• 제목/요약/키워드: SI project

검색결과 290건 처리시간 0.026초

석탄연소보일러 개조공사에 적용된 저NOx 미분탄 버너의 성능 평가 (Performance Evaluation of Low NOx Pulverized Coal Burner Applied in Coal Fired Boiler Refurbishment Project)

  • 김상현;송시홍;김혁제;김혁필
    • 한국연소학회지
    • /
    • 제11권4호
    • /
    • pp.22-26
    • /
    • 2006
  • To meet the environmental requirements, Doosan Heavy Industries & Construction Co., Ltd. (Doosan) had developed low NOx pulverized coal burner and it was applied to boiler retrofit project, 130 ton/hr coal fired cogeneration boiler, in 2003. NOx emissionand unburned carbon (UBC) in fly ash were measured during the commissioning tests. In this paper, the operation results of low NOx pulverized coal burner installed in 130 ton/hr coal fired boiler are presented. Burners emitted 160 ppm (@6 % $O_2$ basis) NOx and 3 % UBC with Chinacoal containing 0.86 % fuel nitrogen. And also it was shown that NOx emission rate of low NOx pulverized coal burner is linearly increased with fuel-nitrogen fraction of coal.

  • PDF

Antiviral Activity Enhancement through the SATE Prodrug of a 2'-Modified 5'-Norcarbocyclic Adenine Analogue

  • Li, Hua;Kim, Si-Wouk;Hong, Joon-Hee
    • Bulletin of the Korean Chemical Society
    • /
    • 제31권8호
    • /
    • pp.2180-2184
    • /
    • 2010
  • We synthesized and tested the anti-HIV activity of the SATE prodrug of a 2'-methyl 5'-norcarbocyclic adenine analogue. The introduction of a methyl group in the 2'-position was performed by the addition of a carbonyl using isopropenyl magnesium bromide. The adenine base was efficiently coupled using the Mitsunobu reaction. The chemical stability study of the bis(SATE) derivative 18 was measured at neutral (pH 7.2) and slightly acid (milli-Q water, pH 5.5) pH, and compounds 16 and 18 were evaluated as potential anti-HIV-1 agents.

가치중심의 SI (System Integration) 사업 규모 및 비용산정 모형 구축 연구 (A Value-oriented System Integration Project Sizing and Cost Estimation Model)

  • 김현수
    • Asia pacific journal of information systems
    • /
    • 제8권3호
    • /
    • pp.101-118
    • /
    • 1998
  • The purpose of this study is to construct a value-oriented sizing and cost estimation model for system integration projects. In particular, this study is to build a system architecture design and integration cost model, and a network design and implementation cost model. Unlike software development projects, system integration projects include knowledge-intensive professional services on system architecture and network design areas. Because of these work's high invisibility, the cost of these services is hard to estimate and measure. Therefore, we need to develop value-oriented cost models. This study presents 6 value-oriented cost models, and tests statistical significance of these models with real system integration project data. The results show that cost factors on these models are valid, and models are statistically significant. Future work is needed to integrate various cost models and apply the whole model to field projects to increase model's prediction accuracy.

  • PDF

사업위험 분석과 기능점수를 통한 사업원가 산정 및 정보시스템 감리점검모델 연구 (A Study of the Integrated Cost Audit Model for the efficiency of IT project risk management with risk analyzing and using the function point in the IT project risk)

  • 윤승정;한기준;김동수
    • 한국IT서비스학회:학술대회논문집
    • /
    • 한국IT서비스학회 2009년도 추계학술대회
    • /
    • pp.176-180
    • /
    • 2009
  • 현재 우리나라 SI(Service Integration)에서 사업발주자 및 수행자는 소프트웨어사업 대가산정에 많은 어려움을 겪고 있다. 사업발주자는 관례적인 사업비 산정으로 일관하고, 사업수행자는 근거없이 받아들이는 것이 현실이다. 또한 감리 수행 시 사업비산정근거를 점검할 체계를 갖추지 못하고 있다. 이로 인해, 비용관리 위험 및 파생위험들을 초래할 수 있다. 이에, 사업비 산정과 위험에 대한 구체적인 인식과 연구가 필요하다.

  • PDF

돌관공사 시나리오 기반 공정관리 최적화 방안 (Process Optimization Method Based on Emergency Construction Work Scenario)

  • 이시현;이승학;우미선;손재호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.117-118
    • /
    • 2015
  • These days buildings have more possibilities to occur construction delay as many variables and risks are inherent in them due to the enlargement and complexity. When a project is delayed, it generates extra working expenses and this causes a dispute between the employer and the constructor. Most construction sites conduct emergency construction work to recover the delay of the project duration. When an emergency construction is carried out in the actual construction site, it's necessary to utilize and distribute the proper working groups based on the procedure of successor and predecessor. Many constructions, however, have been going only with more number of work forces and working time. This study suggests a process management optimization plan with an application of emergency construction scenario by using linear programing.

