• Title/Summary/Keyword: Safety volume

Search Result 1,187, Processing Time 0.028 seconds

Design and Implementation of a Hardware Accelerator for Marine Object Detection based on a Binary Segmentation Algorithm for Ship Safety Navigation (선박안전 운항을 위한 이진 분할 알고리즘 기반 해상 객체 검출 하드웨어 가속기 설계 및 구현)

  • Lee, Hyo-Chan;Song, Hyun-hak;Lee, Sung-ju;Jeon, Ho-seok;Kim, Hyo-Sung;Im, Tae-ho
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.24 no.10
    • /
    • pp.1331-1340
    • /
    • 2020
  • Object detection in maritime means that the captain detects floating objects that has a risk of colliding with the ship using the computer automatically and as accurately as human eyes. In conventional ships, the presence and distance of objects are determined through radar waves. However, it cannot identify the shape and type. In contrast, with the development of AI, cameras help accurately identify obstacles on the sea route with excellent performance in detecting or recognizing objects. The computer must calculate high-volume pixels to analyze digital images. However, the CPU is specialized for sequential processing; the processing speed is very slow, and smooth service support or security is not guaranteed. Accordingly, this study developed maritime object detection software and implemented it with FPGA to accelerate the processing of large-scale computations. Additionally, the system implementation was improved through embedded boards and FPGA interface, achieving 30 times faster performance than the existing algorithm and a three-times faster entire system.

Correction of the Ground Subsidence Risk Ratings during Open Cut Excavation (개착식 굴착공사 중 지반함몰 위험등급 분류시트의 등급 보정에 관한 연구)

  • Shin, Sang-Sik;Kim, Hak Joon
    • The Journal of Engineering Geology
    • /
    • v.31 no.2
    • /
    • pp.135-148
    • /
    • 2021
  • Ground subsidence risk ratings obtained from the site investigation during pre-excavation stages could be changed depending on the parameters revealed during construction activities. A method of correcting the pre-excavation ground subsidence risk ratings based on the site conditions observed in the field is suggested in this study. The elevation of groundwater table during the excavation may be different from the predicted value depending on the application of waterproofing methods and construction conditions. The drastic drawdown of groundwater table during the excavation could cause ground subsidence due to soil volume decrease related to consolidation or compression of the ground, whereas the rising of groundwater table caused by the intense rainfall may result in a high potential for ground subsidence due to heaving or boiling of the excavation bottom. Excessive displacements of retaining walls or ground settlements may cause ground subsidence, which also results in a high risk of ground subsidence caused by the destruction of buried pipelines. Reevaluation of ground subsidence risk ratings is suggested considering the fluctuation of groundwater table, condition of groundwater leakage, measured ground displacements, and soil types. Finally, the ground subsidence risk rating system is improved for better evaluation by using 12 factors in 5 categories.

Microscopic Traffic Analysis of Freeway Based on Vehicle Trajectory Data Using Drone Images (드론 영상을 활용한 차량궤적자료 기반 고속도로 미시적 교통분석)

  • Ko, Eunjeong;Kim, Soohee;Kim, Hyungjoo
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.20 no.6
    • /
    • pp.66-83
    • /
    • 2021
  • Vehicles experience changes in driving behavior due to the various facilities on the freeway. These sections may cause repetitive traffic congestion when the traffic volume increases, so safety issues may be raised. Therefore, the purpose of this study is to perform microscopic traffic analysis on these sections using drone images and to identify the causes of traffic problems. In the case of drone image, since trajectory data of individual vehicles can be obtained, empirical analysis of driving behavior is possible. The analysis section of this study was selected as the weaving section of Pangyo IC and the sag section of Seohae Bridge. First, the trajectory data was extracted through the drone image. And the microscopic traffic analysis performed on the speed, density, acceleration, and lane change through cell-unit analysis using Generalized definition method. This analysis results can be used as a basic study to identify the cause of the problem section in the freeway. Through this, we aim to improve the efficiency and convenience of traffic analysis.

