• Title/Summary/Keyword: Rock site

Search Result 904, Processing Time 0.028 seconds

Analysis on Scale Effects to Hydraulic Conductivities in Crystalline Rock (결정질암체의 수리전도도에 대한 규모종속에 관한 분석)

  • 박동극
    • The Journal of Engineering Geology
    • /
    • v.4 no.1
    • /
    • pp.13-28
    • /
    • 1994
  • Hydrogeologic characteristics of crystalline rock including discontinuities is defined by the hydraulic data from the in situ test and by analytical method. Methodology and procedure of the in situ test are used in accordance with test purpose, site condition and characteristics of host rock Hydraulic conductivities in crystalline rock including discontinuifies such as fractured zone and joint, are defined by packer test and slug test. The results indicate Hvorslev' s theory of ground water flow in NX borehole, that the shorter of test interval is, the higher hydraulic conductivity is. This is an indicafion of the fact that the hydraulic rneasured were governed by scale effect of test interval, even at same borehole. According to the result of packer tests in two boreholes, it is understood that hydraulic conductivifies show variations according to the effect of as order of tests. In the comparison of hydraulic conductivifies from both of open borehole tests, the results are relatively well correrated in values. The hydraulic conductivity in the test intervals induding hydrogeologically significant discontinuity shows relatively higher value of hydraulic conductivity in vertical distribution of full depth.

  • PDF

A Case Study of Site Investigation and Ground Stability Analysis for Diagnosis of Subsidence Occurrence in Limestone Mine (석회석 광산 지역의 지반침하 원인 규명을 위한 현장조사와 지반 안정성 분석 사례)

  • Lee, Seung-Joong;Kim, Byung-Ryeol;Choi, Sung-Oong;Oh, Seok-Hoon
    • Tunnel and Underground Space
    • /
    • v.25 no.4
    • /
    • pp.332-340
    • /
    • 2015
  • Ground subsidence occurring in mine area can cause an enormous damage of loss of lives and properties, and a systematic survey should be conducted a series of field investigation and ground stability analysis in subsidence area. This study describes the results from field investigation and ground stability analysis in a limestone mine located in Cheongwon-gun, Chungcheongbuk-do, Korea. Rock mechanical measurements and electrical resistivity surveys are applied to obtain the characteristics of in-situ rock masses and the distribution patterns of subsurface weak zone, and their results are extrapolated in numerical analysis. From the field investigation and stability analysis, it is concluded that the subsidence occurrence in this limestone mine is caused mainly by subsurface limestone cavities.

Distribution of Metallic Elements Contamination in River Deposits and Farmland in the Vicinity of an Abandoned Korean Mine (폐광산 인근 농경지 및 하천 퇴적토의 중금속 오염 특성)

  • Lee, Hwan;Lee, Yoonjin
    • Economic and Environmental Geology
    • /
    • v.53 no.2
    • /
    • pp.133-145
    • /
    • 2020
  • Soil in mine waste-rock fields, and at the pithead, sediments and farmlands around an abandoned mine in the Chungcheong Province of South Korea were investigated to assess the distribution of metallic elements and to understand the scope of the pollution. Reddening was observed from the mine up to a distance of 61 m. Losses of waste rock around the mine were assessed over a section of 1800 ㎥. Yellowish precipitates on the bottom of a stream were identified as ferrihydrite and goethite. For anions, a mean sulfate ion level over 773.6 mg/L was found during August in the river water samples. Mine drainage at the site was shown to have a pH of 4.9 and a sulfate concentration of 1557.8 mg/L during the August rainy season. A possible cause of the metallic element contamination in the mine is waste-rock loss, because mine waste-rock is located on the slope in this area. In conclusion, the total soil area to be treated, based on the amount that exceeded the recommended Korean soil pollution levels, was assessed to be 10,297 ㎡.

