• Title/Summary/Keyword: Safety plan

Search Result 2,248, Processing Time 0.026 seconds

Improvement Plan of Implementing Condition Assessment in Process Safety Management (PSM) System (공정안전관리(PSM)제도의 이행상태평가 개선방안)

  • Lee, Joo Yeob;Lee, Keun Won;Ahn, Byung Joon;Kim, Tae-Ok
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.4
    • /
    • pp.27-34
    • /
    • 2016
  • Process Safety Management (PSM) system was introduced since 1996 and it makes voluntarily organizing and managing chemical accident prevention system by company itself that contributes to reduce the chemical accidents. However, large or small scaled chemical accidents had occurred frequently in these days. This trend is brought up the necessity to analyze and improve PSM system. In this study, it was conducted by the questionnaire survey and workshop for prevention of major industrial accidents in PSM sites in order to collect extensive opinions from all walks of life and identify overall operation condition. It was proposed to establish improvement plan of implementing condition assessment in PSM system. By results of the study, company's voluntary safety management will be induced by improved PSM system and management plan and it expects to prevent the major industrial accidents.

Improving Self-control Safety & Management Ability of Construction Contractors (건설업체 자율안전관리 능력제고 방안)

  • Lee, Song;Son, Gi-Sang;Choi, Won-Il;Oh, Tae-Sang;Chae, Jum-Sik
    • Journal of the Korean Society of Safety
    • /
    • v.15 no.4
    • /
    • pp.112-118
    • /
    • 2000
  • This paper is resulted from the research to activate Self-control Safety Management system that adopted to improve an assessment system for Hazard Prevention Plan. And members of company, university and research institute have jointly participated in the research. First, it is investigated that introduced background and processing method with existing practical data & materials references in order to understand what domestic Self-control Safety Management system will be available for. And general construction company at site have their ability to assess Hazard Prevention Plan by mailing questionnaire to on thousand site, visits, and interviews. Also, It is investigated how much they have the assessment ability. It is selected to do a questionnaire survey for the status of self-regulatory safety assessment ability of the designated self-regulatory companies in order to produce and enhance the self-regulatory assessment ability and the necessity of Self-control Safety Management system. Finally, it is selected to do a questionnaire survey for fixing and the enhance Self-control Safety Management system of general construction contractors.

  • PDF

On an Efficient Development of the Test & Evaluation Plan through the insured Traceability of the Safety Requirements (안전 요구사항의 추적성 구현을 통한 시험/평가 계획서의 효율적 개발)

  • Yoon, Jae-Han;Lee, Jae-Chon
    • Journal of the Korea Safety Management & Science
    • /
    • v.9 no.6
    • /
    • pp.89-96
    • /
    • 2007
  • It is well known that the test and evaluation plan (TEP) is very crucial in the successful development of safety-critical systems. As such, this paper discusses an approach to the development of the TEP for a system that should meet safety requirements in the systems development process. It is studied how to incorporate the result of preliminary hazard analysis (PHA) in generating the safety requirements. It is also discussed how to deal with them when the system requirements (i.e., functions, performance, constraints, components, etc) and the safety requirements are integrated into one model. While doing so, we have constructed the required traceability among them, which is necessary and very useful when the safety requirements need to be corrected or be changed. The use of the traceability makes it possible to easily check out whether and how the safety requirements are properly incorporated in the system design process. Furthermore, without the verified traceability, the system cannot be changed or upgraded later. In order to implement the model on a computer-aided tool, we have constructed a database (DB) schema. As a result, the implemented model/DB allows to automatically generate TEP which can be used to measure the performance and safety level of the developed system.

A study on NCS based qualification plan development procedure of industrial safety field - Focused on the industrial safety, industrial health, nondestructive section- (산업안전 분야 NCS기반 자격설계 개발과정에 관한 연구 - 산업안전, 산업보건, 비파괴 분야를 중심으로 -)

  • Yi, Shin-jae;Yang, wook;Yoon, Young-Ju;Choi, Seo-Yeon
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.3
    • /
    • pp.9-14
    • /
    • 2015
  • The study is conducted in order to establish validity of industrial safety field's neo-qualification composition by suggesting reengineering procedure of NCS based industrial safety field's qualifying occupational plan. Industrial safety fields are first classified into great classification which are environment energy safety, and then into sub-classification which are industrial safety management, industrial health management, and nondestructive test. NCS based neo-qualification plan is deveopled into progress as following steps; First, planning NCS neo-qualification system. Second, presenting work education combined program certification standard. Third, developing NCS based neo-qualification assessment standard. Fourth, developing work education qualification prototype problem. The process of qualification plan was composed with Worksheet 14 and with 4phase being completing summary of each section, certification and development of assessment standard, and development of prototype problem. As a result, Industrial safety manager was redesigned into Industrial sfety manager and Construction Safety Manager, and Occupational Health Care Manager was redesigned into Occupational Health Care Manager and Industrial Health Manager. This study, in conclusion, suggests development of qualifying occupation that could be applied to the integrated management system and development of future industrial safety field's specialized neo-qualifying occupation.