  • PDF

해상 전자전체계 조우 HILS 연구 (A Research on Naval Electronic Warfare System Engagement HILS Technology)

  • 신동조;이정훈;류시찬
    • 한국군사과학기술학회지
    • /
    • 제13권5호
    • /
    • pp.785-792
    • /
    • 2010
  • This paper on the Research of Naval Electronic Warfare System HILS(Hardware In the Loop System) describes the EW engagement HILS construction method for evaluation of the operational concept analysis on active RF Decoy in staying in the air and the deceit ability to anti-ship missile seeker. We obtain the EW M&S technology of EW engagement HILS and EW efficiency analysis from this project. This Naval Electronic Warfare System HILS technology will support Active Decoy Development Project and any other HILS of EW weapon in KOREA ARMY/NAVY/AIR FORCE.

AN ANALYSIS ON FACTORS AFFECTING SCHEDULE PERFORMANCE OF PUBLIC HOUSING PROJECTS: CASE OF SINGAPORE

  • Bon-Gang Hwang;Xianbo Zhao;Si Yi Ng
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.412-418
    • /
    • 2013
  • With the increasing demand for public housing, the Singapore government decided to reduce the waiting time of future public housing owners, which requires these projects to be completed on time. As a result, this study aims to identify the frequent and impactful factors affecting schedule performance of public housing projects in Singapore. The survey conducted with 36 industry experts revealed that "site management", "coordination among various parties", "design changes by owner during construction", "availability of laborers on site", "availability of material", and "availability of staff to manage projects" were the six factors that should be emphasized to assure the schedule performance of public housing projects. In addition, there was statistically significant agreement between public housing projects and other building projects on both the frequency and impact ranks of the factors. The findings from this study will help practitioners involving public housing projects to take measures to assure the achievement of project schedule objectives.

  • PDF

소득 및 후생 변화를 통한 농지범용화 시범사업의 경제적 효과 분석 (An Analysis of the Economic Effects of the Pilot Project for Multiple-Purpose Utilization of Paddy Fields Focusing on Income and Welfare Changes)

  • 임채환;하용현;김도훈;안동환;이향미;김관수
    • 농촌계획
    • /
    • 제28권2호
    • /
    • pp.71-85
    • /
    • 2022
  • The food self-sufficiency rate of agricultural products in Korea, excluding rice, is around 20%, and the government is promoting various policies including a Multiple-Purpose Utilization of Paddy Fields project, to increase the self-sufficiency rate of major grains. The project for Multiple-Purpose Utilization of Paddy Fields is being promoted as a part of a program to create farmland infrastructure to facilitate the cultivation of crops other than rice in rice paddies, and pilot projects were started in four regions in 2020. The purpose of this study is to analyze the economic effects of the pilot project for Multiple-Purpose Utilization of Paddy Fields, and to propose policies to increase the effectiveness of the project. In order to analyze the economic effect, we estimated the change in farm income generated by switching from rice to other crops, and measured the effect of welfare change using the Equilibrium Displacement Model (EDM). As a result of the analysis, social welfare is expected to increase when the pilot project for Multiple-Purpose Utilization of Paddy Fields is implemented, and the income of the beneficiary farmers is also expected to improve compared to that of single-cropping when double-cropping is implemented. However, it was found that the economic feasibility of the project differs depending on the crops converted. Juksan-myeon, Gimje-si, which is an area where soybean production was successful, was analyzed from the viewpoint of increasing the economic feasibility of the pilot project. Their success factors were analyzed into four major factors: infrastructure, farming methods, education, and collaboration with local agricultural organizations. If such a success story can be utilized in the future project implementation process, it can contribute to the improvement of farm household income and national economic welfare.

SM 조직의 Effort Estimation 프로세스 개선을 통한 업무 Load Balancing 방안 연구 (Improved Effort Estimation Process for Work Load Balancing in SM Project.)

  • 김석용
    • 한국정보처리학회:학술대회논문집
    • /
    • 한국정보처리학회 2005년도 추계학술발표대회 및 정기총회
    • /
    • pp.397-400
    • /
    • 2005
  • SM 프로젝트는 SI 프로젝트와 달리 고객의 요청 사항(CSR)이 있을 때 마다 개발 계획을 세우고 관리를 하여야 하며 동시에 고객의 개발 요청 내용 외에도 운영업무에 대한 계획도 같이 세워 져야 한다. 하지만 대부분의 SM 프로젝트에서는 한 두 사람의 경험이나 판단으로 계획이 작성, 할당되며 운영업무에 대한 계획의 정확도도 떨어져 업무 load balancing 이 잘 되지 않는다. 본 논문에서는 이러한 문제 해결을 위해 효과적인 SM 프로젝트에서의 EFFROT ESTIMATION 프로세스를 제안하여 업무 load balancing 을 이루는 방안을 제시하고자 한다.

  • PDF

고속철도건설사업의 사회적 갈등에 관한 사례 연구 (A Case Study on Social Conflicts Of high speed Rail Construction Projects)

  • 추준섭;오주환;김시곤
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.2442-2447
    • /
    • 2008
  • Concept of conflict management system and necessity of introducing it into the executing process of public projects have been subjects of any previous studies. Those systems are, however, not practically applicable to rail projects given the unique nature of rail industry. In this context, the author presented cases of conflicts emerged during the process of the Gyung bu High Speed Rail Construction Project and mapped out realistic case study applicable to construction sites.

  • PDF