A Study on Estimation of Road and Transportation Facility Improvement Direction Using Random Forest (랜덤 포레스트를 활용한 도로 및 교통시설 개선방향 추정 연구)

  • Hwang, Jae-seong;Kim, Do-kyeong;Kim, Nam-sun;Lee, Choul-ki
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.20 no.6
    • /
    • pp.37-46
    • /
    • 2021
  • Government agencies, such as police and local governments, strive to prevent traffic hazards and create a comfortable road environment by pormoting transportation and road facilities. To this end, roads and transportation facilities are enhanced and adjusted, and improvement projects in areas with frequent traffic accidents are carried out. Usually, improvement projects in areas with frequent traffic accidents vary by projects and region. Moreover, these projects are carried out under the supervision of a person in charge and related parties. Hence, civil complaints and subjectivity are reflected in deriving priorities for the improvement projects, limiting the efficiency of the project. To this end, a study was conducted to estimate the direction of improvement of the project target site. This study comprehensively considered road, traffic, and accident conditions of representative projects with high effectiveness in handling traffic accidents. The results of the study state that the accuracy of estimating the improvement project was around 88%. In addition, the study found that there was a strong relationship between traffic volume, accident rate, and accident severity in estimating the improvement direction.

Optimal Duration of Dual Antiplatelet Therapy after Stent-Assisted Coil Embolization of Unruptured Intracranial Aneurysms : A Prospective Randomized Multicenter Trial

  • Ban, Seung Pil;Kwon, O-Ki;Kim, Young Deok;Kim, Bum-Tae;Oh, Jae Sang;Kim, Kang Min;Kim, Chang Hyeun;Kim, Chang-Hyun;Choi, Jai Ho;Kim, Young Woo;Lim, Yong Cheol;Byoun, Hyoung Soo;Park, Sukh Que;Chung, Joonho;Park, Keun Young;Park, Jung Cheol;Kwon, Hyon-Jo;Korean NeuroEndovascular Society,
    • Journal of Korean Neurosurgical Society
    • /
    • v.65 no.6
    • /
    • pp.765-771
    • /
    • 2022
  • Objective : Stent-assisted coil embolization (SAC) has been increasingly used to treat various types of intracranial aneurysms. Delayed thromboembolic complications are major concerns regarding this procedure, so dual antiplatelet therapy with aspirin and clopidogrel is needed. However, clinicians vary the duration of dual antiplatelet therapy after SAC, and no randomized study has been performed. This study aims to compare the safety and efficacy of long-term (12 months) dual antiplatelet therapy and short-term dual antiplatelet therapy (6 months) after SAC for patients with unruptured intracranial aneurysms (UIAs). Methods : This is a prospective, randomized and multicenter trial to investigate the optimal duration of dual antiplatelet therapy after SAC in patients with UIAs. Subjects will receive dual antiplatelet therapy for 6 months (short-term group) or 12 months (long-term group) after SAC. The primary endpoint is the assessment of thromboembolic complications between 1 and 18 months after SAC. We will enroll 528 subjects (264 subjects in each group) and perform 1 : 1 randomization. This study will involve 14 top-performing, high-volume Korean institutions specializing in coil embolization. Results : The trial will begin enrollment in 2022, and clinical data will be available after enrollment and follow-up. Conclusion : This article describes that the aim of this prospective randomized multicenter trial is to compare the effect of short-term (6 months) and long-term (12 months) dual antiplatelet therapy on UIAs in patients undergoing SAC, and to find the optimal duration.

Performance of Feature-based Stitching Algorithms for Multiple Images Captured by Tunnel Scanning System (터널 스캐닝 다중 촬영 영상의 특징점 기반 접합 알고리즘 성능평가)

