• Title/Summary/Keyword: Schedule information

Search Result 1,096, Processing Time 0.029 seconds

Records & archival Management Research of Sagamihara City, Japan (일본 사가미하라시(相模原市)의 기록관리 연구)

  • Yi, Kyoung-yong
    • The Korean Journal of Archival Studies
    • /
    • no.58
    • /
    • pp.65-94
    • /
    • 2018
  • This paper is an example of records & archival management in Sagamihara City, Japan. The purpose of this paper is to examine the process and main contents of the Japanese record community making 'exemplary records management system' in the region. Specifically, the organization of the Records Management Council, which performs the limited function and role of the 'advisory body', actively utilized the organization of 'local government', which is the main governance organization of municipal administration in the process of regulating the ordinances and related regulations. In this process, related record information at each stage of record management is actively provided to the members of the society. This case is significant in that it presents the "practical view" of the recording community in the reality of the records management in Korea where there is no archive, which is the material foundation of the realization of 'systematic record management'.

Scheduling Generation Model on Parallel Machines with Due Date and Setup Cost Based on Deep Learning (납기와 작업준비비용을 고려한 병렬기계에서 딥러닝 기반의 일정계획 생성 모델)

  • Yoo, Woosik;Seo, Juhyeok;Lee, Donghoon;Kim, Dahee;Kim, Kwanho
    • The Journal of Society for e-Business Studies
    • /
    • v.24 no.3
    • /
    • pp.99-110
    • /
    • 2019
  • As the 4th industrial revolution progressing, manufacturers are trying to apply intelligent information technologies such as IoT(internet of things) and machine learning. In the semiconductor/LCD/tire manufacturing process, schedule plan that minimizes setup change and due date violation is very important in order to ensure efficient production. Therefore, in this paper, we suggest the deep learning based scheduling generation model minimizes setup change and due date violation in parallel machines. The proposed model learns patterns of minimizing setup change and due date violation depending on considered order using the amount of historical data. Therefore, the experiment results using three dataset depending on levels of the order list, the proposed model outperforms compared to priority rules.

A Study on Analysis Model for Weapon Acquisition Alternatives (국방 무기체계 획득방안 연구 방법론 제안)

  • Lee, Ji-Young
    • Journal of Convergence for Information Technology
    • /
    • v.9 no.6
    • /
    • pp.91-96
    • /
    • 2019
  • Recently, it is expected for requirement for more scientific research of weapon systems acquisition alternatives with reliability and objectivity. For these needs, study on methodology of weapon systems acquisition alternatives is but on-going, but it is still in its early stages and is unprofessional. We compared general decision making methods, government development program decision making methods, methodologies of weapon systems acquisition alternatives research such as AHP, ANP, KAAM and proposed AHP as weapon acquisition analysis. This study guarantees objectivity and derives scientific research results reliability by analyzing and comparing comprehensive elements such as cost, effectiveness, deployment schedule, program management risk. Further study on AHP weight and other decision making methods is needed considering category of weapon systems and program characteristics.

Study on Methods for Arts Sponsorship Using Smart Contracts and Non-fungible Tokens (스마트 계약과 대체 불가능 토큰을 활용한 예술 후원 방법에 대한 연구)

  • Lee, Eun Mi
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.1
    • /
    • pp.523-529
    • /
    • 2022
  • Art sponsorship contributed to the development of culture and art by supporting art activities to be financially stable. Various problems in the non-fungible tokens (NFTs) market, such as speculative transactions, are also expected to be improved through sound art sponsorship. This study proposes methods of implementing art sponsorship using NFTs and smart contracts. First, we propose a method of posting the acknowledgement of art sponsorship using NFT metadata. Second, we propose a method to remit sponsorship funds according to the project schedule using time-locked wallets. Third, we propose a method to remit sponsorship funds when major events of the project occur or requirements are met using Event-Driven Execution. The proposed methods can be used to share the fact about art sponsorship and safely fund it. However, many decisions about art projects must be made based on information generated outside the blockchain, which can lead to Oracle problems, so further research is needed.

