• Title/Summary/Keyword: STAR Procedure

Search Result 38, Processing Time 0.021 seconds

Change of Tibio-Talar Motion After Total Ankle Replacement (족관절 인공관절 치환술 후 족관절 운동범위의 변화)

  • Suh, Jin-Soo;Saltzman, Charles L.
    • Journal of Korean Foot and Ankle Society
    • /
    • v.10 no.1
    • /
    • pp.92-95
    • /
    • 2006
  • Purpose: Ankle fusion that is operated on severe ankle arthritis has its weakness in that normal walking is impossible, even though the result is pretty good. As a alternative choice, total ankle replacement pursues the longer survivorship with material improvement. However, it is not yet known how much range of motion is possible after the replacement, or how it has changed overtime. Therefore, we need an analyzation for that. Materials and Methods: A retrospective review of sixty-seven patients undergoing STAR total ankle replacement at our institution between 1998 and 2002 was conducted. Of those, twenty-six (39%) had complete sets of full dorsiflexion and plantar flexion lateral radiographs both between "immediate" postop and at a minimum of 2-years follow-up and no revision procedure during that time. The mean age of these patients was 63.2 years when the surgery was done; the etiology of arthrosis was 21(81%) post-traumatic/degenerative, 4 rheumatoid and 1 psoriatic. Results: Average "immediate" ankle range of motion was $15.9^{\circ}$, and total foot (non-ankle) motion was $20.6^{\circ}$. At one, two, and three years the average ankle and total foot ranges of motion were $17.4^{\circ}$, $17.6^{\circ}$, $15.6^{\circ}$ and $21.0^{\circ}$, $22.0^{\circ}$, $21.2^{\circ}$ respectively. Statistically there was no significant difference between "immediate" postop motion and one to three years postop (all p>0.05). Conclusion: The range of motion after the STAR total ankle replacement is maintained from the "immediate" postoperative range of motion, but not increased, in the 1-3 year post replacement period.

  • PDF

A Study on the Unstable behavior According to rise-span ratio of dome type space frame (돔형 공간 구조물의 Rise-span 비에 따른 불안정 거동 특성에 관한 연구)

  • Shon, Su-Deok;Kim, Seung-Deog;Kang, Moon-Myung
    • 한국공간정보시스템학회:학술대회논문집
    • /
    • 2004.05a
    • /
    • pp.75-82
    • /
    • 2004
  • Many researcher's efforts have made a significant advancement of space frame structure with various portion, and it becomes the most outsanding one of space structures. However, with the characteristics of thin and long term of spacing, the unstable behavior of space structure is shown by initial imperfection, erection procedure or joint, especially space frame structure represents more. This kind of unstable problem could not be set up clearly and there is a huge difference between theory and experiment. Moreover, the discrete structure such as space frame has more complex solution, this it is not easy to derive the formulation of design about space structure. In this space frame structure, the character of rise-span ratio or load mode is represented by the instability of space frame structure with initial imperfection, and snap-through or bifurcation might be the main phenomenon. Therefore, in this study, space frame structure which has a lot of aesthetic effect and profitable for large space covering single layer is dealt. And because that the unstable behavior due to variation of inner force resistance in the elastic range is very important collapse mechanism, I would like to investigate unstable character as a nonlinear behavior with a geometric nonlinear. In order to study the instability. I derive tangent stiffness matrix using finite element method and with displacement incremental method perform nonlinear analysis of unit space structure, star dome and 3-ring star dome considering rise-span $ratio(\mu}$ and load $ratio(R_L)$ for analyzing unstable phenomenon.

  • PDF

Risk Analysis of Flight Procedures at Incheon International Airport and Gimpo International Airport (인천국제공항과 김포국제공항의 비행 절차 위험도 분석)

  • Lee, Hyeonwoong;Lee, Hak-Tae
    • Journal of Advanced Navigation Technology
    • /
    • v.24 no.6
    • /
    • pp.500-507
    • /
    • 2020
  • This paper presents a risk assessment methodology for standard flight procedures using recorded automatic dependent surveillance-broadcast (ADS-B) data. Utilizing the proposed methodology, the results of risk analyses in RKSI (incheon international airport) and RKSS (gimpo international airport) using trajectories that are regenerated based on 100 days of ADS-B data are presented. For the risk metric, detect and avoid well clear (DWC) is used. With this index, each procedure was evaluated for the sections with highest level of risk. Among the standard instrument departure (SID) of RKSI, the section between SI712 and RANOS of RNAV BOPTA 1L showed the highest level of risk. For the standard terminal arrival route (STAR) of RKSI, section between SI947 and DANAN of RNAV GUKDO 1N wasthe one with the highest level of risk. For RKSS, the segment between SS726 and SS727 of RNAV BULTI 1X and the segment between KAKSO and KALMA of RNAV OLMEN 1D showed the highest level of risk among the SIDs and STARs, respectivly.

A new hybrid optimization algorithm based on path projection

  • Gharebaghi, Saeed Asil;Ardalan Asl, Mohammad
    • Structural Engineering and Mechanics
    • /
    • v.65 no.6
    • /
    • pp.707-719
    • /
    • 2018
  • In this article, a new method is introduced to improve the local search capability of meta-heuristic algorithms using the projection of the path on the border of constraints. In a mathematical point of view, the Gradient Projection Method is applied through a new approach, while the imposed limitations are removed. Accordingly, the gradient vector is replaced with a new meta-heuristic based vector. Besides, the active constraint identification algorithm, and the projection method are changed into less complex approaches. As a result, if a constraint is violated by an agent, a new path will be suggested to correct the direction of the agent's movement. The presented procedure includes three main steps: (1) the identification of the active constraint, (2) the neighboring point determination, and (3) the new direction and step length. Moreover, this method can be applied to some meta-heuristic algorithms. It increases the chance of convergence in the final phase of the search process, especially when the number of the violations of the constraints increases. The method is applied jointly with the authors' newly developed meta-heuristic algorithm, entitled Star Graph. The capability of the resulted hybrid method is examined using the optimal design of truss and frame structures. Eventually, the comparison of the results with other meta-heuristics of the literature shows that the hybrid method is successful in the global as well as local search.