  • Lee, Tae-Hee;Park, Jin-Tae;Lee, Seung-Hun;Park, Sin-Zeon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.26 no.5
    • /
    • pp.30-42
    • /
    • 2022
  • Due to the increase in construction of tunnels, the burdens of maintenance works for tunnel structures have been increasing in Korea. In addition, the increase of traffic volume and aging of materials also threatens the safety of tunnel facilities, therefore, maintenance costs are expected to increase significantly in the future. Accordingly, automated condition assessment technologies like image-based tunnel scanning system for inspection and diagnosis of tunnel facilities have been proposed. For image-based tunnel scanning system, it is key to create a planar image through stitching of multiple images captured by tunnel scanning system. In this study, performance of feature-based stitching algorithms suitable for stitching tunnel scanning images was evaluated. In order to find a suitable algorithm SIFT, ORB, and BRISK are compared. The performance of the proposed algorithm was determined by the number of feature extraction, calculation speed, accuracy of feature matching, and image stitching result. As for stitching performance, SIFT algorithm was the best in all parts of tunnel image. ORB and BRISK also showed satisfactory performance and short calculation time. SIFT can be used to generate precise planar images. ORB and BRISK also showed satisfactory stitching results, confirming the possibility of being used when real-time stitching is required.

Study on Microstructure and Electrical Properties of Cement Mortar Containing Conductive Fibers (전도성 섬유가 함유된 시멘트 모르타르의 미세구조 및 전기적 특성 연구)

  • Park, Jong-Gun;Seo, Dong-Ju;Lim, Doo-Yeol;Lee, Yu-Jae;Heo, Gwang-Hee
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.26 no.3
    • /
    • pp.72-83
    • /
    • 2022
  • This paper studied the effect on the microstructure, electrical properties, and compressive strength of cement mortar containing carbon fiber (CF) and steel fiber (SF), which are conductive materials. The resistivity of conductive fiber-reinforced cement mortar (FRCM) was measured using the 4-probe method, and the compressive strength was measured based on the compression test. Their performance was compared and reviewed with plain mortar (PM). Furthermore, the surface shape and composition of the fracture surface of the conductive FRCM were analyzed using a scanning electron microscope (SEM) and an energy disperse X-ray spectrometer (EDS). The results showed that the resistivity gradually increased as the curing time increased in all specimens, whereas the resistivity decreased significantly as the fiber volume fraction increased. Adding steel fibers up to 1.25% did not affect the resistivity of cement mortar considerably. On the contrast, the resistivity of carbon fiber was somewhat decreased even at low contents (ie, 0.1 to 0.3%), and thereafter, it was significantly decreased. The percolation threshold of the conductive CFRCM containing CF used in this experiment was 0.4%, and it is judged to be the optimum carbon fiber dosage to maximize the conductive effect while maintaining the compressive strength performance as much as possible. For the surface shape and composition analysis of conductive FRCM, the fracture surface was observed through SEM-EDS. These results are considered to be very useful in establishing the microstructure mechanism of reinforcing fibers in cement mortars.

A Study on the Bituminization Process of Radiative Liquid Waste (II)

  • Lee, Sang-Hoon;Yoon, Myung-Hwan;Lee, Moon-Deuk
    • Nuclear Engineering and Technology
    • /
    • v.8 no.4
    • /
    • pp.231-242
    • /
    • 1976
  • The effects of temperature and pressure of leaching water on the leaching of radionuclides from bitumen-waste products were studied. The principal results are as follows: The fraction of $^{90}$ Sr and $^{137}$ Cs leached for periods of up to 120 days at 8atm was 2.1$\times$10$^{-6}$ ($\textrm{cm}^2$/g)$^{-1}$ , day$^{-1}$ and 6.02$\times$10$^{-5}$ ($\textrm{cm}^2$/g)$^{-1}$ day$^{-1}$ respectively and at 5$^{\circ}C$, 1.7$\times$10$^{-5}$ ($\textrm{cm}^2$/g)$^{-1}$ day$^{-1}$ and 4.01$\times$10$^{-5}$ ($\textrm{cm}^2$/g)$^{-1}$ day$^{-1}$ respectively. These values were lower than those in atmospheric pressure and room temperature. No diffence in the leaching rate with sea and distilled water was observed for the bitumen-waste products containing 40wt% salts. It appears that these results could be saved by improving safety in the dumping of sea. The effect of the softening point of pure asphalt or bitumen-waste product by $^{60}$ Co irradiation was increased with increasing total dose. Irradiation of asphalts at a total dose of 5.8$\times$10$^{8}$ rad showed no evidence of volume and caused no swelling. The functional groups of blown asphalt by infrared spectra are also identified.

