• Title/Summary/Keyword: Running cost

Search Result 387, Processing Time 0.021 seconds

A Case Study on the Improvement Plan for Cost Prediction of Educational BTL Project based on Running Cost Analysis (교육시설 BTL사업의 유지관리비용 비교분석을 통한 비용추정 개선방안에 관한 사례연구)

  • Park, Moon-Sun;Song, Chang-Youg;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.139-149
    • /
    • 2007
  • The purpose of this study is to examine the problem of BTL(Build Transfer Lease) projects through comparative analysis on running costs, focusing on primary school, junior and senior high school education facilities, and then to provide useful information on the estimation of running costs by suggesting valid cost criteria. For this, eight schools from A and B consulting firms were sampled from capital region and other areas. Sampled schools were classified into four categories according to school grade, and running cost data are collected and analyzed from relative view points. The results of this study are as follows: 1) running costs which are analyzed by categories show some difference among sub-items, 2) major problems related to running cost prediction of BTL projects are revealed and improvement schemes are suggested for two groups (Owner and Project applicants).

Solving Facility Rearrangement Problem Using a Genetic Algorithm and a Heuristic Local Search

  • Suzuki, Atsushi;Yamamoto, Hisashi
    • Industrial Engineering and Management Systems
    • /
    • v.11 no.2
    • /
    • pp.170-175
    • /
    • 2012
  • In this paper, a procedure using a genetic algorithm (GA) and a heuristic local search (HLS) is proposed for solving facility rearrangement problem (FRP). FRP is a decision problem for stopping/running of facilities and integration of stopped facilities to running facilities to maximize the production capacity of running facilities under the cost constraint. FRP is formulated as an integer programming model for maximizing the total production capacity under the constraint of the total facility operating cost. In the cases of 90 percent of cost constraint and more than 20 facilities, the previous solving method was not effective. To find effective alternatives, this solving procedure using a GA and a HLS is developed. Stopping/running of facilities are searched by GA. The shifting the production operation of stopped facilities into running facilities is searched by HLS, and this local search is executed for one individual in this GA procedure. The effectiveness of the proposed procedure using a GA and HLS is demonstrated by numerical experiment.

Design Study of 3 Segment Leg with Stable Region at low and high Speed Running (저속 및 고속주행에서 안정영역을 갖는 3 Segment Leg 설계 연구)

  • Kwon, Oh-Seok;Lee, Dong-Ha
    • The Journal of Korea Robotics Society
    • /
    • v.6 no.3
    • /
    • pp.230-236
    • /
    • 2011
  • In previous researches, the self-stability was studied for the spring-mass model and the two segment leg model. In these researches, it was presented that the spring-mass model has the self-stable region at relatively high speed running and the two segment leg model has the self-stable region at relatively low speed running. If the model was run in the self-stable region, the cost of transport is zero ideally. That is, actually, only the energy loss is needed to compensate for running. This means that the energy efficiency is high, running in the self-stable region. We want to have high energy efficiency at low and high speed running. So, in this paper, we propose the design direction of the three segment leg having the self-stable region at low and high speed running. And we prove the self-stable region of the three segment leg designed by the proposed design direction.

Feasibility study on waste heat utilization system in subway (지하철배열 이용 시스템의 경제성 평가)

  • Lee, Chul-Goo;Kim, Jong-Dae;Im, Tae-Soon;Pang, Seun-Gki;Ham, Heung-Don
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.7 no.1
    • /
    • pp.59-64
    • /
    • 2011
  • Feasibility study on energy saving system by utilizing exhausted heat from subway, which is one of the unused energy, was carried out. General heat source system using absorption chiller-heater was used for comparing to the energy saving system, and payback period method using initial cost and running cost of two systems, was used to perform economic estimation. Payback period was about ten years, and this period might be shortened if nation's economic support enact.

A Cost-aware Scheduling for Reservation-Based Long Running Transactions (예약기반 장기수행 변동처리를위한 비용인지 시간계획)

  • Lin, Qing;Pham, Phuoc Hung;Byun, Jeong Yong
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2011.11a
    • /
    • pp.1248-1251
    • /
    • 2011
  • Web Service technologies make the automation of business activities that are distributed across multiple enterprises possible. Existing extended transaction protocols typically resort to compensation actions to regain atomicity and consistency. A reservation-based transaction protocol is proposed to reduce high compensation risk. However, for a serial long running transaction processing, the resource that is reserved in the early stage may be released due to resource holding time expires. Therefore, our analysis theoretically illustrates a scheduling scheme that tries to prevent the loss of resource holding as well as gain an optimized execution plan with minimum compensation cost. In order to estimate cost of different schedules, we set up a costing model and cost metric to quantize compensation risk.