Characteristics of the Fracture Distribution on the Granitic Rock by DC and VLF-EM Survey in the Northern Part of Yusong (유성북부 화강암지역에서 전기비저항탐사와 극저주파 전자탐사를 이용한 단열분포 특성)

  • 조성현;김천수;송무영
    • The Journal of Engineering Geology
    • /
    • v.9 no.1
    • /
    • pp.45-57
    • /
    • 1999
  • Groundwater flow in rock mass is controlled by the fractures developed in the area. So, the conductive fractures are very important for groundwater flow in crystalline rock. This study aims to find out the characteristics of the fracture distributed in granitic rock in the northern part of the Yusong area (latitude $36^{\circ}24'18"~36^{\circ}25'08",{\;}longitude{\;}127^{\circ}21'00"~127^{\circ}23'23"$). The electric and EM surveys were carried out in the site to delineate the fracture the fracture zones. Since geophysical survey provides non-unique solution, hydraulic data and dilling log data including BHTV scanning were used as complementary data to achieve the objective of this study. Electric survey(DC) arrays used are schlumberger and dipole-dipole arrays. VLF is used for EM survey. The main charcteristics of the fracture developed in the study aera are that fractures associated with basic dyke cut corss the main fracture zone in NNW and play an important role as hydraulic barrier. In trun, groundwater table in the upstream area is lower than that downstream area.

  • PDF

A study on the interpretations of tunnel convergence function parameters (터널 내공 변위 거동 분석에 관한 연구)

  • Kim, Chang-Yang;Hong, Sung-Wan;Kim, Kwang-Yeom;Baek, Seung-Han
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.6 no.3
    • /
    • pp.183-197
    • /
    • 2004
  • The introduction of geodetic methods of absolute displacement monitoring in tunnels has significantly improved the value of the measurements. Structurally controlled behavior and influences of an anisotropic rock mass can be determined, and the excavation and support adjusted accordingly. Three-dimensional finite element simulations of different weakness zone properties, thicknesses, and orientations relative to the tunnel axis were carried out and the function parameters were evaluated from the results. The results were compared to monitoring results from Alpine tunnels in heterogeneous rock. The good qualitative correlation between trends observed on site and numerical results gives hope that by a routine determination of the function parameters during excavation the prediction of rock mass conditions ahead of the tunnel face can be improved. Implementing the rules developed from experience and simulations into the monitoring data evaluation program allows to automatically issuing information on the expected rock mass quality ahead of the tunnel.

  • PDF

Determination of the coefficient of variation of parameters for the reliability design of shield tunnel segment lining (쉴드 터널 세그먼트 라이닝의 신뢰성 설계를 위한 변수의 변동계수 결정)

  • Byun, Yoseph;Kim, Do;Lee, Seongwon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.6
    • /
    • pp.875-885
    • /
    • 2019
  • This paper is aimed to suggest the coefficient of variation of the total load on the segment lining and the coefficient of variation of earth pressure in reliability based design of shield tunnel. For this purpose, the statistical characteristics of weathered soil and weathered rock were calculated by analyzing the site survey data of the domestic urban section. The coefficient of variation could be estimated by applying these values to Terzaghi's theory using MCS technique. As a result, the coefficient of variation of rock load for weathered soil and weathered rock was 0.08~0.14. The coefficient of variation for the total load acting on the tunnel was LC1 = 0.38, LC2 = 0.33, and LC3 = 0.37. The proposed coefficients of variation can be used in the reliability-based design of shield tunnel segments.

Report on the Annual Reproductive Cycle and Imposex Phenomenon of the Rock-Shell, Thais clavigera in Jeju Port (제주항 내에 서식하는 신복족류 Thais clavigera의 연중 생식주기 및 임포섹스 현상에 관한연구)

  • Yang, Hyun-Sung;Kim, Bong-Kyu;Park, Heung-Sik;Choi, Kwang-Sik
    • The Korean Journal of Malacology
    • /
    • v.26 no.1
    • /
    • pp.97-105
    • /
    • 2010
  • Annual gonad development of the rock shell, Thais clavigera distributed in Jeju Port was investigated over a 12 month period from March 1998 to February 1999. Monthly change in gonad development was examined using histology. Gametogenesis of T. clavigera in the study area initiated as early as in October and fully ripe eggs could be observed from May to July. Percent gonad area (PGA) also increased rapidly from May to July then dropped in August when the water temperature remained $22.6-24.5^{\circ}C$, suggesting that rock shell released their eggs during this period. All female rock shell collected during the course of study exhibited pseudo-penis in the head, indicating that a certain level of imposex had progressed in the study site. Relative penis size index (RPSI), an indicator of level of imposex phenomenon varied 59.5-173.4% and this value was relatively higher than the index reported from elsewhere. It was believed that such imposex phenomenon observed in T. clavigera was caused by endocrine disruption by chemical contaminants such as TBTs released from biocidal paints in the port environment.