  • PDF

Damage Evaluation of Adjacent Structures for Detonation of Hydrogen Storage Facilities (수소저장시설의 폭발에 대한 인접 구조물의 손상도 평가)

  • Jinwon Shin
    • Journal of Korean Society of Disaster and Security
    • /
    • v.16 no.1
    • /
    • pp.61-70
    • /
    • 2023
  • This study presents an analytical study of investigating the effect of shock waves generated by the hydrogen detonation and damage to structures for the safety evaluation of hydrogen storage facilities against detonation. Blast scenarios were established considering the volume of the hydrogen storage facility of 10 L to 50,000 L, states of charge (SOC) of 50% and 100%, and initial pressures of 50 MPa and 100 MPa. The equivalent TNT weight for hydrgen detonation was determined considering the mechanical and chemical energies of hydrogen. A hydrogen detonation model for the converted equivalent TNT weight was made using design equations that improved the Kingery-Bulmash design chart of UFC 3-340-02. The hydrogen detonation model was validated for overpressure and impulse in comparison to the past experimental results associated with the detonation of hydrogen tank. A parametric study based on the blast scenarios was performed using the validated hydrogen detonation model, and design charts for overpressure and impulse according to the standoff distance from the center of charge was provided. Further, design charts of the three-stage structural damage and standoff distance of adjacent structures according to the level of overpressure and impact were proposed using the overpressure and impulse charts and pressure-impulse diagrams.

On the Analysis of Transportation System in Mokpo Port (목포항 운송시스템의 분석에 관한 연구)

  • Nam, M.U.;Lee, C.Y.
    • Journal of Korean Port Research
    • /
    • v.11 no.2
    • /
    • pp.321-337
    • /
    • 1997
  • Rapid change in the technological environment of marine transportation and the development of the ocean shipping industry have fostered a revolution in the port system. This in turn has caused major changes in the function and use of port in Korea. Aside from this. Mokpo Port, however continues to decline, because the existing port facilities and related subsystem are already obsolete with no chance of regaining operational effectiveness and treatment for proper implementation. Although a few studies have been done on the Mokpo Port, has not been found, any reseach for the analytical approach to the transportation system of it. This paper aims to make an extensive analysis of the physical distribution system in Mokpo Port focusing on the coordination of subsystems such as navigational aids system, quay handling and transfer system, storage system and inland transport system. The base of introduced simulation tool here is the queueing theory. The overall findings are as follows; 1. Among those vessels called at Mokpo Port in 1994, the average size of oceangoing vessels is 4,922.1 G/T, and the domestic is 317.8 G/T. The average arrival interval and service time of the domestic vessels are 6.0 hours and 24.1 hours respectively marking the berth occupation rate over 100%. Those for oceangoing vessels are 34.5 hours, 120.0 hours and 37.2%. In order to maintainin the berth occupation rate to 70% the capacity considering the 1994 of domestic piers must be extended to 145% and oceangoing vessels must be increased to 165% year called. 2. The capacity of approaching channel is enough to handle the total traffic volume. 3. Tugs are sufficiently being provided to handle all ships requiring their services 4. The capacity of storage and inland transportation systems are sufficient to handle the throughput and the yard stroage utilization rate of No.1 $\cdots$ No.5 is 4.5% and No.6 1S 30% of 1993's. 5. The utilization rate of LLc(Level Looping Crane) and PNT(PNeumaTic) are 2.7% and 18.8%, respectively. Practical solution and proposal for improvement of Transportation System in Mokpo Port are as follows; 1. To avoid the congestion in domestic pier introduction of a new port operation system is necessary allowing the domestic vessel to use the oceangoing pier. 2. To establish the port management information system to improve the efficiency of port operation. 3. To build a new storage system for high valued cargos including modernization of the present storage and handling system. 4. To insure the safety of navigation in approaching channel, The Vessel Traffic System including separation scheme is introduced. 5. To interest enormously on public relation to ship owner's association, shippers and consignees by showing that they can save cost and ship turnaround time in order to promote the call to Mokpo Port. At last, to be strategically change the function of Mokpo Port to the Leisure, Fishing & Ferry as well as Maritime port.

  • PDF