A Study on the EVMS for successful application to KHP program (한국형 헬기 시제품 개발을 위한 EVMS 적용방안에 관한 연구)

  • We, Oh-Gie;Chung, Ho-Su
    • Journal of the military operations research society of Korea
    • /
    • v.32 no.1
    • /
    • pp.73-89
    • /
    • 2006
  • In this paper, EVMS procedure for KHP program is presented. Research and development of a defense system as a long lead program has a high probability of cost growth due to the uncertainty and risk. Therefore, meeting schedule, technical performance and preventing excessive cost overrun are the main concerning point to successful research and development program. EVMS(Earned Value Management System) is a program management system using earned value to control cost, schedule and technical performance. In order to control cost and schedule and to meet technical performance requirements of the KHP research and development program, it is necessary for us to adapt EVMS to the program.

A Study on Material Requirement Planning by Integrating Schedule and Cost (비용$\cdot$일정 통합관리를 이용한 자원소요계획에 관한 연구)

  • Song Young-Woong;Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.1 s.13
    • /
    • pp.106-113
    • /
    • 2003
  • In this study, The matrix method was used with common category concept according to the construction project control system. For the purpose of systematic resource management planning, it should be established on accomplished EVM data for clearing the ordering point according to the attribute procurement analysis. Resource management was presented by connecting the material requirement calculation method and the attribute of procurement method based on the EVM, suggested through analyzing process-data modeling using integrated schedule, cost and material.

Multi-family Residential Construction Management Practice in the U.S.

  • Cho, Namho
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1254-1254
    • /
    • 2022
  • The Multi-family Residential is one of the most famous building types for a rental property in the US. Often times it includes multiple residential buildings and some amenity facilities, including a clubhouse or leasing office, swimming pool, dog park, and garages. Since the building type is built for rental purposes, the construction planning is phased and it makes the project complicated. Detailed planning and execution are important for successful construction management. This paper provides some management practices that are applied to one of the multi-family residential construction projects in Phoenix, AZ. The Front End Planning (FEP) process performed by both owner and contractor is the first key to a successful construction project. Specifically, the early review of phased turnover strategy, grading, fire/Americans with Disabilities Act (ADA) compliance, and Mechanical/ Electricity/Plumbing/Technology (MEPT) will provide absolute benefit to the project. Second, using a scheduling method to control short-term schedules and long-term can provide the ability to manage the issues with agility. Third, material delivery and procurement dominate the both project schedule and cost. With this COVID-19 circumstance, it is hard to expect the material, equipment, and labor forces to be delivered on time with the contracted price. Managing floats are more than important to managing construction productivity. Risk management should work to share the risks fairly. Lastly, turnover is directly linked with the profit of the project for both owner and contractor. The communication between the owner and contractor to re-schedule the proper turnover schedule is important for the phased construction project.

  • PDF

A Scheduling System for the Patient Treatment on a Heavy-ion Radiotherapy

  • Toyama, Hinako;Shibayama, Kouichi;Kanatsu, Syusuke;Kuroiwa, Toshitaka;Watanabe, Hideo;Wakaisami, Mitsuji;Tsuji, Hiroshi;Endo, Masahiro;Tsujii, Hirohiko
    • Proceedings of the Korean Society of Medical Physics Conference
    • /
    • 2002.09a
    • /
    • pp.177-179
    • /
    • 2002
  • We have developed a scheduling system for heavy ion radiotherapy considering the condition of three treatment rooms and treatment planning for each patient. This system consists of a database (patient information, treatment method and machine schedule), a schedule for radiotherapy and WEB server. All operation of this system, such as data input, to change and to view the schedule, are performed by using a WEB browser. In order to protect personal information for the patients, access privilege to each information are limited by according to the occupational category. This system is connected with a hospital central information management system (AMIDAS) and an irradiation-managing computer for the heavy ion radiotherapy. A basic information for the patient is got from AMIDAS and the daily schedule sends to the treatment control computer at each treatment room through the irradiation-managing computer every morning. The daily, weekly, monthly schedules in the treatment room and the treatment condition of each patient are shared on the WEB browser with the all participants of the heavy ion therapy. This system could be useful to save a time to generate a treatment schedule and to inform us the most up-to-date treatment schedule and the related information at the same time.

  • PDF

Effect of Extended Egg Preservation Schedule in Conservation of Mutant Silkworm (Bombyx mori L.) Genetic Stocks in Gene Bank

  • Muthulakshmi M.;Mohan B.;Balachandran N.;Sinha R. K.;Thangavelu K.
    • International Journal of Industrial Entomology and Biomaterials
    • /
    • v.11 no.2
    • /
    • pp.93-98
    • /
    • 2005
  • Studies on extended egg preservation schedule from 120 days to 180 days was taken up with 20 germplasm accessions of mutant silkworm genetic stocks of Bombyx mori L. Statistical analyses of the data collected over three trials revealed no significant changes both in the qualitative and quantitative traits of the genetic stocks between treatment (6 months egg preservation) and control (4 months egg preservation), except for fifth instar larval duration in TMS-61, TMS-62, TMS64, TMS-31 and TMS-34 shell weight in TMS-62, TMS-64 and TMS-66. Thus, the results indicate that extended schedule of 6 months egg preservation can safely be adopted, which will reduce the cost of conservation and minimize the genetic erosion owing to reduced crop cycle.

