• Title/Summary/Keyword: SI project

Search Result 290, Processing Time 0.027 seconds

High Loading for Air Pollution in the Byunsan Peninsula of Korea by an Interplay of the Saemangeum Project and Winter Monsoon

  • Ma, Chang-Jin;Kang, Gong-Unn;Kim, Ki-Hyun
    • Asian Journal of Atmospheric Environment
    • /
    • v.6 no.3
    • /
    • pp.234-243
    • /
    • 2012
  • The wintertime high loading for atmospheric pollutants is certainly expected in the Byunsan Peninsula of Korea because of a great-scale reclamation project having construction of 33 km tidal sea dike impounding an area of over 40,000 ha and long-range transport. The goal of this study is to trace the origin of this wintertime burden for ambient particulate matter (hereafter called "PM") in the Byunsan Peninsula of Korea. The size-segregated (i.e., cutoff size from 0.01 ${\mu}m$ to 4.7 ${\mu}m$) PM sampling was conducted at a ground-based site of Byunsan Peninsula located in the west coast of Korean Peninsula during the height of dike constructing. Data archived in this study are the mass concentrations of ionic, elemental, and carbonic components in size-fractioned PM. The elemental mass of individual submicrometer particles was also analyzed. The sum of 5-source (i.e., elemental carbon, organic materials, inorganic secondary pollutants, crustal matter, and sea-salts) concentrations shows the bimodal distribution (major and minor peaks formed around $D_p$, 0.65 ${\mu}m$ and $D_p$, 4.7 ${\mu}m$, respectively) by border with 0.19 ${\mu}m$ of cutoff size. The concentrations of EC in $PM_{1.1-0.01}$ in winter and spring times were 4.62 ${\mu}g\;m^{-3}$ and 3.74 ${\mu}g\;m^{-3}$, respectively. Elemental masses of submicron individual particles are classified into two groups, i.e., the major elements (Cl, Al, Si, S, and P) and the minor trace elements. Cluster analysis differentiated the elements in submicron individual particles into 4-cluster. Among them, three clusters are in agreement with the major (Al, Si, S, and P), minor (Fe, Ca, and K), and trace compositions of coal burning. Meanwhile, Cl classified as an independent cluster has different source profile which was mainly due to the Saemangeum seawall project. Some highly toxic elements (e.g., Cr, Mn, and As (and/or Pb)) were also detected in some part of submicron individual PM. As a consequence, the combination of the Saemangeum project and winter monsoon played a considerable part in the double aggravation of wintertime air pollution in the Byunsan Peninsular.

Development of X-ray Image Processing Technology for Nondestructive Measurement of the Coating Thickness in the Simulated TRISO-coated Fuel Particle (모의 TRISO 핵연료입자 코팅층 두께 비파괴 측정을 위한 X-선 영상처리기술 개발)

  • Kim Woong-Ki;Lee Young-Woo;Park Ji-Yeon;Ra Sung-Woong
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2006.05a
    • /
    • pp.669-672
    • /
    • 2006
  • 고온가스냉각 원자로에서는 고온 안정성 및 핵분열생성물 차단 성능이 우수한 TRISO(tri-tsotropic) 핵연료를 사용하고 있다. TRISO 핵연료 입자는 직경이 약 1 mm인 구 형태로 입자의 중심에는 직경 $0.5{\mu}m$의 핵연료 커널(kernel)이 포함되며 커널 외곽을 코팅 층이 에워싸고 있다. 이 코팅 층은 완충(buffer) PyC(pyrolytic carbon) 층, 내부 PyC 층, SiC 층, 그리고 외부 PyC 층으로 구성되어 있다. 각 코팅 층의 두께는 수십${\sim}$${\mu}m$ 범위이며, 본 연구에서는 각 코팅 층의 두께를 비파괴적으로 측정하기 위하여 마이크로포커스 X-선 발생장치와 고해상도 X-선 평판(flat panel) 검출기로 구성된 정밀한 X-선 래디오그래피 장치를 구성하고, $UO_2$ 핵물질 대신에 $ZrO_2$를 커널로 사용한 모의 TRISO 핵연료 입자에 대한 래디오그래피 영상을 획득한 후 디지털 영상처리기술을 이용하여 코팅 층 사이의 경계선이 구분 가능하도록 영상을 개선하고 디지털 영상처리 알고리즘을 개발하여 코팅 층의 두께를 측정하였다.

