• 제목/요약/키워드: Rolling Planning

검색결과 54건 처리시간 0.023초

Order Promising Rolling Planning with ATP/CTP Reallocation Mechanism

  • Chen, Juin-Han;Lin, James T.;Wu, Yi-Sheng
    • Industrial Engineering and Management Systems
    • /
    • 제7권1호
    • /
    • pp.57-65
    • /
    • 2008
  • Available-to-promise (ATP) exhibiting availability of manufacturing resources can be used to support customer order promising. Recently, one advanced function called Capable-to-promise (CTP) is provided by several modern APS (advanced planning system) that checks available capacity for placing new production orders or increasing already scheduled production orders. At the customer enquiry stage while considering the order delivery date and quantity to quote, both ATP and CTP are allocated to support order promising. In particular, current trends of mass customization and multi-side production chain derive several new constraints that should be considered when ATP/CTP allocation planning for order promising - such as customer's preference plants or material vendors, material compatibility, etc. Moreover, ATP/CTP allocation planning would be executed over a rolling time horizon. To utilize capacity and material manufacturing resource flexibly and fulfill more customer orders, ATP/CTP rolling planning should possess resource reallocation mechanism under the constraints of order quantities and delivery dates for all previous order promising. Therefore, to enhance order promising with reliability and flexibility to reallocate manufacturing resource, the ATP/CTP reallocation planning mechanism is needed in order to reallocate material and capacity resource for fulfilling all previous promised and new customer orders beneficially with considering new derived material and capacity constraints.

Rolling Horizon 환경하에서 다단계 재고 모형의 분배계획 수립에 관한 연구 (Distribution Planning in a Multi-Echelon Inventory Model under Rolling Horizon Environment)

  • 안재성;권익현;김성식
    • 산업공학
    • /
    • 제16권4호
    • /
    • pp.441-449
    • /
    • 2003
  • In this paper we propose a distribution planning method aiming the use in the real-life situations. The assumed form of the distribution network is arborescence. At every node in the distribution network, orders are placed periodically. At each renewal of planning horizon, demand informations of periods in the horizon are updated. The objective of the problem is to minimize the total cost, which is the sum of holding and backorder costs of all sites during planning horizon. For such a situation, this study addressed an effective distribution plan when demands for demand-sites are provided for a given planning horizon.

A THEORETICAL MODEL FOR OPTIMIZATION OF ROLLING SCHEDULE PROCEDURE PARAMETERS IN ERP SYSTEMS

  • Bai, Xue;Cao, Qidong;Davis, Steve
    • Journal of applied mathematics & informatics
    • /
    • 제12권1_2호
    • /
    • pp.233-241
    • /
    • 2003
  • The rolling schedule procedure has been an important part of the Enterprise Resource Planning (ERP) systems. The performance of production planning in an ERP system depends on the selection of the three parameters in rolling schedule procedure: frozen interval, replanning interval, and planning horizon (forecast window). This research investigated, in a theoretical approach, the combined impact of selections of those three parameters. The proven mathematical theorems provided guidance to re-duction of instability (nervousness) and to seek the optimal balance between stability and responsiveness of ERP systems. Further the theorems are extended to incorporate the cost structure.

스텝 붙이 활주형 모터보트 선미부가물의 횡요저감효과에 관한 연구 (A Study on the Anti-rolling Effect of Stem Sub-body in the Stepped-Hull Planing Boat)

  • 강병윤;박충환
    • 한국해양공학회지
    • /
    • 제22권4호
    • /
    • pp.84-89
    • /
    • 2008
  • It is hard to find experimental data for a model test of small high-speed planning boats. It is difficult to verify the performance seen in a model test for a high-speed boat because the ship-model scale-ratio is very small and the flow velocity of the circulating water channel and the X-carriage speed of the towing tank are restricted. Therefore most hull-form designs for high-speed small boats depend on the sea-trial test result for similar boats or evaluation through numerical calculations. This study investigated the anti-rolling effect of the stern sub-body in a 50-knot doss planning boat. To carry out this work, new model test procedures were set up in the actual sea. Using this method, the anti-rolling effect of the stern sub-body was investigated. A stern sub-body attached to a planning boat was proved to be effective in reducing the roll and pitch angle.

철도 차량의 반복시간과 소요량 사이의 관계 고찰 (Study on Relationship between Turn-back Time and Assignment of Trainsets)

  • 기형서;오석문;박동주
    • 한국철도학회논문집
    • /
    • 제19권6호
    • /
    • pp.802-814
    • /
    • 2016
  • 본 논문은 철도차량의 운영상 반복시간과 차량소요량 사이의 관계를 고찰한다. 철도차량의 운영상 반복시간은 물리적 회차시간과 대기시간으로 구별되며, 본 논문은 이 가운데 운영상 반복시간의 산정모형과 산정 결과에 대한 다양한 고찰을 제시한다. 제시된 운영상 반복시간의 산정모형을 활용하면 터미날 정거장에서의 운영상 반복시간을 최소화 할 수 있도록 설정할 수 있다. 또한 차량소요량이 감소되는 운영상 반복시간 설정조건을 제시한다. 현실적인 데이터를 활용하여 운영상 반복시간 설정조건에 따라 차량소요량이 감소하는 사례와 분석결과를 제시한다. 본 논문에서 제시하는 방법은 기존 철도운영기관의 차량소요량을 최소화 하는 열차운영계획 및 차량운용계획 수립에 활용이 가능할 것으로 기대된다.