Study of Pressure Safety Valves and an Absorption System for a Repurposed Ammonia Tank (용도 변경된 암모니아 탱크 안전밸브 및 흡수시설에 관한 연구)

  • Bae, Jong Hoon;Lee, Chang Jun
    • Korean Chemical Engineering Research
    • /
    • v.60 no.4
    • /
    • pp.512-518
    • /
    • 2022
  • In this study, safety devices for ammonia tanks of a company in Ulsan petrochemical industrial complex were studied. The type of a tank is cylindrical and this tank was originally designed to store propylene in 1972. Due to the changes of the production schedule according to market environments, the usage of this tank has been changed to store ammonia. Despite of the changes of materials, there is no scientific information or reviews for guaranteeing the safety. Therefore, in this study, the current status of this tank is investigated to confirm that the operational conditions are complying with safety conditions. Moreover, the safety devices such as an ammonia absorbing system and water curtains are analyzed how they mitigate the impact of an accident. In addition, consequence analysis is performed to provide a proper emergency response plan. Throughout these analysis, it is confirmed that installed safety devices effectively mitigate the impact of accidents, and the necessary time for an emergency response plan is suggested when ammonia release.

A Study on the Utilization of BIM Model using Vertex Data-based Division Method (정점데이터기반 분할기법을 활용한 BIM모델의 활용 방안 연구)

  • Jae-Yeong, Hwang;Jae-Hee, Lee;Leen-Seok, Kang
    • Land and Housing Review
    • /
    • v.14 no.1
    • /
    • pp.123-134
    • /
    • 2023
  • The BIM (Building Information Modeling) model created in the design stage can be used for prior review and schedule management for the construction stage. However, in the case of actual BIM application cases, additional work is required, such as creating a new model suitable for the construction stage, rather than using the 3D model in the design stage, due to the difference in the purpose of use between the design stage and the construction stage. Therefore, in this study, a division function of BIM model is proposed as a method of recycling it in the construction stage without a remodeling process. In addition, the application to the actual BIM model and the 4D CAD system linkage of the divided object and the comparison with the existing division method are used to verify the usability.

Home Healthcare Service Awareness Survey for Korean Medicine Doctors: a survey study

  • Hye In Jeong;Taegwang Nam;Minhui Hong;Kyeong Han Kim
    • Journal of Pharmacopuncture
    • /
    • v.26 no.1
    • /
    • pp.60-66
    • /
    • 2023
  • Objectives: Discussions regarding "medical blind spots" in Korea's "aging society" are continuously rising. In addition, the demand for medical attention and care for the elderly and vulnerable populations continues to increase. Given this, the government is promoting the "home healthcare service" project. This study aims to lay the foundation for promoting this project by investigating the perception of clinical Korean Medicine (KM) doctors in the "community health care" project. Methods: With the cooperation of the Association of Korean Medicine, we sent a questionnaire to all KM doctors through e-mail. The survey included personal information, awareness, appropriate disease and intervention, proper visit location, and pros and cons. Results: A total of 602 responses were collected and analyzed. Approximately 20% of the doctors answered that they were well aware of the service, while 55% responded that they did not know about it. For a visit, a KM doctor selected the appropriate diseases in the order of stroke, dementia and Parkinson's disease, osteoarthritis, and chronic diseases. Among treatments, acupuncture, moxibustion, and herbal medicine exhibited similar results. The most common opinion was that KM doctors should schedule their visits once a week for 6-12 months, which was the most prolonged period among the given options. More than 80% (84.1%) of the doctors replied that care projects were highly essential, and about 63.8% expressed their willingness to participate in these projects. Conclusion: To provide appropriate home health care, we must raise awareness among Korean medicine doctors. In addition, the healthcare budget must be increased to provide the required support.

Randomized, Double-blind, and Placebo-controlled a Clinical Study for Chronic Fatigue via the Analysis of Efficacy and Safety of Gongjin-dan and Ssanghwa-tang : Study Protocol (만성피로에 대한 공진단과 쌍화탕의 안전성 및 유효성 평가를 위한 무작위배정, 이중눈가림, 위약대조 임상시험 : 임상연구 프로토콜)

