• Title/Summary/Keyword: Safety of Business Contractors

Search Result 8, Processing Time 0.021 seconds

Improving domestic institutional research through the International Safety Management Practices -Focusing on safety and health management in Japan- (해외 안전보건관리 사례를 통한 국내 제도적 개선연구 -일본의 안전보건관리를 중심으로-)

  • Kim, Jang Won;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.4
    • /
    • pp.77-86
    • /
    • 2015
  • In the industrial accident that occurred in the recent contract type of business or establishment (including subcontractor) employers and contractors who demand among employers, would be liable to have a proper discussion on how to prevent industrial accidents. To resolve this issue, it introduced the discussion with the Japanese legal system, which has a system similar to the Occupational Safety and seeks to help us in our country's future institutional improvements.

The study on improving the regulation for industrial accident rate level assessment of construction companies (건설업 산업재해발생률 산정·평가기준 개선방안 연구)

  • Park, Yong-Kyu
    • Journal of the Korea Safety Management & Science
    • /
    • v.18 no.3
    • /
    • pp.17-24
    • /
    • 2016
  • The regulation for industrial accident rate level assessment of construction companies was introduced to the construction industry in the Republic of Korea since 1993 and has brought positive outcome on industrial accidents reduction at construction work sites. There were considerable decrease of industrial accident ratio and enforcing of contrators' safety organizations from the beginning of the regulation for industrial accident rate level assessment. In spite of these positive outcomes, there were some negative effects such as contractors' shrinking accident reports to keep good accident ratios since these figures had a great impact on pre-qualification stage of bidding when general contractors were competing for new construction projects. In addition, Comprehensive evaluation bid system, which replaces the lowest price bid system is applied to government-ordered construction projects since 2016. Comprehensive evaluation bid system includes construction company's accident rate as one of the evaluation items and carries out with the industrial accident rate level assessment of construction companies at the same time. The regulations of two systems have been called for improvement to unify these different procedures and standards which have led business stakeholders to confusion for several years. This study aims to devote on lessening shrinking accident reports and to reduce the waste of business stakeholders through changing the regulation for industrial accident rate level assessment.

A Study on the Reliability Improvement of Safety Management System in Major Construction Companies - Focused on G Construction Company - (대형건설업체의 안전성 확보를 위한 안전경영시스템의 신뢰도 개선 방안 -G 건설사를 중심으로-)

  • Cho, Jae-Hwan
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.1
    • /
    • pp.101-108
    • /
    • 2013
  • Industrial disaster caused the deaths of 2,114, construction workers among them was the highest of 621 deaths. In the construction industry, has established a number of safety alternatives to prevent accidents. But until now, the cause of the accident has stopped being superficial analysis, awareness on the root cause of the acciden did not reflect. In this study, we analyze the characteristics and causes in G contractors' safety accidents. And innovation strategy, organization-wide safety management system and detailed tasks to derive essentially was to prevent the occurrence of large construction companies. A lot of business for accident prevention effect was transient and formal, to reflect a management style and organizational culture, and try to prevent construction accidents. we will strive to prevent the disaster from the construction site through the improvement of these.

THE IDENTIFICATION OF MALAYSIAN CONTRACTOR SATISFACTION DIMENSIONS: A STRATEGY FOR CONTINUOUS IMPROVEMENT

  • Md Asrul Nasid Masrom;Martin Skitmore;Adrian Bridge
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.335-339
    • /
    • 2011
  • The unique characteristics of the construction industry - such as the fragmentation of its processes, varied scope of works and diversity of its participants - are contributory factors to poor project performance. Several issues are unresolved due to the lack of a comprehensive technique to measure project outcomes including: inefficient decision making, insufficient communication, uncertain site conditions, a continuously changing environment, inharmonious working relationships, mismatched objectives within the project team and a blame culture. One approach to overcoming these problems appears to be to measure performance by gauging contractor satisfaction (Co-S) levels, but this has not been widely investigated as yet. Additionally, the key Co-S dimensions at the project level are still not fully identified. This paper concerns a study of satisfaction dimensions, primarily by a postal questionnaire survey of construction contractors registered by the Malaysian Construction Industry Development Board (CIDB). Eight satisfaction dimensions are identified that are significantly and substantially relate to these contractors - comprising: project cost performance, schedule performance, product performance, design satisfaction, site safety, project profitability, business performance and relationships between participants. -Each of these dimensions is accorded different priority levels of satisfaction by different contractors. The output of this study will be useful in raising the awareness and understanding of project teams regarding contractors' needs, mutual objectives and open communication to help to deliver a successful project.

  • PDF

Safety Management Framework for Information Handover Effectiveness in the Construction Industry (건설 안전관리 개념적 틀 및 정보이양 효율성 분석)

  • JIN, Zhenhui;JUNG, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.4
    • /
    • pp.50-61
    • /
    • 2020
  • Safety management has been one of the most critical issues in the construction industry for a long time. Despite continuous efforts, it still shows a higher accident rate than other sectors. To reduce the accident rate, a lot of studies have been performed, mostly focused on contractors or construction phase. Although the initial stage of the construction project has the most significant impact on construction safety and decision-makers at the initial stage play an important role, the safety management system throughout the project entire life-cycle is still insufficient. In addition, although a great deal of information is generated in the construction project and the value is increasing, while it shows an inefficient aspect. This is believed to be due to insufficient information exchange and a lack of standards. In this context, this study aims to analyze the efficiency of information handover in construction safety. For this purpose, a safety management framework for systematically and efficiently managing and utilizing for construction safety information is referred to as 'safety business functions', 'project life-cycle', and 'industrial hierarchy'. The 'safety business functions' are classified into three levels. And then, in order to analyze the efficiency of safety information handover, 'importance of safety business function' and 'efficiency of safety information handover' were evaluated by interviewing with experts. This study can be used as reference data for implementing systematical and efficient safety management, and can also increase construction safety competency.