Physical and Chemical Characteristics of Pinkish Granite Core in the Mungyeong Area (문경지역 담홍색 화강암 코아의 물리적 및 화학적 특성)

  • 윤현수
    • The Journal of the Petrological Society of Korea
    • /
    • v.3 no.3
    • /
    • pp.234-240
    • /
    • 1994
  • The Wongyeong site, one of massive pinkish granite quarries in the Mungyeong area, was drilled to study the physical and chemical properties following the rock classification from fresh rock to highly, moderately and slightly weathered one. The physical properties such as specific gravity, absorption ratio, porosity and compressive strength were tested from the core samples. Specific gravity and absorption ratio are 2.37-2.64 and 0.27-1.87% respectively, while porosity and compressive strength are 0.70-4.38% and 110- 1, 695 kg/$cm^2$. With increased weathering, absorption ratio vs. porosity shows a positive correlation. The absorption ratio is in reverse proportion to compressive strength. Toward the surface in the drilled core, the $SiO_2$, CaO and $K_2O$ contents slightly decrease, but the $Al_2O_3$+FeO(t) contents increase by the enrichment of residual clay in the weathered rock.

  • PDF

Analysis of oscillatory responses of slug tests in a crystalline rock aquifer (암반대수층 내 순간충격시험 시 관찰된 요동반응의 해석)

  • Ryu, I.;Ji, S.H.;Koh, Y.
    • Tunnel and Underground Space
    • /
    • v.19 no.4
    • /
    • pp.348-354
    • /
    • 2009
  • Slug test is a common characterization method that estimates aquifer hydraulic conductivity rapidly and economically. To characterize the hydraulic property near the borehole YS-4 in the Korea Atomic Energy Research Institute (KAERI) site, slug tests were performed, and oscillatory hydraulic responses were observed. We analyzed the observations with the modified Hvorslev and Bouwer&Rice methods considering the casing inertia, and then the results were compared with those from the general Hvorslev and Bouwer&Rice methods. The estimated hydraulic conductivities from the modified methods are ranged from $4.85{\times}10^{-6}$ to $5.44{\times}10^{-6}$ m/sec, but those from the general ones are ranged from $3.10{\times}10^{-6}$ to $3.63{\times}10^{-5}$ m/s, which shows that the oscillatory responses should be analyzed with consideration of the flowing water inertia effect.

Relations between Initial Displacement Rate and Final Displacement of Arch Settlement and Convergence of a Shallow Tunnel (저심도 터널의 천단침하 및 내공변위의 초기변위속도와 최종변위의 관계)

  • Kim, Cheehwan
    • Tunnel and Underground Space
    • /
    • v.23 no.2
    • /
    • pp.110-119
    • /
    • 2013
  • It is generalized to measure the arch settlement and convergence during tunnel construction for monitoring its mechanical stability. The initial convergence rate a day is defined from the first convergence measurement and the final convergence defined as the convergence measured lastly. The initial and the final tunnel arch settlement are defined like the preceding convergence. In the study, the relations between the initial and final displacements of a shallow tunnel are analyzed. The measurements were performed in the tunnel of subway 906 construction site in Seoul. The overburden is 10-20 m and the tunnel goes through weathered soil/rock. The width and height of the tunnel are about 11.5 m, 10m, respectively. So this is a shallow tunnel in weak rock. The length of tunnel is about 1,820 m and the tunnel was constructed in 2 stages, dividing upper and lower half. The numbers of measurement locations of arch settlement and convergence are 184 and 258, respectively. As a result, the initial displacement rate and the final displacement are comparatively larger in the section of weathered soil.