  • Jun-Yong, Choi;Byungmook, Lim;Hyeun-kyoo, Shin;Kibong, Kim
    • Journal of Society of Preventive Korean Medicine
    • /
    • v.26 no.3
    • /
    • pp.97-108
    • /
    • 2022
  • Objectives : The purpose of this study is to confirm the efficacy and safety of Gongjin-dan and Ssanghwatang for chronic fatigue. Methods : A total of 90 people, between 19 and 65 years old, will be recruited to participate in a randomized, double-blind, and placebo-controlled a clinical trial. Participants in the Gongjin-dan group will take one pill of Gongjin-dan along with three packs of placebo oral liquid Ssanghwa-tang per day for 4 weeks. Participants in the Ssanghwa-tang group will take three packages of liquid Ssanghwa-tang and one placebo Gongjindan pill per day for 4 weeks. In the placebo group, participants will take one pill of placebo Gongjin-dan and three packs of placebo liquid Ssanghwa-tang per day, for 4 weeks. Outcomes will be measured at the baseline, 4th week, and 6th week. The primary outcome is the change in the Fatigue Severity Scale (FSS). Secondary outcomes are the change of Multidimensional Fatigue Inventory-20 (MFI-20), Chalder Fatigue Scale (CFQ), Short-Form 36 Health Survey (SF-36), Korean Version of Schedule of Fatigue and Anergy/General Physician (SOFA/GP), Glucose, Lactate, Ammonia, Free Fatty Acid (FAA), d-ROMs&BAP, Selenium, and Cortisol. Results : This trial was approved by the institutional review board of Pusan National University Korean Medicine Hospital (registry number: PNUKHIRB 2021-10-005). Recruitment opened in November 2021 and is supposed to be completed by December 2022. Conclusions : This trial will provide clinical information to determine the efficacy and safety of Gongjindan and Ssanghwa-tang for chronic fatigue.

A FRAMEWORK FOR ACTIVITY-BASED CONSTRUCTION MANAGEMENT SIMILATION

  • Boong Yeol Ryoo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.732-737
    • /
    • 2009
  • Due to various project delivery methods and the complexity of construction projects in the construction industry, developing the framework of construction management for critical, highly complex projects in the construction industry has become problematic. Currently, a set of construction manuals play a pivotal role in planning and managing construction projects as subcontractors try to complete their scope of work according to the instructions of a general contractor. It is challenging for general contractors to write a construction management procedure manual to cover various types of project delivery methods and construction projects. In construction, the construction procedure manuals describe specific actions to be taken through the project. In reality a few contactors own such manuals and their construction schedules include more construction operation activities. Thus, it is hard to estimate the workload and productivity of construction managers because the manual and the schedule do not present the amount of management efforts required to complete a project. This paper proposes a framework to present construction management tasks according to project delivery methods which can be applied to various construction projects. Actions for management tasks were mapped and were integrated with construction activities throughout the project life cycle. The framework can then be used to give specific instructions to project participants, collect management actions, and replicate management actions throughout the project life cycle. The framework can also be can used to visualize complete construction project to analyze and manage construction management activities in each phase of a project in order to enhance productivity and efficiency. The studies of existing construction manuals were carried out to identify construction managers' responsibilities. An artificial intelligence program, CLIPS (C-Language Integrated Production System) was used to search for appropriate actions for impending tasks from a set of predefined actions to be performed for a given situation. The framework would significantly help construction managers to understand interrelations among management tasks or actions within a project. Furthermore, the framework can be embedded into Building Information Modeling (BIM) or Facility Management Systems (FMS) so that designers and constructors would execute constructability review before construction begins.

  • PDF

A Execution Performance Analysis of Applications using Multi-Process Service over GPU (다중 프로세스 서비스를 이용한 GPU 응용 동시 실행 성능 분석)

  • Kim, Se-Jin;Oh, Ji-Sun;Kim, Yoonhee
    • KNOM Review
    • /
    • v.22 no.1
    • /
    • pp.60-67
    • /
    • 2019
  • Graphical Processing Units(GPUs) achieve high performance undertaking from relatively uniformed computation in parallel. The technology related to General Purpose GPU(GPGPU) has been enhanced, which provides concurrent kernel execution of multi and diverse applications at the same time, but it is still limited to support resource sharing or planning. NVIDIA recently introduces Multi-Process Service(MPS), which allows kernels from different applications can be execute concurrently. However, the strength of MPS comes along with the characteristics of applications and the order of their execution. This paper shows the performance analysis of diverse scientific applications in real world. Based on the analysis, we prove that it is important to the identify characteristics of co-run applications, and to schedule multiple applications via profiling to maximize MPS functionality.