• Title/Summary/Keyword: Rock bolts

Search Result 69, Processing Time 0.029 seconds

A study on the development and field application of SP-Rockbolt with high-strength steel pipe (고강도 강관을 적용한 SP-록볼트 개발 및 현장 적용을 위한 연구)

  • Shin, Hyunkang;Jung, Hyuksang;Ahn, DongWook
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.4
    • /
    • pp.651-668
    • /
    • 2017
  • For initial stability of the tunnel, the primary support, Shotcrete and rockbolt shall be placed in the most appropriate time. This is because the role of such support plays a vital role in long-term and short-term tunnel stability. In this study, the rock bolt is an important supporting system that receives the external pressure generated by the stress relaxation during tunnel excavation as axial force and transmits it to the shotcrete on the tunnel excavation surface. Until now, most of the materials of rock bolts have been used in the field, but there have been many problems such as uncertain quality of Chinese materials entering the market, poor packing due to falling down of rock bolts when filled with mortar, and corrosion due to water. Therefore, in this study, we have developed a high strength steel pipe rock bolt using Autobeam material to solve and improve various problems of existing rock bolts. In order to evaluate the performance of the developed bolt, field tests were carried out and the existing mortar filler in order to improve the performance of the rock bolt, the design and construction criteria were studied and the results were included in this paper.

Permanent Support for Tunnels using NMT

  • Barton, Nick
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 1995.03a
    • /
    • pp.1-26
    • /
    • 1995
  • Key aspects of the Norwegian Method of Tunnelling (NMT) are reviewed. These include a predictive method of support design using the six-parameter Q-system of rock mass characterisation. The rock mass rating or Q-value is updated during tunnel driving. The designed tunnel support generally consists of wet process, steel fibre reinforced shotcrete combined with fully grouted, untensioned rock bolts, Even in poor rock conditions S(fr) + B usually acts as the final rock reinforcement and tunnel lining. Since it is a drained lining, it is very economic compared to cast concrete with membranes. Light, free-standing steel liners are used to prevent water affecting the runnel environment. Rock mass conditions, and hence lining design and cost estimation can be assessed by careful use of seismic surveys. Relationships between the P-wave velocity, the rock mass deformation modulus and the Q-value have recently been established, where tunnel depth, rock porosity and the uniaxial compression strength of the rock are important variables. The rock mass modulus estimate, and simple index testing of the joints, provide the key input which joints are discretely represented (either in two dimensions with the UDEC code or in three dimensions with the 3DEC code) is generally favoured compared to continuum analysis. The latter may give a misleading impression of uniformity and deformations tend to be understimated. Q-system NMT designs of S(fr) + B (fibre reinforced shotcrete and bolting) are numerically checked and adjustments made to bolt capacities and shotcrete thickness if overloading is evident around the modelled profile.

  • PDF

A Numerical Study on the Reinforcement Method of a Pillar Using Tension Bolts at the Connecting Part between 2-Arch Tunnels and Parallel Tunnels (2-Arch 터널과 병렬 터널 접속부에서의 텐션볼트를 사용한 필라 보강 방법에 대한 수치해석)

  • Park, Yeon-Jun;Choi, Jae-Jin
    • Tunnel and Underground Space
    • /
    • v.25 no.5
    • /
    • pp.470-486
    • /
    • 2015
  • Two-arch tunnels require minimal spacing between the 2 tunnels and thus occupy small amount of land compared to parallel tunnels. But it is rather expensive. The parallel tunnel is not as expensive, but it requires more land than 2-arch tunnels. This may cause a problem when there is a land shortage. The new design is to connect these two types of tunnels by another pair of parallel tunnels where the separation distance is gradually increasing. The applicability of this new design to the cases where rock condition is not even fair has to be verified since the width of the pillar between the connecting tunnels can be quite narrow. Therefore both two and three dimensional numerical analyses were conducted and pillar stability was examined for rock classes IV and V in two different ways. Results showed that this new design is still effective for poor rock conditions if central pillar is properly reinforced by tension bolts as long as overburden is less than five times of the tunnel diameter.

