The Transactions of The Korean Institute of Electrical Engineers
/
v.65
no.3
/
pp.382-387
/
2016
This paper deals with the assessment of voltage sags regarding the variation of system operating conditions. In general, voltage sag assessment is performed by assuming the constant operating condition throughout the year. However, the assumption can lead to assessment errors in case of considerable changes of system operation condition. This paper presents a method to estimate ESF(expected sag frequency) considering the operating conditions according to the changes of power demand throughout the year.
The recent growth in the use of impactive and nonlinear loads, electronic devices sensitive to power quality has caused many power quality problems. Dynamic voltage restorers(DVR) are known as the best effective and economic means to compensate for power quality problems(especially, voltage sag and swell). In this paper, we addresses the detecting algorithms of an voltage sag and phase for operating DVR. Experimental results are included to illustrate the efficacy of the proposed algorithm.
Kim, Min-Gi;Noh, Yong-Su;Kim, Jun-Gu;Jung, Yong-Chae;Won, Chun-Yuen
Proceedings of the KIPE Conference
/
2013.07a
/
pp.471-472
/
2013
When ESS(Energy Storage System) is under normal operation, island situation can be occur because of grid accidents. When island operation occur, the system mode switches in to UPS(Uninterruptible Power Supply) mode to supply stabled load power. To decide island operation, checking grid magnitude or frequency is general. But regulation for sag and swell is required. In this paper, it proposes grid connection error detection algorithm for UPS operation when sag and swell occurs in grid, and analyzed by simulation.
Recently, the concern of power qualiaty problem is increasing. Especially, Voltage quality problem have been increased important problem. Electronic device was affected by voltage sag. So, sensitive load that included many electronic Device was affected by voltage sag. also, it may have economic loss. In this paper, we argue the coordination scheme considering the loss of sensitive load. The coordination device of distribution system for instaneous fault is recloser and sectionalizer, But, the fault clearing time of recloser is more than 2 seconds. So, voltage sag generates long time that affected sensitive load. HS(high speed switchgear) has fast fault clearing time(0.015s) that not affected sensitive load. Therefore, the coordination applied HS is used. The proposed schemes are proved and evaluated by a case study using PSCAD/EMTDC simulation.
In this paper, It was evaluated that the customer's effects of momentary voltage sag in power distribution system considering reclosing interval. Above all, power quality problems were discussed widely, various international standards about power quality were compared to each other. after the continuous voltage sag waves of power distribution system on fault were induced, the experimentation about voltage sag for critical load was performed using source simulator. The results of experimentation were displayed as the form of 2 and 3-dimensional CBEMA Curve.
Kim, J.W.;Lee, K.S.;Byun, W.Y.;Nho, E.C.;Kim, I.D.;Chun, T.W.;Kim, H.G.
Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
/
2004.05a
/
pp.514-517
/
2004
This paper describes a new 3 phase Sag-Swell generator for the test of custom power devices such as UPS, DVR, DSTATCOM, SSTS, etc. The proposed scheme has good features of simple structure, high reliability wide range of sag and swell variation, It can also generate voltage outage. The control scheme for the generation is simple. The operation principle of the proposed scheme is described and verified through simulations.
Park, In-Deok;Jeong, Sung-Won;Gim, Jae-Hyeon;Lee, Geun-Joon
Proceedings of the KIPE Conference
/
2007.07a
/
pp.95-97
/
2007
This paper studies on operating limit curve of low voltage electric machinery with respect to source voltage variation or sag. Also, it discusses electric machine and compensation equipment design methodology based on voltage quality effect assessment technology. Voltage quality standards, such as SEMI47, CBEMA, ITIC curve are regarded to examine the relation between time constants of load and sagging time of sag generator, the load(low voltage electric machinery) study. Voltage sag characteristics of loads, time constant and sag relation voltage-time operating limits are tested and verified.
본 논문에서는 직접 전력변환방식의 단상 sag/swell 보상기를 구현하였다. 제안된 보상기는 정현파 입력/ 출력 필터, 직렬연결 변압기와 dc 링크 커패시터부가 없는 단상 back-to-back PWM컨버터로 구성되어 있다. 이 보상기의 장점은 dc-link 진해 커패시터가 제거되어 전력회로부가 간단하게 구현되어 향상된 신뢰성 및 내구성을 확인 할 수 있으며 동시에 단상 전압 sag/swell을 보상하며 스위칭 손실을 줄이는 간단한 PWM 방법을 들 수 있다. 더구나, 제안된 방법은 일반적인 직접 전력변환방식에서 요구되어지는 복잡한 4-step 전류 방법이 필요 없는 간단한 전류제어방법을 채용할 수 있는 구조이며 제안된 보상기의 구조와 PWM 방법의 타당성을 프로토타입 하드웨어를 제작하여 실험결과로 보상기의 우수성을 확인하였다.
Kim, Byung-Geol;Kim, Shang-Shu;Jun, Wan-Gi;Han, Se-Won;Kim, Jin-Han
Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
/
2007.11a
/
pp.516-517
/
2007
Because forest fire can give a serious damage to overhead conductors, the thorough understanding about sag behavior of burned conductor is very important in maintaining the transmission line safely. Therefore, a systematic investigation was carried out by heating method. As the heating temperature increases, drastic change of tensile strength of Al wire due to the softening of Al wire occurred. When Al wire is exposed to the flame(about $800^{\circ}C$) during only 13 seconds, the remained tensile strength of Al wire showed under 90%. and then sag of overhead conductor become deteriorated. The detailed results will be given in the text.
Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
/
2007.06a
/
pp.521-522
/
2007
A new high strength conductor was designed for long span transmission line with a high nitrogen steel having high tensile strength and non-magnetic properties and high strength AI alloy. The tensile strength of conductor is very important to reduce the sag. The height of electric tower depend on the sag also. More than 36% less of sag was achieved by using ACHR(Aluminum conductor stranded high-nitrogen steel reinforced) instead of conventional ACSR.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.