• Title/Summary/Keyword: Roadway network

Search Result 24, Processing Time 0.016 seconds

Development of comprehensive earthquake loss scenarios for a Greek and a Turkish city: seismic hazard, geotechnical and lifeline aspects

  • Pitilakis, Kyriazis D.;Anastasiadis, Anastasios I.;Kakderi, Kalliopi G.;Manakou, Maria V.;Manou, Dimitra K.;Alexoudi, Maria N.;Fotopoulou, Stavroula D.;Argyroudis, Sotiris A.;Senetakis, Kostas G.
    • Earthquakes and Structures
    • /
    • v.2 no.3
    • /
    • pp.207-232
    • /
    • 2011
  • The development of reliable earthquake mitigation plans and seismic risk management procedures can only be based on the establishment of comprehensive earthquake hazard and loss scenarios. Two cities, Grevena (Greece) and D$\ddot{u}$zce (Turkey), were used as case studies in order to apply a comprehensive methodology for the vulnerability and loss assessment of lifelines. The methodology has the following distinctive phases: detailed inventory, identification of the typology of each component and system, evaluation of the probabilistic seismic hazard, geotechnical zonation, ground response analysis and estimation of the spatial distribution of seismic motion for different seismic scenarios, vulnerability analysis of the exposed elements at risk. Estimating adequate earthquake scenarios for different mean return periods, and selecting appropriate vulnerability functions, expected damages of the water and waste water systems in D$\ddot{u}$zce and of the roadway network and waste water system of Grevena are estimated and discussed; comparisons with observed earthquake damages are also made in the case of D$\ddot{u}$zce, proving the reliability and the efficiency of the proposed methodology. The results of the present study constitute a sound basis for the development of efficient loss scenarios for lifelines and infrastructure facilities in seismic prone areas. The first part of this paper, concerning the estimation of the seismic ground motions, has been utilized in the companion paper by Kappos et al. (2010) in the same journal.

Quantitative Evaluation of the Semi-Actuated Signal Control Systems (반감응 신호제어의 정량적 효과 평가에 관한 연구)

  • Kim, Seung-Jin;Lee, Sang-Soo;Lee, Choul-Ki;Park, Sung-Kyun;Lee, Ho-Jun
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.12 no.3
    • /
    • pp.19-28
    • /
    • 2013
  • This study evaluated the quantitative effects of the deployment of semi-actuated signal systems using field data. For this, a semi-actuted signal system was deployed in the regional roadway network extensively. This paper investigated an operating strategy of semi-actuated signal systems for field application, and implemented the functional strategy into the standard signal controller. The performance was evaluated using three measures of effectiveness such as traffic volume, travel time, and the number of delayed vehicle. From the analysis results, traffic volume increased about 9.4% and 11.3% for morning and evening peak periods, respectively. The average travel time was reduced about 6.3% and 7.8% during morning and evening peak periods, respectively because of the expansion of bandwidths for major streets. In addition, the number of delayed vehicles was reduced about 36.4% and 23.9% for morning and evening peak periods, respectively. It is expected that the effectiveness of signal control system can be improved by incorporating a properly designed semi-actuated signal system in regional roadways with directional demand variation.

APPLYING ENTERPRISE GIS TO DISASTER MANAGEMENT AT KANGWON PROVINCE

  • Yoon, Hoon-Joo;Ryu, Joong-Hi;Kim, Jung-Dai;Park, Hong-Gi
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.9 no.2 s.18
    • /
    • pp.29-36
    • /
    • 2001
  • The purpose of this paper is to describe the Disaster Management System Development of Enterprise GIS at the Kangwon Province in Korea. This project is included into 'the Kangwon Enterprise GIS 21 plan'. The Division of Disaster Management is in the middle of the 2-year project of the Disaster Management System development, appropriate for business performed at the Departments of Forestry, Culture, Environment, Tourism, etc. At the 1st phase of CIS implementation, for more than half a year we focused on the necessity of management of disasters. In the planning process, we needed long-term information on the whole area of Kangwon. In the assessment and response processes, we needed real-time data from Korean Meteorological Administration and other agencies. All the above information was carefully studied and referred to. ESRI's new GIS technologies solve the natural hazard/disaster problems. For example, hazardous materials routing often needs to be found the least expensive path through a roadway network. In the circumstances given, we can choose the departure point and destination of the vehicle, which carries the materials. It's also possible to minimize overall risk and costs of disaster problems by making a plan of people and possessions evacuation from the disaster area in short time limits. We can meet all the above goals using the latest ESRI's technologies.

  • PDF

A Study on the Socio-economic Direct Effects of the Opening of the Gyeongbu Expressway for 50 Years (경부고속도로 개통 50년의 사회경제적 직접효과 평가 연구)

  • Yoo, Dayoung;Park, Byeonghun;Hong, Jungyeol;Choi, Yoonhyuk;Shon, Euiyoung;Park, Dongjoo
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.20 no.1
    • /
    • pp.119-131
    • /
    • 2021
  • This study quantitatively derived the direct socio-economic effects of the Gyeongbu Expressway, which opened in 1970, and suggested a methodological approach for more reliable results. The scenario was set when the Gyeongbu Expressway was not constructed in 1970, the opening of the Gyeongbu Expressway was delayed by 10 years, and the toll road between Seoul and Daejeon, or between Seoul and Gangneung was opened instead of the Gyeongbu Expressway as suggested by the World Bank. In addition, direct benefits were estimated by calculating and comparing the current vehicle operating costs, travel time costs, traffic accident costs, and environmental pollution costs. As a result, it was estimated that about 351 trillion won in direct benefits occurred, and it can be seen that the promotion of the construction project of the Gyeongbu Expressway at that time had a huge impact on South Korea's social economy.