Model Test Study on the Reinforcing Effect of Inclined System Bolting (경사볼트의 보강효과에 대한 모형시험 연구)

  • Lee, Jea-Dug;Kim, Byoung-Il;Piao, Ming-Shan;Yoo, Wan-Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5C
    • /
    • pp.231-238
    • /
    • 2012
  • The rockbolt functions as a main support, which restricts enlargement of the plasticity area and increases stability in the original ground around tunnels, and prevents a second deformation of an excavated surface by supplementing vulnerability arising from opening of the excavated surface. System bolting is generally applied if ground conditions are bad. System bolting is generally installed perpendicular to the excavation direction in every span. If a place is narrow, or it is difficult to insert bolts due to construction conditions, it may be connected and used with short bolts, or installed obliquely. In this study, laboratory model tests were performed to analyze the effect of the ground being reinforced by inclined bolts, based on a bending theory that assumes that the reinforced ground is a simple beam. In all test cases, deflections and vertical earth pressures induced by overburden soil pressure were measured. Total of 99 model tests were carried out, by changing the installation angle of bolts, lateral and longitudinal distance of bolts, and soil height. The model test results indicated that when the installation angle of bolts was less than $75^{\circ}$, deflections of model beams tended to increase rapidly. Also, the relaxed load that was calculated by earth pressure was rapidly increased when the installation angle of bolts was less than $75^{\circ}$. However, the optimum installation angle of inclined bolts was judged to be in the range of $90^{\circ}{\sim}75^{\circ}$. Also, as might be expected, the reinforcement effect of bolts was increased when the longitudinal and lateral distance of bolts was decreased.

Damage Conditions of the Slope Structures due to ARD (산성암반배수에 의한 사면구조물의 피해 현황)

  • Park, Sam-Gyu;Kim, Jae-Gon;Lee, Jin-Soo;Kim, Tong-Kwon;Ko, Kyung-Seok;Lee, Gyoo-Ho
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.878-883
    • /
    • 2005
  • This paper describes the effect of acid rock drainage(ARD) produced from the cut slope on the slope structures. Acid rock drainage is originated from a rock quarry located in coal mine zone and mineralization belt of Chosen Supergroup and Ogcheon group, andesite with the pyrite, and acid sulfate soils of Tertiary in Korea. The cut slope, where acid rock drainage comes out, almost has been constructed by shotcrete and planting works. According to the field observation results, in most cases, the acid rock drainage has an adverse effect on slope structures. The shotcrete, anchors and rock bolts produced corrosive action, and bad germination and growth diseases of covering plants of the slope planting construction due to ARD.

  • PDF

Integrity evaluation of rock bolt grouting using ultrasonic transmission technique (초음파 투과법을 이용한 록볼트 그라우팅의 건전도 평가)

  • Han, Shin-In;Lee, Jong-Sub;Lee, Yong-Jun;Nam, Seok-Woo;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.9 no.1
    • /
    • pp.75-82
    • /
    • 2007
  • As one of the main support systems, rock bolts play a crucial role in the reinforcement of tunnels. Numerical and experimental studies using a transmission method of ultrasonic guided waves are performed to evaluate the integrity of rock bolts encapsulated by grouting paste. Numerical simulations using "DISPERSE" are carried out for the selection of the optimal experimental setup, i.e. non-destructive testing (NDT) system of the rock bolt. Based on results of the numerical simulation, the calculated frequency range for NDT testing is between 20kHz and 70kHz with the first longitudinal L(1) mode. Laboratory transmission tests are performed by attaching the piezo electric sensor at the tip of the rock bolt before embedding. Both of analytical and experimental results show that the amplitude of signals as well as the wave velocity increases with increase in the defect ratio of grouting paste. The defect in grouting paste means that the space around the rock bolt is not fully filled with the grouting paste. Experimental results also show that the increase of the wave velocity is more sensitive to the defect ratio increase than that of the amplitude. This study demonstrates that the transmission technique of ultrasonic guided waves may be a valuable tool in the evaluation of the rock bolt integrity.

