The simulation result shows that this method reduces the delay in the input buffer and increases the efficiency of both point-to-point network and ring network and finally enhances the bandwidth of the overall packet switch. A goal of a BISDN network is to provided integrated transport for a wide range of applications such as teleconferencing, Video On Demand etc. There require multipoint communications in addition to conventional point-to-point connections. Therefore multicast capabilities are very essential in multimedia communications. In this paper, we propose a new multicast cell scheduling method on the Parallel Multicast Packet Switch with Ring network: PMRN which are based on separated HOL. In this method, we place two different HOLs, one for unicast cells and the other for multicast cells. Then using non-FIFO scheduling, we can schedule both unicast cells and multicast cells which are available at the time in the input buffer. The simulation result shows that this method reduces the delay in the input buffer and increases the efficiency of both point-to-point network and ring network and finally enhances the bandwidth of the overall packet switch.

  • PDF

EBKCCA: A Novel Energy Balanced k-Coverage Control Algorithm Based on Probability Model in Wireless Sensor Networks

  • Sun, Zeyu;Zhang, Yongsheng;Xing, Xiaofei;Song, Houbing;Wang, Huihui;Cao, Yangjie
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.10 no.8
    • /
    • pp.3621-3640
    • /
    • 2016
  • In the process of k-coverage of the target node, there will be a lot of data redundancy forcing the phenomenon of congestion which reduces network communication capability and coverage, and accelerates network energy consumption. Therefore, this paper proposes a novel energy balanced k-coverage control algorithm based on probability model (EBKCCA). The algorithm constructs the coverage network model by using the positional relationship between the nodes. By analyzing the network model, the coverage expected value of nodes and the minimum number of nodes in the monitoring area are given. In terms of energy consumption, this paper gives the proportion of energy conversion functions between working nodes and neighboring nodes. By using the function proportional to schedule low energy nodes, we achieve the energy balance of the whole network and optimizing network resources. The last simulation experiments indicate that this algorithm can not only improve the quality of network coverage, but also completely inhibit the rapid energy consumption of node, and extend the network lifetime.

A Risk Analysis Model Using VERT for R & D Project Management (R & D 프로젝트의 위험분석모형의 연구)

  • 황홍석
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.20 no.1
    • /
    • pp.85-99
    • /
    • 1995
  • Increasingly, risk analysis is becoming important ingredients in achieving the successful implementation and application in the area of the project management. The project management system is designed to manage or control the project resources on a given activity within time, cost and performance so called TPPM (Total Productive Project Management). In this research, a risk analysis model misproposed to identify potential problem areas, quantify the risks, and generated the chice of the action that can be taken to reduce the risk. In addition two analysis models are proposed : 1) risk factor model and 2) network simulation model using VERT (Venture Evaluation and Review Technique ). The objective of the remodels is to estimate the schedule, cost performance risks. These proposed quantitative models for project risk analysis are proving its value for the project managers who need to assess the risk of changes in cost, schedule, or performance. The proposed models will be used in the area of project selection, evaluation and the allocation of project resources.

  • PDF

Enhanced resource scheduling in Grid considering overload of different attributes

  • Hao, Yongsheng
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.10 no.3
    • /
    • pp.1071-1090
    • /
    • 2016
  • Most of scheduling methods in the Grid only consider one special attribute of the resource or one aspect of QoS (Quality of Service) of the job. In this paper, we focus on the problem that how to consider two aspects simultaneously. Based on the requirements of the jobs and the attributes of the resources, jobs are categorized into three kinds: CPU-overload, memory-overload, and bandwidth-overload jobs. One job may belong to different kinds according to different attributes. We schedule the jobs in different categories in different orders, and then propose a scheduling method-MTS (multiple attributes scheduling method) to schedule Grid resources. Based on the comparisons between our method, Min-min, ASJS (Adaptive Scoring Job Scheduling), and MRS (Multi-dimensional Scheduling) show: (1) MTS reduces the execution time more than 15% to other methods, (2) MTS improves the number of the finished jobs before the deadlines of the jobs, and (3) MTS enhances the file size of transmitted files (input files and output files) and improves the number of the instructions of the finished jobs.

A Distributed Sequential Link Schedule Combined with Routing in Wireless Mesh Networks

  • Cha, Jae-Ryong;Kim, Jae-Hyun
    • ETRI Journal
    • /
    • v.34 no.3
    • /
    • pp.462-465
    • /
    • 2012
  • This letter proposes a new distributed scheduling scheme combined with routing to support the quality of service of real-time applications in wireless mesh networks. Next, this letter drives average end-to-end delay of the proposed scheduling scheme that sequentially schedules the slots on a path. Finally, this letter simulates the time division multiple access network for performance comparison. From the simulation results, when the average number of hops is 2.02, 2.66, 4.1, 4.75, and 6.3, the proposed sequential scheduling scheme reduces the average end-to-end delay by about 28%, 10%, 17%, 27%, and 30%, respectively, compared to the conventional random scheduling scheme.

OVERALL BENEFIT-DURATION OPTIMIZATION (OBDO) FOR OWNERS IN LARGE-SCALE CONSTRUCTION PROJECTS

  • Seng-Kiong Ting;Heng Pan
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.780-785
    • /
    • 2005
  • This paper aims to consider an overall benefit-duration optimization (OBDO) problem for the sake of maximizing owner's economic benefits, whilst considering influences of schedule compression incurred opportunity income on the profitability of a large-scale construction project. Unlike previous schedule optimization models and techniques that have focused on project duration or cost minimization, with greater weight on contractors' interests, OBDO facilitates owner's economic benefits through overall benefit-duration optimization. In this paper, the objective function of OBDO model is formulated. An example is illustrated to prove the feasibility and practicability of the overall benefit-duration optimization problem. The significance of employing OBDO model and future research work are also described.

  • PDF

STOCHASTIC CASHFLOW MODELING INTEGRATED WITH SIMULATION BASED SCHEDULING

  • Dong-Eun Lee;David Arditi;Chang-Baek Son
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.395-398
    • /
    • 2011
  • This paper introduces stochastic cash-flow modeling integrated with simulation based scheduling. The system makes use of CPM schedule data exported from commercial scheduling software, computes the best fit probability distribution functions (PDFs) of historical activity durations, assigns the PDFs identified to respective activities, simulates the schedule network, computes the deterministic and stochastic project cash-flows, plots the corresponding cash flow diagrams, and estimates the best fit PDFs of overdraft and net profit of a project. It analyzes the effect of different distributions of activity durations on the distribution of overdrafts and net profits, and improves reliability compared to deterministic cash flow analysis.

  • PDF

A Detailed Design for DBR Based APS System (DBR 기반의 APS 시스템 상세 설계)

  • Choi, Jeong-Gil;Kim, Su-Jin;Ju, Jeong-Min;Chung, Sun-Wha;Chung, Nam-Kee
    • IE interfaces
    • /
    • v.14 no.4
    • /
    • pp.348-355
    • /
    • 2001
  • This paper suggests a detailed design of APS(Advanced Planning & Scheduling) system using the DBR (Drum-Buffer-Rope) which is a finite capacity scheduling logic of TOC(Theory of Constraints). Our design is composed of four modules; Network, Buffer, Drum and Subordination. The Network module defines the Product Network which is built from BOM and routings. The Buffer module inserts the Buffers into the Product Network. The Drum module describes detail procedures to create Drum Schedule on the CCR(Capacity Constraint Resource). The Subordination module synchronizes all non-constraints to the constraints by determining the length of Rope. This design documented by ARIS.

  • PDF