• Title/Summary/Keyword: Samcheonpo TPP

Search Result 2, Processing Time 0.014 seconds

Flow Measurement and Characteristic Analysis in the Effluent Regions of the Samcheonpo Thermal Power Plant(TPP) (삼천포 화력발전소 방류수로 및 방류해역의 흐름 관측 및 특성분석)

  • Cho, Hong-Yeon;Jeong, Shin-Taek;Kang, Keum-Seok
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.18 no.4
    • /
    • pp.329-337
    • /
    • 2006
  • A small hydro-power plant operated by cooling water discharged from the power plant is under construction. In this study, the flow characteristics of the effluent channel and the outfall coastal zone in which the facilities are constructed have been measured and analysed. The flow pattern is highly dependent on the effluent discharge and clearly classified as these typical areas; the upstream and downstream areas of the weir, and the outfall coastal zone. The discharge and the width of the channel in the upstream area of the weir are increased step by step, so the water level fluctuation is small. The flow overtopping the weir is rapidly changing and has highly vertical fluctuation patterns after hydraulic jump just below the weir. The flow pattern in the outfall zone is directed toward the seaward direction and the velocity is dominated by the tidal level fluctuation. The mean tidal range in this area is about 10% greater than that of the Tongyeong tidal gauging station and the wave effects are negligible because of the sheltering effects of this area.

Prediction of the Flow Pattern Changes using FLOW-3D Model in the Effluent Region of the Samcheonpo Thermal Power Plant (TPP) (소수력 발전소 건설에 의한 삼천포 화력발전소 방류수로 흐름변화 예측)

  • Cho, Hong-Yeon;Jeong, Shin-Taek;Kim, Jeong-Dae;Kang, Kem-Seok
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.18 no.4
    • /
    • pp.338-347
    • /
    • 2006
  • A small hydro-power plant using the seawater used as the cooling (circulated) water and discharged is under construction. The bigger size of the small hydro-power plant, the better in order to maximize the efficiency and the electric power. The optimal size, however, should be determined in the constraints of the channel un-disturbed range. The water level change should be checked in detail based on the hydraulic behaviour. In this study, the FLOW3D model, three-dimensional flow model, is setup using the flow measurement data in the effluent discharge channel and the flow pattern changes due to the small hydro-power plant construction are predicted by the model. The plant construction makes the increasing of the water level, and the water level in the upstream of the channel weir is increased 65 cm from 4.32 m to 4.97 m, in the condition of the design discharge $156m^3/s$ and the movable weir height of the hydro-power plant 3.8 m.