• Title/Summary/Keyword: Schedule information

Search Result 1,096, Processing Time 0.029 seconds

QA-MAC: QoS-Aware MAC Protocol for Wireless Sensor Networks

  • Kim, Seong-Cheol;Park, Hyun-Joo
    • Journal of information and communication convergence engineering
    • /
    • v.8 no.2
    • /
    • pp.223-227
    • /
    • 2010
  • In this paper, we present a QoS-aware MAC protocol (QA-MAC) for cluster based wireless sensor networks (WSNs). QA-MAC is a TDMA-based scheduling protocol that minimizes the energy consumption in multi-hop WSNs and provides Quality of Service (QoS). A dynamic scheduling algorithm according to the number of member nodes, node traffics, and traffic priorities is suggested. The selected cluster head allocates time slots for all member nodes in the first TDMA schedule period of each round. During the second schedule period in each round, the cluster head makes a schedule for all data transmission. The proposed QA-MAC (QoS-Aware MAC) could save energy, reduce transmission delay, and support QoS.

An Enhanced Simulated Annealing Algorithm for Rural Postman Problems (Rural Postman Problem 해법을 위한 향상된 Simulated Annealing 알고리즘)

  • 강명주
    • Journal of the Korea Society of Computer and Information
    • /
    • v.6 no.1
    • /
    • pp.25-30
    • /
    • 2001
  • This paper proposes an enhanced Simulated Annealing(SA) algorithm for Rural Postman Problems(RPPs). In SA, the cooling schedule is an important factor for SA algorithms. Hence, in this paper a cooling schedule is proposed for SA for RPPs. In the simulation. the results of the SA using the proposed cooling schedule and the results of the SA using the existing cooling schedules are compared and analyzed. In the simulation results, the proposed method obtained the better results than the existing methods.

  • PDF

Smart Adapted Service in Ubiquitous (유비쿼터스 환경에서 사용자의 일정에 따른 지능 정보 제공 시스템)

  • Ahn, Ho-Seok;Sa, In-Kyu;Baek, Young-Min;Ahn, Youn-Seok;Choi, Jin-Young
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.3
    • /
    • pp.480-487
    • /
    • 2008
  • In this paper, we propose a Smart Adapted Service which can manage a schedule automatically. Smart Adapted Service gives a notice beforehand regarding information associated with the schedule, by searching the Internet. If the user has written down the name of goods or food which he wants to buy, Smart Adapted Service finds the most suitable store nearby him using the user's favorite list. The user's favorite list is created by Outlook Web Access System by analysing the schedule and habits of the user. User can access Smart Document System remotely through the Internet using Outlook Web Access System. We developed an Auto AP Roaming System for seamless communication and Smart Document System for arranging the information. We evaluated the system and verified that it is convenient to use and working well.

A Fault-tolerant Task Scheduling Algorithm Supporting the Minimum Schedule Length (최소의 스케줄 길이를 유지하는 결함 허용 태스크 스케줄링 알고리즘)

  • Min, Byeong-Jun
    • The Transactions of the Korea Information Processing Society
    • /
    • v.7 no.4
    • /
    • pp.1201-1210
    • /
    • 2000
  • In order to tolerate faults which may occur during the execution of distributed tasks in high-performance parallel computer systems, tasks are duplicated on different processors. In this paper, by utilizing the task duplication based scheduling algorithm, a new task scheduling algorithm which duplicates each task on more than two different processors with the minimum schedule length is presented, and the number of processors required for the duplication is analyzed with the ratio of communication cost to computation time and the workload of the system. A simulation with various task graphs reveals that the number of processors required for the full-duplex fault-tolerant task scheduling with the obtainable minimum schedule length increases about 30% to 75% when compared with that of the task duplication based scheduling algorithm.

  • PDF

Automated Generation of a Construction Schedule Based on the Work Method Template for 4D Simulation (4D 시뮬레이션을 위한 공법 템플릿 기반의 건설공정 자동 생성)

  • Song, Sung-Yol;Yang, Jeong-Sam;Myung, Tae-Sik
    • IE interfaces
    • /
    • v.25 no.2
    • /
    • pp.216-228
    • /
    • 2012
  • BIM-based 4D simulation makes people easily understand complex construction process using 3D graphics model and helps them review and identify the construction schedule in each phase of the construction process. Moreover, 4D simulation can be used as reference data to determine the validity of the process in the design phase and will be utilized as a measure for checking the construction process. Therefore 4D simulation of construction improves efficiency of project management. However, current commercial applications available for 4D simulation do not provide sufficient functions for connection of 3D models and process information. In this paper, we propose an automated generation method through the definition of the process based on a work method template and developed the template based schedule generation system (TSGS).

A study of auxiliary schedules in classification (분류표에서 사용하는 보조표에 대한 연구)

  • 정해성
    • Journal of Korean Library and Information Science Society
    • /
    • v.28
    • /
    • pp.193-218
    • /
    • 1998
  • The purpose of this study is to analyze and compare of the structure of auxiliary schedules using in DDC, UDC, CC and BC. Auxiliary schedule whish are a n.0, ppended to schedule of all schemes of classification. They consist of items of form of presentation relationship, time, place, languages, racial, ethnic, national groups and persons and phase relation and the symbols of the different items can be added to classification numbers.