  • PDF

Development of Evaluation Methodology on the Performance of BTL Sewer Rehabilitation Projects (하수관거정비 BTL사업의 효과분석 및 방안 수립 연구)

  • Song, Ho-Myeon;Cho, Jeong-Il;Ahn, Choong-Hee
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.24 no.6
    • /
    • pp.743-751
    • /
    • 2010
  • It requires an interim performance assessment for BTL business of the sewerage rehabilitation which continues from 2005 till now. Means, It is necessary to make an interim performance assessment and an analysis of an business effect of the sewerage rehabilitation BTL projects which still continues, and we presented an improvement method of the new sewerage rehabilitation project in future. This paper has conducted an analysis of the business effect for 3 local government BTL projects which are completed and under operation as of now in Jincheon-Gun, Cheongju-Si and Gangjin-Gun. As a method of business effect analysis, we conducted a business effect of the 3 places using the index set which we previously set for the business effect analysis. The index set in this research was sectionalized to an improvement effect of operating wastewater treatment plant, an benefit effect of the direct cost, an benefit effect of the indirect cost and an environment friendly effect. We, in this paper, conducted an business effect analysis for 3 sewerage rehabilitation BTL projects which are completed or under operation recently as a demonstration, however we judge that an business effect analysis shall be conducted in a stage that a significant time for operation has passed since the completion of the construction in order to induce an actual business effect of the sewerage rehabilitation BTL project.

A Study on Criteria for investment Priority of Railway Project (철도건설 투자우선순위에 관한 연구)

  • Park, Il-Ha;Park, Yong-Gul;Kim, Si-Gon
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.112-116
    • /
    • 2008
  • Determining the investment priority of the railway project is essential to keep its object of railway investment. [National railway construction plan] provide 4 major evaluation indicators and their weighting range in determining the investment priority of railway construction. Which are investment efficiency, inter-regional balance of development, network effects, government supporting policy. However this present criteria has inconsistency in determining economical feasibility of the railway transportation when applying the same evaluation indicator, investment efficiency, with the road transportation. The railway transportation is superior to road transportation in terms of transportation capacity and distance, while offering less carbon emissions. In spite of the prominent position of the railway transportation, it can be failed to obtain its proper investment priority when being determined under economical feasibility based. Therefore, this study analyzed the inconsistency under present evaluation criteria and proposed new evaluation method for the investment priority of the railway construction using AHP(analytic hierarchy process), while differentiate from the road construction. This method is optimized for only determining the priority of the railway construction itself under object of railway investment respectively.

  • PDF

An Economic Feasibility Analysis of Custom Work Service - Case of Bonghwang-myeon, Naju City - (농작업 대행사업 경제성 분석 - 나주시 봉황면 사례를 중심으로 -)

  • Lee, Jeong-Min;Shin, Seung-Yeoub
    • Journal of Agricultural Extension & Community Development
    • /
    • v.28 no.4
    • /
    • pp.167-174
    • /
    • 2021
  • This study analyzed the feasibility of custom work service to deal with the imbalance of farm labor supply due to population aging. The economic feasibility analysis is based on the case of Bonghwang-myeon in Naju-si, where the majority of farm work is entrusted to local agricultural cooperative. To assess the project profitability and economic feasibility based on the projected cash flow for the next ten years, Return On Investment (ROI), Net Present Value (NPV), and Internal Rate of Return (IRR) of the projects were calculated. The results showed that ROI is estimated at 13.7%, and NPV and IRR are KRW 1,504,932,000 and 15.6%, respectively, with a discount rate of 4.5%, indicating a good enough profitability. Furthermore, a sensitivity analysis with government support as part of an assumption showed that without the support, NPV turns negative, implying that the project is not profitable, and that government support for at least 30% of the cost is needed to secure the economic feasibility of a project. Hence, to promote agricultural work entrustment, it is necessary for the government to partly support the agricultural machinery and facility costs, which require a considerable amount of initial investment.

