• Title/Summary/Keyword: Satellite operation

Search Result 901, Processing Time 0.028 seconds

Analysis of Tropospheric Carbon Monoxide and Ozone Production in East Asia

  • Lee S. H.;Choi G. H.;Lim H. S.;Lee J. H.;Seo D.C.;Jun J. N.;Jung J. H.;Kim I. S.;Kim J.
    • Proceedings of the KSRS Conference
    • /
    • 2004.10a
    • /
    • pp.182-183
    • /
    • 2004
  • Atmospheric carbon monoxide (CO) and ozone $(O_3)$ play the important trace gases in tropospheric chemistry, through its concentration in the troposphere directly influences the concentrations of tropospheric hydroxyl (OH). Understanding the impact of CO and $O_3$ on the global tropospheric chemistry requires measurements of the global atmospheric CO and $O_3$ distributions. This study focuses on the identification of CO and O3 released in the East Asia between March 2000 and February 2004. During the period, the MOPITT instrument onboard the Earth Observing System (EOS)-Terra platform collected extensive measurement of CO. So we have used MOPITT data at 700hPa to analyze seasonal distribution of CO concentration. And the O3 measurements for this study were Total Ozone Mapping Spectrometer (TOMS) and Dobson spectrometer provided NASA/GSFC and Yonsei University, Korea. During springtime, the CO and O3 concentrations were increased over East Asia for April, May, and June. CO and O3 transport and chemistry in the springtime in East Asia are studied by use of the HYbrid Single Particle Lagrangian Integrated Trajectory (HYSPLIT) model.

  • PDF

Ground Receiving System for KOMPSAT-2

  • Kim, Moon-Gyu;Kim, Tae-Jung;Choi, Hae-Jin;Park, Sung-Og;Lee, Dong-Han;Im, Yong-Jo;Shin, Ji-Hyun;Choi, Myung-Jin;Park, Seung-Ran;Lee, Jong-Ju
    • Korean Journal of Remote Sensing
    • /
    • v.19 no.3
    • /
    • pp.191-200
    • /
    • 2003
  • Remote sensing division of satellite technology research center (SaTReC) , Korea advanced institute of science and technology (KAIST) has developed a ground receiving and processing system for high resolution satellite images. The developed system will be adapted and operated to receive, process and distributes images acquired from of the second Korean Multi-purpose Satellite (KOMPSAT-2), which will be launched in 2004. This project had initiated to develop and Koreanize the state-of-the-art technologies for the ground receiving system for high resolution remote sensing images, which range from direct ingestion of image data to the distribution of products through precise image correction. During four years development from Dec. 1998 until Aug. 2002, the system had been verified in various ways including real operation of custom-made systems such as a prototype system for SPOT and a commercialized system for KOMPSAT-1. Currently the system is under customization for installation at KOMPSAT-2 ground station. In this paper, we present accomplished work and future work.

Atmospheric Effects during Solar Storms

  • Lee, J.H.;Choi, G.H.;Kim, J.W.;Seo, S.B.;Lee, S.H.
    • Proceedings of the KSRS Conference
    • /
    • 2003.11a
    • /
    • pp.840-842
    • /
    • 2003
  • Recent satellite data have revealed a correlation between the Sun’s activities and the Earth’s atmosphere . Many scientists have been conjectured a more direct connections between solar variability and the Earth’s atmosphere from satellite data analysis. During solar storms, more energetic particles reach the Earth’s atmosphere and this phenomenon have effects on the Earth’s atmospheric environment. Consequently, scientists suggest that these variations will affect a global climate change. In this study, we investigate the confirmative research results of atmospheric effects due to solar activities, especially solar storms.

  • PDF

Analysis on Processing Timeline of COMS LHGS Design

  • Bae, Hee-Jin;Koo, In-Hoi;Seo, Seok-Bae;Ahn, Sang-Il;Kim, Eun-Kyou
    • Proceedings of the KSRS Conference
    • /
    • v.1
    • /
    • pp.216-219
    • /
    • 2006
  • This paper analyzes on LHGS (LRIT/HRIT Generation Subsystem) processing timeline for COMS LHGS design. The LHGS shall transmit LRIT/HRIT (Low Rate Information Transmission/ High Rate Information Transmission) data to the users within 15 minutes after the end of the image acquisition. So, this paper performs experiment using MTSAT-1R LRIT/HRIT (11 days) and calculates minimum LHGS processing time. Only HRIT FD (Full Disk) image is considered in this paper because data size of HRIT FD image is the largest. As a result of experiment, COMS LHGS should be able to receive MI Level 1B product within 157 seconds at least.