A Study on the Heuristics Algorithm for a establishing Vehicle Scheduling Plan under dynamic environments - With the emphasis on the GPS and Digital Map - (동적인 환경하에서의 차량경로계획 수립을 위한 발견적 기법에 관한 연구 - GPS와 전자지도의 활용을 중심으로 -)

  • 박영태;김용우;강승우
    • Proceedings of the Korean DIstribution Association Conference
    • /
    • 2003.05a
    • /
    • pp.55-70
    • /
    • 2003
  • The most transport companies are placing increasing emphasis on powerful new techniques for planning their vehicle operations. They have tried to improve their vehicle control and customer service capability by adopting tile advanced information technology, such as GPS(Global Position System) and Using Digital Map. But researches on the VRSP(vehicle routing St schedule problem) in this situation were very few. The purpose of this research is to develop vehicle scheduling heuristics for making a real-time dynamic VRSP under the situation that GPS and using Digital Map are equipped to the transport company. Modified savings techniques are suggested for the heuristic method and an insertion technique is suggested for the dynamic VRSP. The urgent vehicle schedule is based on the regular vehicle schedule. This study suggest on VRSP system using GPS and Digital Map and the performance of the suggested heuristics is illustrated through an real case example.

  • PDF

Case Studies of the Software Development Applying EVM(Earned Value Management) (소프트웨어개발 프로젝트에서의 획득가치관리(EVM) 적용 사례 연구)

  • Jun, Sung-Chul;Kim, Ja-Hee
    • Journal of Information Technology Services
    • /
    • v.7 no.3
    • /
    • pp.129-144
    • /
    • 2008
  • The uncertainty of software projects makes a big gap between the initial schedule/expense and the final one. Moreover, it is difficult for a project manager to reschedule and re-budget for reflecting the effects of changes in the software development. In this paper, we suggest EVM (Earned Value Management) to control the schedule and the expenses of an on-going software development project. In order to apply EVM to a software project, we consider turnkey contracts and propose the way to calculate the earned value for the software development. Finally, we illustrate our method with the case of N-company. We expect our EVM help to analyze and to predict the final schedule and the expense of a software development project.

Near-Optimal Algorithm for Group Scheduling in OBS Networks

  • Nhat, Vo Viet Minh;Quoc, Nguyen Hong;Son, Nguyen Hoang
    • ETRI Journal
    • /
    • v.37 no.5
    • /
    • pp.888-897
    • /
    • 2015
  • Group scheduling is an operation whereby control packets arriving in a time slot schedule their bursts simultaneously. Normally, those bursts that are of the same wavelength are scheduled on the same channel. In cases where the support of full wavelength converters is available, such scheduling can be performed on multiple channels for those bursts that are of an arbitrary wavelength. This paper presents a new algorithm for group scheduling on multiple channels. In our approach, to reach a near-optimal schedule, a maximum-weight clique needs to be determined; thus, we propose an additional algorithm for this purpose. Analysis and simulation results indicate that an optimal schedule is almost attainable, while the complexity of computation and that of implementation are reduced.

A Study on the Improvement of Railway Construction Schedule Using KTX Construction Case (경부고속철도 사례분석을 통한 철도건설공기 개선에 관한 연구)

  • Yang, Yeonjong;Chung, Byunghyun
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.6
    • /
    • pp.662-669
    • /
    • 2012
  • In 2004, KTX operated in Korea on the 5th in the world. But there are various factor on planed schedule delay of Big National Construction Project like Seoul-Busan High Speed Rail Project(Seoul-Busan HSR). For example, Often change of government policy, project management control problem of design and construction, conflict of interested party like environmental organization/resident are the main delay factors. The suggestions for improvement of the construction schedule through the Seoul-Busan HSR will help to make a new leap forward in rail construction.

Optimization of Job-Shop Schedule Considering Deadlock Avoidance (교착 회피를 고려한 Job-Shop 일정의 최적화)

  • Jeong, Dong-Jun;Lee, Du-Yong;Im, Seong-Jin
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.24 no.8 s.179
    • /
    • pp.2131-2142
    • /
    • 2000
  • As recent production facilities are usually operated with unmanned material-handling system, the development of an efficient schedule with deadlock avoidance becomes a critical problem. Related researches on deadlock avoidance usually focus on real-time control of manufacturing system using deadlock avoidance policy. But little off-line optimization of deadlock-free schedule has been reported. This paper presents an optimization method for deadlock-free scheduling for Job-Shop system with no buffer. The deadlock-free schedule is acquired by the procedure that generates candidate lists of waiting operations, and applies a deadlock avoidance policy. To verify the proposed approach, simulation resultsare presented for minimizing makespan in three problem types. According to the simulation results the effect of each deadlock avoidance policy is dependent on the type of problem. When the proposed LOEM (Last Operation Exclusion Method) is employed, computing time for optimization as well as makespan is reduced.