Wheel flange Wear Reduction of Rolling Stock (철도차량의 차륜마모 저감)

  • 허현무;이찬우
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.143-150
    • /
    • 2000
  • Like conventional railways, improving running performance of vehicle in curve is more effective than improving maximum speed to reduce traveling time. But some vehicles have problems concerning running performance in cure because of insufficient study for our conventional railway characteristics. So, these problems brought about increasement of maintenance cost. This study was started to deliberate several plans to solve problems concerning running performance in curve. Some modifications of primary suspension and tests were carried out to improve curve negotiation. Here, we describe some results.

  • PDF

Optimal Electric Energy Subscription Policy for Multiple Plants with Uncertain Demand

  • Nilrangsee, Puvarin;Bohez, Erik L.J.
    • Industrial Engineering and Management Systems
    • /
    • v.6 no.2
    • /
    • pp.106-118
    • /
    • 2007
  • This paper present a new optimization model to generate aggregate production planning by considering electric cost. The new Time Of Switching (TOS) electric type is introduced by switching over Time Of Day (TOD) and Time Of Use (TOU) electric types to minimize the electric cost. The fuzzy demand and Dynamic inventory tracking with multiple plant capacity are modeled to cover the uncertain demand of customer. The constraint for minimum hour limitation of plant running per one start up event is introduced to minimize plants idle time. Furthermore; the Optimal Weight Moving Average Factor for customer demand forecasting is introduced by monthly factors to reduce forecasting error. Application is illustrated for multiple cement mill plants. The mathematical model was formulated in spreadsheet format. Then the spreadsheet-solver technique was used as a tool to solve the model. A simulation running on part of the system in a test for six months shows the optimal solution could save 60% of the actual cost.

A Study on the Increase Profit of Korean Kitchen in Hotel -In center of menu and food cost control - (호텔 한식주방의 메뉴ㆍ원가관리에 관한 연구)

  • 이보순
    • Culinary science and hospitality research
    • /
    • v.5 no.2
    • /
    • pp.237-257
    • /
    • 1999
  • Food & beverage part of nowadays hotel is steadily going up with the improvement of tourism industry and with the raise of income of the people, but some of the hotel kitchen has unchanged problem of low commercial profit and can't make improvement, so there are many kitchen problems. Especially, for the administrators of the hotels are avoiding from Korean kitchen with their cause that it makes lower profit than the other kitchen style. So, they are avoiding Korean kitchen itself, or showing minimized running. But, Korean kitchen should take off from its ways of being an assistant role or necessary evil as the part of income, by finding ways to make appropriate profit and ways to fulfill the variant desires of guests by running systematized and reasonable menu and Food cost control. This study is to suggest efficient management ways for the raise of profit and satisfaction of the guests by finding ways by analyzing the present situation of the menu and Food cost control of Korean kitchen by understanding these problems.

  • PDF

Financing Mechanisms of Social Prescribing Projects: A Systematic Review

  • Dronina, Yuliya;Ndombi, Grace Ossak;Kim, Ji Eon;Nam, Eun Woo
    • Health Policy and Management
    • /
    • v.30 no.4
    • /
    • pp.513-521
    • /
    • 2020
  • Aging populations and the increasing mental health issues among them have set a new challenge for the international community, governments, and people. Given this, society's role is very important, and involving the local community in resolving the problems can play a pivotal role. The current study presented the systematic review of the financing mechanism and cost-effectiveness of the "social prescribing" (SP) project in the United Kingdom and how SP can be adapted for other settings. The data showed comparatively low running costs and the overall effectiveness of SP projects. The running cost of SP projects varied between £54,525 and £1.1 million. The cost-effectiveness of the projects reported as 12% and the return of investment was about 50% depending on the type of analysis and the activities implemented. This type of intervention can be one of the options that support solving the issues of aging populations and their accompanying mental disorders.

Economic Evaluation on Energy System Using River Water (하천수 이용 열원시스템의 경제성 평가)

  • Lee, Chulgoo;Kim, Jongdae;Im, Taesoon;Choi, Myungsik;Pang, Seungki;Ham, Heungdon
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.9 no.2
    • /
    • pp.25-31
    • /
    • 2013
  • It has become very important for unused energy to be used for building air conditioning. Economic evaluation on energy system by using river water as a heat source, which is one of the unused energy, was carried out. The floor area of the building and the distance between heat source equipment and river was assumed $50,000m^2$ and 200 m. General heat source system using absorption chiller-heater was used for comparing to the energy saving system, and payback period method using initial cost and running cost of two systems, was used to perform economic evaluation. According to development of high capacity of water source heat pump which is appropriate for using river water, initial cost for the system has been reduced. Payback period was about 3.2 years, and this period might be shortened if nation's economic support enact.