An Analysis of the Polymer Melt Flow in Extruder Dies (고분자압출 다이스의 유동해석)

  • Choi, Man Sung;Kim, Kwang Sun
    • Journal of the Semiconductor & Display Technology
    • /
    • v.12 no.2
    • /
    • pp.19-25
    • /
    • 2013
  • Extrusion is one of the most important operations in the polymer-processing industry. Balancing the distribution of flow through a die to achieve a uniform velocity distribution is the primary objective and one of the most difficult tasks of extrusion die design. If the manifold in a coat-hanger die is not properly designed, the exit velocity distribution may be not uniform; this can affect the thickness across the width of the die. Yet, no procedure is known to optimize the coat hanger die with respect to an even velocity profile at the exit. While optimizing the exit velocity distribution, the constraint optimization used in this work with allowable pressure drop in the die; according to this constraint we can control the pressure in the die. The computational approach incorporates three-dimensional finite element simulations software STAR-CCM+. These simulations are used with numerical optimization to design polymer coat hanger dies with pressure drop, uniform velocity and temperature variation across the die exit.

Application of numerical simulation for the analysis and interpretation of pile-anchor system failure

  • Saleem, Masood
    • Geomechanics and Engineering
    • /
    • v.9 no.6
    • /
    • pp.689-707
    • /
    • 2015
  • Progressive increase in population causing land scarcity, which is forcing construction industry to build multistory buildings having underground basements. Normally, basements are constructed for parking facility. This research work evaluates important factors which have caused the collapse of pile-anchor system at under construction five star hotel. 21 m deep excavation is carried out, to have five basements, after installation of 600 mm diameter cast in-situ contiguous concrete piles at plot periphery. To retain piles and backfill, soil anchors are installed as pit excavation is proceeded. Before collapse, anchors are designed by federal highway administration procedure and four anchor rows are installed with three strands per anchor in first row and four in remaining. However, after collapse, system is modeled and analyzed in plaxis using mohr-coulomb method. It is investigated that in-appropriate evaluation of soil properties, additional surcharge loads, lesser number of strands per anchor, shorter grouted body length and shorter pile embedment depth caused large deformations to occur which governed the collapse of east side pile wall. To resume work, old anchors are assumed to be standing at one factor of safety and then system is analyzed using finite element approach. Finally, it is concluded to use four strands per anchor in first new row and five strands in remaining three with increase in grouted and un-grouted body lengths.

Performance Test of the Boltwood Cloud Sensor for the Meteorological Condition of Optical Satellite Observation (위성 광학관측 가능 기상상태 판단을 위한 Boltwood 구름센서 성능 시험)

  • Bae, Youngho;Yoon, Joh-Na;Jo, Jung Hyun;Moon, Hong-Kyu;Choi, Young-Jun;Yim, Hong-Suh;Park, Youngsik;Park, Sun-Youp;Park, Jang-Hyun;Choi, Jin;Kim, Myung-Jin;Kim, Jihye
    • Journal of Satellite, Information and Communications
    • /
    • v.8 no.3
    • /
    • pp.32-40
    • /
    • 2013
  • The Boltwood Cloud Sensor is meteorological sensor that is used to estimate an amount of clouds in the sky. This sensor will be installed for OWL(Optical Wide-field patroL) telescope and observatory system of Korea Astronomy and Space Science. Before applying this sensor to an observatory system, we performed test observations at Chungbuk University Observatory at Jincheon, Chungbuk. During the test run, a significant correlation between air temperature difference and the number of visible stars recorded in the CCD frames has not been found. This preliminary result can be attributed to test environment of the observation and our lack of knowledge on calculation algorithm as well as the hardware system of the Boltwood Cloud Sensor.In this paper, we present the procedure and the result of the performance test employing the cloud sensor.

A Priority based Dynamic Spectrum Allocation Algorithm for Multiple Network Operators Supporting Multiple Service Classes (다중 서비스 클래스를 제공하는 네트워크 운영자를 위한 우선순위 기반의 동적 스펙트럼 할당 알고리즘)

  • Kim, Hoon;Joo, Yang-Ick;Yun, Sang-Boh;Lee, Yeon-Woo
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.33 no.1A
    • /
    • pp.59-66
    • /
    • 2008
  • This paper presents a spectrum sharing and allocation problem in multiple network operators(NOs). Most of previous works as to dynamic spectrum allocation(DSA) schemes have presented the DSA gain achieved by utilizing the time or regional variations in traffic demand between multi-network operators(NOs). In this paper, we introduce the functionalities required for the entities related with the spectrum sharing and allocation and propose a spectrum allocation algorithm while considering the long-term priority(or fairness) between NOs, the prioritybetween multiple class services, and the urgent bandwidth request. It was shown that the proposed algorithm with priorities between multiple class services could sustain better satisfaction ratio(SR) than the fixed allocation schemes or one without priority under different traffic patterns. Therefore, we conclude that the proposed DSA with priorities between multiple class services and network operators could provide the fairness between service classes of network operators and effective negotiation procedure for urgent bandwidth request by users.