  • PDF

A Study on the Problem and Improvement Plan of Pull Test Method and Test Result Judgment of Rock Bolts Usage for Tunnel Construction (터널 공사용 록볼트의 인발 시험 방법 및 시험 결과 판정시의 문제점과 개선방안에 관한 연구)

  • Jang, Suk-Jae
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.9 no.4
    • /
    • pp.135-140
    • /
    • 2005
  • In case of rock bolt useable by tunnel reinforcement methods at field is applied problem of typical rock bolt pull test diagram method propositional in documents and is not thesis of clearness analysis basis about result of rock bolt pull test. So this paper suggested in consideration of foreign basis and field condition that the first, "suggestion of apposite diagram method at tight ground and difference application of rock bolt pull test method at loose and tight ground" and the second, "thesis of estimation basis non-thesis of design and specification, test etc".

Evaluation of an applicability of lattice girders for the tunnel support (터널지보재로서 격자지보(Lattice Girder)의 현장적용성 평가 연구)

  • 문홍득;이성원;배규진
    • Tunnel and Underground Space
    • /
    • v.6 no.2
    • /
    • pp.122-130
    • /
    • 1996
  • Generally the NATM technique uses shotcrete, rock bolts, H-beam steel ribs, and concrete lining for the tunnel support in Korea. Among them, H-beam steel ribs are extremely heavy and difficult for workers to handle. Therefore, especially in Europe, lattice girders are being used instead of H-beam steel ribs for tunnel support. Lattice girders have basically the same function as H-beam steel ribs in tunnelling. The main advantages of using lattice girders compared to H-beam steel rib supports are as follows: 1) lattice girders have relatively a low weight enough to be easily lifted and installed by labors and 2) they create a more effective bond with the shotcrete. The purpose of this study is to evaluate the effectiveness and applicability of lattice girders compared to H-beam steel ribs used in construction tunnel sites and to show that lattice girders can be adequately applied in domestic tunnel construction sites as a new tunnel support system.

  • PDF

Soft Sedimentary Rock Slopes Design of Diversion Tunnel

  • Jee, Warren Wangryul
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2007.10a
    • /
    • pp.63-79
    • /
    • 2007
  • Several remedial works were attempted to stabilize the collapsed area of the inlet slopes of diversion tunnel, but prevention of any further movement was being only carried out at beginning stage by filling the area with aggregates and rock debris, after several cracks had been initiated and developed around the area. The extra specialty developed folding zone is consisted with highly weathered Greywacke and Black shale. The suggested solution is to improve the properties of the rock mass of failed area by choosing the optimum level of reinforcement through the increment of slope rock support design so as to control the movement of slopes during the re-excavation. The Bakun hydroelectric project includes the construction of a hydroelectric power plant with an installed capacity of 2,520MW and a power transmission system connecting to the existing transmission networks in Sarawak and Western Malaysia. The power station will consist of a 210m height Concrete Faced Rockfill Dam. During the construction of the dam and the power facilities the Balui River has to be diverted of the tunnels is 12m and the tunnel width is 16m at the portal area. This paper describes the stability analysis and design methods for the open cut rock slopes in the inlet area of the diversion tunnels. The geotechnical parameters employed in stability calculations were given as a function of four defined Rock Mass Type (RMT) which were based on RMR system from Bieniawski. The stability calculations procedure of the rock slopes are divided into two stages. In the first stage, it is calculated for the stability of each "global" slope without any rock support and shotcrete system. In the second stage, it is calculated for each "local" slope stability with berms and supported with rock bolts and shotcrete. The monitoring instrumentation was performed continuously and some of the design modification was carried out in order to increase the safety of failed area based on the unforeseen geological risks during the open cut excavation.

  • PDF

Applicability of the single shell tunnel in Korea from the economic evaluation (경제성 분석에 의한 싱글쉘 터널의 국내 적용성 검토 연구)

  • Kim, Hak-Joon;Shin, Hyu-Seong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.2
    • /
    • pp.167-175
    • /
    • 2008
  • The construction cost for the single shell tunnel is cheaper than that of the double shell tunnel according to the case studies performed in several domestic and foreign tunnels. However, the economic advantage of single shell tunnel drops drastically as the condition of the rock mass deteriorates. Therefore, the single shell tunnelling method should be applied to the good rock mass conditions. The application of the single shell tunnelling method to tunnels in Korea should be determined considering the ratio between the good rock and poor rock masses along the tunnel section. The use of the single shell tunnel is expected to offend depending on the cheap supply of high quality shotcrets and rock bolts developed for single shell tunnels.

  • PDF