유전알고리즘을 이용한 토사운반 최적경로 탐색 방법론 (Methodology for Selecting Optimal Earthmoving Haul-Routes using Genetic Algorithm)

  • 곽한성;이창용;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.4-5
    • /
    • 2014
  • Planning earthmoving haul-route must be preceded for appropriate equipment fleet assignment. However, traditional haul-route planning methods have limitations relative to practical usage because multiple variables (e.g., grade/rolling resistance, length, equipment's weight etc.) should be considered at a time. Genetic algorithm(GA) was introduced to improve these traditional methods. However, GA based haul-route planning method still remains in inefficiency relative to computation performance. This study presents a new haul-route searching method that computes an optimal haul-route using GA. The system prototype is developed by using MATLAB(ver. 2008b). The system identifies an optimal haul-route by considering equipment type, soil type, and soil condition.

  • PDF

공공교통 전동차 안전운행을 위한 RIMS 프로젝트 적용의 성공요인 연구 (A Study on the Successful Factors in the Application of RIMS Project for the Safe Operation of Rolling Stocks in the Public Transportation)

  • 이강원;방연근;손영진
    • 한국철도학회논문집
    • /
    • 제9권5호
    • /
    • pp.555-560
    • /
    • 2006
  • This study finds out and suggests success factors for the application of RIMS project through the case study of Seoul Metro and literature survey. The successful application of RIMS needs expert knowledge and concept of BOM, standardization of maintenance planning, check lists of heavy maintenance inspection, organization structure of rolling stock maintenance offices, material management system of warehousing and the process of parts repairing between offices, connection of material ordering system, problem solving of circular spare parts administration among inspection, maintenance, and material organizational units, systemic serial number management of parts with RFID, daily closing diary connected with work process chart, and sufficient period of RIMS's test run. RIMS contributes to real time management of rolling stock maintenance, transparency of management, reliability of train operation, customer satisfaction, and management innovation.

Rolling Forecasting 기반의 경영계획시스템 설계와 구현 (Design and Implementation of Management Planning System based on Rolling Forecasting)

  • 신의재;김진우
    • 한국정보처리학회:학술대회논문집
    • /
    • 한국정보처리학회 2006년도 춘계학술발표대회
    • /
    • pp.517-520
    • /
    • 2006
  • 기업내부의 최적화를 위하여 도입 된 ERP 는 급변하는 경영환경을 반영하여 전략적 수단으로 기능하는데 까지 발전하여 왔으며, 현재에는 다른 시스템이나 경영 도구들과의 연계성이 더욱 강조되고 있다. 특히 확장된 ERP 의한 영역인 SEM(Strategic Enterprise Management)은 각 기업들이 성과평가와 시나리오 경영 등 최신 경영도구들의 본격적인 도입으로 각광받고 있으며, 경영계획 및 시뮬레이션(BPS : Business Planning & simulation), 경영 통합 및 소싱(BCS : Business Consolidation & Sourcing), 기업실적 모니터(CPM : Corporate Performance Monitor), 이해당사자 관계관리(SRM : Stakeholder Relationship Management) 등의 세부 시스템으로 구성된다. 특히 경영계획 시스템은 개선된 경영계획 프로세스 모델과 시뮬레이션을 바탕으로 구현될 수 있으며, 본 논문에서는 경영계획 프로세스 모델을 바탕으로 이를 시스템화 하기 위한 경영계획 시뮬레이션 시스템 아키텍처와 User Interface를 제안하였다.

  • PDF

연동계획과 확장된 기억 세포를 이용한 재고 및 경로 문제의 복제선택해법 (A Clonal Selection Algorithm using the Rolling Planning and an Extended Memory Cell for the Inventory Routing Problem)

  • 양병학
    • 경영과학
    • /
    • 제26권1호
    • /
    • pp.171-182
    • /
    • 2009
  • We consider the inventory replenishment problem and the vehicle routing problem simultaneously in the vending machine operation. This problem is known as the inventory routing problem. We design a memory cell in the clonal selection algorithm. The memory cell store the best solution of previous solved problem and use an initial solution for next problem. In general, the other clonal selection algorithm used memory cell for reserving the best solution in current problem. Experiments are performed for testing efficiency of the memory cell in demand uncertainty. Experiment result shows that the solution quality of our algorithm is similar to general clonal selection algorithm and the calculations time is reduced by 20% when the demand uncertainty is less than 30%.

실 해상모형시험을 이용한 선미 보조동체 장착 Stepped hull 선형의 횡동요 및 저항특성 비교 연구 (A Study on the Comparison of the Rolling and Resistance Performance for the Stepped-Hull with attached a Stern-body by using Sea Model-Test)

  • 조효제;손경호;박충환
    • 한국항해항만학회지
    • /
    • 제31권10호
    • /
    • pp.813-818
    • /
    • 2007
  • 선박의 선형시험설비로는 회류수조, 예인수조 등이 있으나, 소형 고속선박은 실선 대응 모형선의 축적비가 대형선에 비해 매우 작고 수조의 유속과 예인전차의 속도제한으로 고속선의 설계선속까지의 성능검증에는 한계로 작용하였다. 이에, 고속 활주형선의 선형시험 검증을 위해 실 해상모형시험기법을 정립하였다. 한편, 고속 Stepped Hull선형은 일체형 활주형 선저선형에 비하여 고속 주행시 공기공급에 따른 접수면 감소로 인하여 저항감소에 따른 속도향상과 연비절감 효과가 있으나, 선미 좌우측의 접수면 감소에 따른 횡동요 안정성이 감소되는 경향이 있다. 이에, 본 논문에서는 고속 선형시험이 가능한 해상모형시험을 이용하여 선미 보조동체 장착 유무에 따른 고속 Stepped Hull 선형의 횡동요 및 저항특성을 비교, 분석한 것이다.