  • PDF

The Establishment of an Activity-Based EVM - PMIS Integration Model (액티비티 기반의 EVM - PMIS 통합모델 구축)

  • Na, Kwang-Tae;Kang, Byeung-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.199-212
    • /
    • 2010
  • To establish an infrastructure for technology and information in the domestic construction industry, several construction regulations pertaining to construction information have been institutionalized. However, there are major problems with the domestic information classification system, earned value management (EVM) and project management information system (PMIS). In particular, the functions of the current PMIS have consisted of a builder-oriented system, and as EVM is not applied to PMIS, the functions of reporting, analysis and forecast for owners are lacking. Moreover, owners cannot confirm information on construction schedule and cost in real time due to the differences between the EVM and PMIS operation systems. The purpose of this study is to provide a framework that is capable of operating PMIS efficiently under an e-business environment, by providing a proposal on how to establish a work breakdown structure (WBS) and an EVM - PMIS integration model, so that PMIS may provide the function of EVM, and stakeholders may have all information in common. At the core of EVM - PMIS integration is the idea that EVM and PMIS have the same operation system, in order to be an activity-based system. The principle of the integration is data integration, in which the information field of an activity is connected with the field of a relational database table consisting of sub-modules for the schedule and cost management function of PMIS using a relational database management system. Therefore, the planned value (PV), cost value (CV), actual cost (AC), schedule variance (SV), schedule performance index (SPI), cost variance (CV) and cost performance index (CPI) of an activity are connected with the field of the relational database table for the schedule and cost sub-modules of PMIS.

Analysis of Multi-Pass Wet Wire Drawing Process and Its Application (다단 습식 신선공정 해석 및 적용)

  • Lee S. K.;Kim B. M.
    • Transactions of Materials Processing
    • /
    • v.14 no.8 s.80
    • /
    • pp.689-695
    • /
    • 2005
  • Multi-pass wet wire drawing process is used to produce fine wire in the industrial field. The production of fine wire through multi-pass wet wire drawing process with appropriate dies pass schedule would be impossible without understanding the relationship among many process parameters such as material properties, dies reduction, friction conditions, drawing speed etc However, in the industrial field, dies pass schedule of multi-pass wet wire drawing process has been executed by trial and error of experts. This study investigated the relationship among many process parameters quantitatively to obtain the important process information fur the appropriate pass schedule of multi-pass wet wire drawing process. Therefore, it is possible to predict the many important process parameters of multi-pass wet wire drawing process such as dies reduction, machine reduction, drawing force, backtension force, slip rate, slip velocity rate, power etc. The validity of the analyzed drawing force was verified by FE simulation and multi-pass wet wire drawing experiment. Also, pass redesign was performed based on the analyzed results, and the wire breakage between the original pass schedule and the redesigned pass schedule was compared through experiment.

The exposure-time schedule for uniform diffraction efficiency in angle/fractal multiplexing of holographic data storage (홀로그래픽 저장장치의 각/프랙탈 다중화 방식에서 균일한 회절 효율을 위한 기록 시간 분배)

  • Lee, Jae-Sung;Choi, Jin-Young;Yang, Hyun-Seok;Park, Young-Pil;Park, No-Chul
    • 정보저장시스템학회:학술대회논문집
    • /
    • 2005.10a
    • /
    • pp.139-144
    • /
    • 2005
  • Because of the photorefractive recording dynamics, each newly recorded hologram partially erases all previously stored image. Thus achieving the desired diffraction efficiency profile for the entire sequence after all images have been recorded requires exposure time schedule. The often cited classical exposure-schedule model predicts a rising-exponential build-up and an exponential decay in An with an exposure time. However because we cannot directly measure the An, it's difficult to establish the relation of both. In this paper, we deduce the relation of diffraction efficiency and exposure time from experiment data and suggest an algorithm to make time schedule profile in angle/fractal multiplexing of holographic data storage. After that, we present simulated result with equal hologram diffraction efficiency for a sequence of 250 holograms recorded by angle/fractal multiplexing.

  • PDF

Development of a Web-based Schedule Tool Using Flash (플래시를 이용한 웹기반 일정관리 도구 개발)

  • Jang, Myung-Houn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.2
    • /
    • pp.51-57
    • /
    • 2010
  • Schedule management of construction work is important in order to complete construction projects within a given period of time. As activities increase and relations become more complex, schedule management software becomes increasingly necessary. To address this, attempts are being made to incorporate web-based ICT (information and communications technology) in construction project management. This research proposed a method to manage construction schedules via web pages using Flash. The interactive and graphic property of Flash enables a field manager to manage schedules easily and efficiently. A prototype was implemented using Flash and Action Script, and it was applied to a sample network in a web page.