  • PDF

Launch Site Activities for the Launch of an Earth Observation Satellite

  • Im, Jeong-Heum
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.37 no.2
    • /
    • pp.195.1-195.1
    • /
    • 2012
  • Korea Aerospace Research Institute has developed an earth observation satellite whose primary mission objective is to provide high resolution electro optical earth images for Geographical Information Systems (GIS) establishment and the applications for environmental, agriculture and ocean monitoring. It was successfully launched into its mission orbit by using a commercial launch vehicle on 18th of May, 2012. This paper describes a series of launch activity at the launch site including its transportation to the launch site. Before conducting the launch site operation, satellite operation plane was prepared. Combining the satellite operation plan and launch vehicle activities, an integrated launch site operation plan and schedule have been drawn up. After arrival of the spacecraft at the launch site, post-ship check out has been conducted. And then it was fuel loaded and integrated with launch vehicle hardware. After completion of final electrical check out, count down procedure was executed. on 18th of May, it was launched into the space and was separated from the launch vehicle as planned. About 3 months of early operation and calibration/validation, now the satellite is conducting its normal mission.

  • PDF

THE IMPLEMENTATION METHOD AND TEST OF TELEMETRY TREND ANALYSIS IN KOMPSAT-2

  • Kim Myungja;Jung Won-Chan;Kim Jae-Hoon
    • Bulletin of the Korean Space Science Society
    • /
    • 2004.10b
    • /
    • pp.235-238
    • /
    • 2004
  • In this paper, we will present the implementation method of telemetry trend analysis in KOMPSAT-2 (KOrea Multi Purpose SATellite II), and then we will show the test result of trend analysis with telemetry data. Trend Analysis function is one of the module of Satellite Operations Subsystem and that analyzes the telemetry data of satellite state of health and telemetry trend for operation support. With this system many clients can analyze telemetry data simultaneously.

  • PDF

Design, Implementation, and Validation of KOMPSAT-2 Software Simulator

  • Lee, Sang-Uk;Lee, Byoung-Sun;Kim, Jae-Hoon;Cho, Sung-Ki
    • ETRI Journal
    • /
    • v.27 no.2
    • /
    • pp.140-152
    • /
    • 2005
  • In this paper, we present design features, implementation, and validation of a satellite simulator subsystem for the Korea Multi-Purpose Satellite-2 (KOMPSAT-2). The satellite simulator subsystem is implemented on a personal computer to minimize costs and trouble on embedding onboard flight software into the simulator. An object-oriented design methodology is employed to maximize software reusability. Also, instead of a high-cost commercial database, XML is used for the manipulation of spacecraft characteristics data, telecommand, telemetry, and simulation data. The KOMPSAT-2 satellite simulator subsystem is validated by various simulations for autonomous onboard launch and early orbit phase operations, anomaly operation, and science fine mode operation. It is also officially verified by successfully passing various tests such as the satellite simulator subsystem test, mission control element system integration test, interface test, site installation test, and acceptance test.

  • PDF

OVERALL LINK ANALYSIS ON HRIT AND LRIT IN COMS

  • Park Durk-Jong;Hyun Dae-Wan;Kang Chi-Ho;Ahn Sang-Il;Kim Eun-Kyu
    • Proceedings of the KSRS Conference
    • /
    • 2005.10a
    • /
    • pp.98-100
    • /
    • 2005
  • This paper describes link analysis on the processed data, HRIT (High Rate Information Transmission) and LRIT (Low Rate Information Transmission), for the preliminary design of interface between COMS (Communication, Ocean and Meteorological Satellite) and ground station. At the MODAC (MeteorologicaVOcean Data Application Center), the processed data are transmitted to user station via COMS with normalization and calibration by pre-processing of MI (Meteorological Imager) data. Due to consider satellite as radio relay, overall analysis containing uplink and downlink is needed. Specific link parameters can be obtained with using the outcomes of SRR (System Requirement Review) which was held on 13-14 June 2005, in Toulouse. From the relation between overall link margin and output power of HPA (High Power Amplifier) of MODAC, it is shown that even though the minimum power related with COMS receiving power range is transmitted at MODAC, the obtained link margin of HRIT could be above 3 dB at user station which antenna elevation angle is 10 degree.

  • PDF

The Design of MSC(Multi-Spectral Camera) System Operation

  • Yong, Sang-Soon;Kong, Jong-Pil;Heo, Haeng-Pal;Kim, Young-Sun;Park, Jong-Euk;Paik, Hong-Yul;Ra, Sung-Woong
    • Proceedings of the KSRS Conference
    • /
    • 2003.11a
    • /
    • pp.825-827
    • /
    • 2003
  • Multi-Spectral Camera(MSC) is a payload on the KOMPSAT-2 satellite to perform the earth remote sensing. The instrument images the earth using a push-broom motion with a swath width of 15 km and a ground sample distance (GSD) of 1 m over the entire field of view (FOV) at altitude 685 Km. The instrument is designed to have an on-orbit operation duty cycle of 20% over the mission lifetime of 3 years with the functions of programmable gain/ offset and on-board image data compression/storage. The MSC instrument has one(1) channel for panchromatic imaging and four(4) channel for multi-spectral imaging covering the spectral range from 450nm to 900nm using TDI CCD Focal Plane Array (FPA). In this paper, the architecture and function of MSC hardware including electrical interface and the operation concept which have been established based on the mission requirements are described. And the design and the preparation of MSC system operation are analyzed and discussed.

  • PDF