A Study on the Direction of Projects Based on Climate Change Response Policies Using the Green New Deal Policies and the Smart Green City Project as Examples (기후변화 대응 정책에 기반한 사업의 추진 방향성에 관한 연구 -그린 뉴딜 정책 중 스마트 그린도시 사업을 사례로-)

  • Ji-Hui Yoon;Sung-Jin Yeom
    • Journal of Environmental Science International
    • /
    • v.31 no.12
    • /
    • pp.1089-1102
    • /
    • 2022
  • Recently, urbanization has become a serious issue, as there is imbalance between regions and various environmental problems occur intensively in cities. Therefore, cities all over the world are promoting the Green New Deal and trying to realize carbon neutrality. Accordingly, the European Union is leading the creation of carbon-neutral cities by promoting policies aimed at rapidly realizing carbon neutrality. In Korea, projects such as U-City and Smart City have also been promoted continuously for many years, and recently, the projects Smart Green City and Carbon Neutral Green City have been introduced. Therefore, this study aimed to derive directions and implications for future projects based on policies to address climate change by analyzing the guidelines for the Smart Green City project and the project plans of Gimhae-si and Gangjin-gun, which are the leading projects in the Smart Green City business model and are equipped with an extensive budget.

Development of an Approximate Cost Estimating Framework for River Facility Construction at Planning Stage (하천시설물 공사의 기획단계 개략공사비 산정체계 개발)

  • Shin, Jung Min;Woo, Sungkwon;Lee, Si Wook;Kim, Ok Ki
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.371-381
    • /
    • 2008
  • The systematic methodology for estimating construction cost approximately at planning and pre-design phase of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. This research suggests a 4-level cost information structure and identifies critical factors affecting construction cost as a result of thorough analysis of accumulated historical cost data of river facility construction projects. Also, this research presents the framework of the approximate cost estimating methodology for river facility construction project a planning stage.

A Framework for Computer Vision-aided Construction Safety Monitoring Using Collaborative 4D BIM

  • Tran, Si Van-Tien;Bao, Quy Lan;Nguyen, Truong Linh;Park, Chansik
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1202-1208
    • /
    • 2022
  • Techniques based on computer vision are becoming increasingly important in construction safety monitoring. Using AI algorithms can automatically identify conceivable hazards and give feedback to stakeholders. However, the construction site remains various potential hazard situations during the project. Due to the site complexity, many visual devices simultaneously participate in the monitoring process. Therefore, it challenges developing and operating corresponding AI detection algorithms. Safety information resulting from computer vision needs to organize before delivering it to safety managers. This study proposes a framework for computer vision-aided construction safety monitoring using collaborative 4D BIM information to address this issue, called CSM4D. The suggested framework consists of two-module: (1) collaborative BIM information extraction module (CBIE) extracts the spatial-temporal information and potential hazard scenario of a specific activity; through that, Computer Vision-aid Safety Monitoring Module (CVSM) can apply accurate algorithms at the right workplace during the project. The proposed framework is expected to aid safety monitoring using computer vision and 4D BIM.

  • PDF

A Case Study on the Successful ERP implementation of A Medium-sized Company-Oracle ERP in Standard Telecom Co. (중소기업의 성공적인 ERP 구축 사례연구-STC의 오라클 ERP)

  • Jang, Si-Young
    • Korean Management Science Review
    • /
    • v.15 no.2
    • /
    • pp.71-81
    • /
    • 1998
  • ERP is a new concept which attempts to combine the applications of BRP and information technology in order to enhance the competitive positions of the firms in a rapidly changing environment. It is expected that a paradigm transition will take place which transforms the current practice of in-house development into the introduction of ERP packages. In response to this trend. ERP introduction strategies need to be investigated. This paper reports the case study of Standard Telecom Co. in successfully implementing Oracle ERP applications package. It describes the background, implementation strategy, project management, benefits, and the critical success factors of the Vanguard Project.

  • PDF

Analysis of Project management Areas for the Success of Public SI Projects (공공정보화사업의 성공적 수행을 위한 사업관리영역별 비교·분석 연구)

  • Hong, SunYoung;Lee, SeoukJoo
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2017.04a
    • /
    • pp.717-720
    • /
    • 2017
  • 공공정보화사업의 사업관리방안은 국가 및 공공기관의 정보화사업 담당자들이 실무에서 직접적으로 활용하는 구체적이고 명확한 기준이다. 이는 공공정보화 사업의 계획, 구축, 운영 등 각 단계별 추진시 반영되고 있고 실제 구축환경에서 프로젝트 성공을 위해 중요한 요소로 작용하고 있다. 하지만 사업관리방안만으로 SW프로젝트의 성공은 보장받기 어렵다. 본 논문은 이러한 문제점을 파악하기 위해 각 사업관리방안이 SW프로젝트의 성공을 지원할 수 있는가를 연구하였고, 이를 위해 프로젝트관리 국제표준인 ISO 21500(Guidance on Project Management)의 지식 및 관리 영역과 산출물 등을 주요 사업관리방안을 비교하였다.