A Case Study of Disaster Accidents at Construction Site Based on PDCA Theory

  • Shin, Dong-Won;Kong, Ha-Sung
    • International journal of advanced smart convergence
    • /
    • v.10 no.3
    • /
    • pp.245-256
    • /
    • 2021
  • This study is significant in determining the reduction of safety accidents by applying PDCA's theory by subdividing it into a case analysis technique for construction sites by PDCA's theory. For this study, accidents accounted for the largest proportion of each type of disaster in the construction site were considered, and safety accidents were reduced through the PDCA theory through prior research. The analysis method of this study derived improvement plans by applying PDCA techniques to plan, implement, confirm, review, and improve disaster accidents at construction sites. The conclusions of this study are as follows. In the plan, first of all, measures shall be taken to prepare a safety management plan, to verify the implementation of the plan, and to verify the degree of implementation by the field manager. In the implementation, first of all, it is necessary to introduce a safety education history system to strengthen the safety education curriculum to suit the site, as long-term work is impossible for field workers depending on field conditions. First of all, it is necessary to strengthen the installation of safety facilities, including "work scaffolding" and "conducting prevention facilities" at construction sites. In management review and improvement, the risk assessment system for construction sites needs to be expanded first°.

A Study on the Problems of elementary School Safety and its Improvement in Korea (우리나라 초등학교 학교안전의 문제점 및 개선방향에 관한 연구)

  • Yoon, Yong-Gi
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.13 no.3
    • /
    • pp.1-14
    • /
    • 2014
  • This research aims to orientation for new ways to improve school safety environment composition : The first study was the survey of various literature and status on primary school safety has been established in residential developments in urban areas were investigated and analyzed. This study was constructed as follows : The first chapter of the study is composed with the purpose, contents and configuration of study, definitions of terms, and consists of a limitation of such studies. And in chapter 2, we define such concepts, the range of school safety incidents. In Chapter 3, the nation's school safety situation was investigated, And in the fourth chapter introduced the practice of foreign school safety plan, Chapter 5 was to provide direction for future school safety and accident prevention plan. Including 12 new elementary school in Dongbaek district and Dongtan New-Town 20 new elementary schools in the metropolitan area of New-City were examined for safety issues, such as the environment of school, school zones, school premises form compositions and its outdoor and indoor facilities. This study was aimed at some of the nation's metropolitan New Town Elementary School. Therefore, there is a limit to this generalization. Also planned construction safety plan elements for the indoor facilities are further studies are needed for this hayeoteumeuro excluded. In addition, the architectural planning elements of the school safety needs additional studies is excluded.

Development Plan of Design for Safety in Construction (설계안전성 검토(DfS) 발전방안)

  • Shin, Ju Yeoul
    • Tunnel and Underground Space
    • /
    • v.27 no.6
    • /
    • pp.351-356
    • /
    • 2017
  • This study introduces the current status of the design for safety(DfS) introduced as one of the owner - centered construction site safety management plan, and presents the problems and the improvement plan. The design for safety has been shifting from the construction management-oriented safety management to the owner-centered safety management system, The owner has to make the design considering the safety from the design stage centered on the owner. The owner has to review and approve the adequacy of the safety-conscious design and The risk factors that can not be eliminated during design are the system to prevent the disaster at the construction site by planning to eliminate the risk factor when writing the safety management plan that is made at the construction stage. The design for safety system implemented from May 2016 will be further developed to prevent the risk of safety accidents that may occur in construction sites, contributing greatly to the reduction of construction accident. In addition, it suggests ways to develop more efficient and convenient system through continuous hazard finding and system improvement.

A Study on the Comparison of Landscape Lighting by Using Simulation Approach for Users' Safety in Urban Park (도시공원 야간 이용자 안전을 위한 경관 조명 시뮬레이션 비교 연구)

  • Lee, Jong-Sung
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.1
    • /
    • pp.43-50
    • /
    • 2010
  • The purpose of this study is to propose a simulation approach which compares lighting quality of each luminaire type for small urban park users' safety. For improving illumination quality, lighting intensity distribution of a luminaire is one of the important factors and it is also important to set the luminaire to a proper position. To achieve the best plan for illumination, it is most important to communicate the plan with designers of park and professional engineers in depth and the communication continues from the beginning of the plan.

An Analysis of Cooperation Service Level using Safety Shipment Plan (안전공급계획에 따른 판매지점들의 협조공급수준 분석)

  • Yoon Seung-Chul;Min Ji-Young
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.2
    • /
    • pp.115-128
    • /
    • 2006
  • The study analyzes those relations of customer service level of each sales branch, level of cooperations among branches, and overall system-wide service level for an item. Under the continuous review method, each sales branch places an order to the outside supplier, and the each branch receives the order quantity after elapsing a certain lead time. Under these circumstances, those branches with stockout condition may be supplied by other branches with keeping stocks to cover the shortages. This policy generally increases the system-wide customer service level for an item throughout cooperations for the safety plan among branches. Therefore, in the context of inventory policy, the decision rules to determine the proper branch levels of service and cooperation levels of service are important goals in terms of attaining desired system-wide service level. This research has suggested the method and procedure to reach above goals.

Analysis of the Operation Performance of the Construction Safety System by Using Construction Accident Data (건설공사 사고 데이터(CSI) 활용을 통한 건설안전제도(안전관리계획서)의 운영성과 분석)

  • Kim, Seong-Deok;Cho, A-Yeong;Lee, Jeong-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.383-384
    • /
    • 2023
  • Using the CSI(Construction Safety Management Integrated Information) data, a comparative analysis was conducted by work type and construction cost according to whether the construction sites were subject to making a safety management plan or not. As a result, by type of work, the ratio of deaths in non-plan sites was high in mechanical facilities and earthworks, and the operation performance of the system was much higher in sites that were less than 5 billion won of construction cost.

  • PDF