FACTOR ANALYSIS ON CONTRACTOR COMPETITION STRATEGY: A HONG KONG STUDY

  • L. Y. Shen;Y. T. Tan;S C Song;M X Yu
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.289-298
    • /
    • 2007
  • The development of construction industry has led to the increase in the number of criteria imposed by project clients for selecting contractors. For example, clients often request tenderers to satisfy various conditions such as tight programme, financial strength, managerial ability, relevant work experiences, technical strength, high workmanship standard, safety requirement, quality specification, and yet others. This trend has attracted research interests of devising various methods for helping project clients to assess contractors' bids. For example, in recent development, the Works Bureau of the Hong Kong Government has introduced two mechanisms in tender evaluation for various public work contracts, namely, the Marking Scheme effective from June 2002 and the Formula Approach effective from November 2002 [1], [2]. These approaches evaluate a contractor's tender by considering collectively its tender price and performance attributes, the latter including contractor experience, past performance, technical resources and technical content of his proposal. The tender with the highest combined price and performance score (CPPS) will be normally recommended for acceptance. It appears, however, that there is little existing research in helping contractors to identify a competition strategy that enables the contractor to offer his most competitive bid collectively taking into account his resource capacities and project client's multiple performance criteria. This paper examines the factors affecting contractor's competition strategy to compete for works in Hong Kong. The understanding about the factors will contribute to identifying effective competition strategy. The data used for the analysis were collected from Hong Kong construction industry. The research findings may provide valuable references for investigating effective competition strategies in other construction industries outside the region.

  • PDF

Effects of the Safety and Health Management System on the Performance of the Enterprise: Focus on the Electric Power Corporation (안전보건경영시스템의 운영방침이 기업성과에 미치는 영향: 전기공사업을 중심으로)

  • Kim, Sang-Sig;Kong, Ha-Sung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.1
    • /
    • pp.135-145
    • /
    • 2020
  • This research is mainly aimed at finding out about the effects of the safety and health management system on corporate performance through systematic operation by efficiently allocating material and human resources within the company by participating all employees and stakeholders in order to prevent and maintain industrial accidents and the optimal working environment, and how to maintain and activate the safety and health management system at the center of electric contractors.The analysis results are as follows. First, management, organizational management and resource preparation will have a positive impact on the management capability of the electric power corporation. It was assessed that the more well-transmitted and understood within the organization, the better the construction plan, the better the equipment management status, the more positively the management capability of electric works was to be achieved. Second, management, organizational management and resource preparation will have a positive impact on corporate management performance.This seems to have a positive effect on a company's business performance when the standards of OHSAS are met with construction plan and construction equipment management are high as related information such as industrial safety and health laws are strengthened and companies' safety and health activities, advanced safety and culture are released to facilitate organizational management.Third, the management ability of the electric power corporation will have a mediated effect on the effect of management, organization management and resource preparation on the performance of the enterprise. This means that the direct effect of the independent variable management organization on corporate management performance is .401 The indirect effect is .168.658 shows that the direct effect of resource preparation on corporate management performance is .423, the indirect effect is .178 and the total effect.It was analyzed at 643.

A Case Study on the Development of New Process for Treatment of Waste Waters from Ships (선박폐수 처리공정의 개발에 관한 사례)

  • Choi, Sang-Mo;Heo, In-Seok;Yang, Seok-Jun
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.15 no.1
    • /
    • pp.71-78
    • /
    • 2009
  • Korea Marine Environment Management Corporation (KOEM) has waste oil facilities in 13 ports to collect and treat waste oil, bilge, etc. from ships based upon the Marine Environment Management Act of Korea and MARPOL 73/78 convention. Those facilities were designed and have been operated simply to discharge water under the level 15 ppm of oil contents. However, bad smells occurred from rotten organic matters in waste water and direct discharge of harmful substances to receiving water caused civil appeals. Therefore, KOEM tried to develop new process for treatment of oily waste water from ships, which could mitigate harmful substances, save cost, calm down civil appeals and contribute to marine environment preservation. This process consists of 3 steps to remove oil contents via gravity variation at first, $O_3$ input to contact water and organism deposition by inputting condensate deposits. Then finally upper water will be discharged, and the deposited substances in the bottom will be compressed through spinning machine to transfer to the designated contractors for treatment of wastes. This is very effective and innovative in that it could reduce 3 or 4 steps compared with existing process and mitigate not only waste oil concentration but also hard resolving materials such as colloid, ABS, phosphorus, nitrogen and bad smells. This method is expected to minimize bad smells and harmful gases, to save more than 10% of maintenance cost, and to arrange the good base for garbage treatment business dealing with waste water and bad smell.

  • PDF