• Title/Summary/Keyword: Road recovery

Search Result 75, Processing Time 0.02 seconds

A Study on the Fundamental Performance of a Lego Block System for Road Recovery (도로복구를 위한 레고식 차도블록 시스템의 기초성능에 관한 연구)

  • Lim, Sunwoo
    • Journal of the Society of Disaster Information
    • /
    • v.13 no.2
    • /
    • pp.191-198
    • /
    • 2017
  • Lego block system forms a temporary pavement area using the assembled structure block in the road excavation work for the maintenance and installation of facilities. This system was developed for a safe passage of vehicles and pedestrians. A study on the fundamental performance of a lego block system was performed through material quality, sliding resistance and compression tests. And compaction performance of ground on the road was reviewed and evaluated through field tests. As a result, a lego block system for road recovery showed the excellent performance and compaction effect.

The Effect of Road Networks on Urban Resilience in Flooding (도시침수 시 도로네트워크가 도시회복도에 미치는 영향 분석)

  • Hyung Jun Park;Dong Hyun Kim;Hyun Jung Lee;Seung Oh Lee
    • Journal of Korean Society of Disaster and Security
    • /
    • v.16 no.2
    • /
    • pp.85-98
    • /
    • 2023
  • Flood is one of the most frequent natural disasters worldwide. In Korea, the probability of urban flooding is greatly increasing due to complex factors such as global warming, an increase in impervious areas, and limitations in expanding water supply facilities in existing urban areas. However, large-scale civil engineering works to prevent urban inundation are socially and economically difficult to obtain national consent. Recently the importance of resilience, which is the ability to return to the original state after a disaster through rapid recovery while preparing for natural disasters to a level that the local community can afford socially and economically, is increasing. Accordingly, various studies on urban resilience have been conducted, but the resilience measurement method related to the lifeline that provides essential services of the city is insufficient. However, among lifelines, road networks are important facilities for the transportation of recovery resources and rapid recovery in the event of a natural disaster, so road networks are a major factor that must be considered when measuring the degree of recovery of a city in the field of natural disasters. Therefore, this study proposes a recovery evaluation method considering the characteristics of resilience and road networks in the urban flooding field and analyzes the effect of road networks on urban resilience.

Progression of Restoration of Soil Physical Properties and Vegetation in Logging Roads - In Case of 9 Years Results after Construction of Logging Road - (벌채지내(伐採地內) 운재로(運材路)의 토양물리성(土壤物理性) 및 식생(植生)의 회복과정(回復過程) - 운재로(運材路) 개설(開設)이후 9년 경과의 경우 -)

  • Woo, Bo-Myeong;Kim, Kyung-Hoon;Park, Jae-Hyeon;Choi, Hyung-Tae
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.1 no.1
    • /
    • pp.18-27
    • /
    • 1998
  • To investigate the restoration progression on soil physical properties and vegetation at the surface of logging road affected by timber harvesting operation. This study was carried out at logging roads constructed from 1989 to 1994 in Mt. Baekwoon, Kwangyang, Chollanam-do. Judging from the analysis of soil hardness, there were significant changes in the depth of soil between 5 and 10cm. Soil hardness was recovered from the compacted condition to the natural forest condition after 9 years passed. Soil macroporous ratio (pF2.7) of topsoil was higher than that of deep soil. Soil moisture retention of topsoil was more improved than that of deep soil. From the view of soil bulk density, the necessary time for recovering to the undisturbed condition of forest soil was about 10 years in the logging road left. Soil physical properties such as soil bulk density and porous ratio were recovered as time passed. Improved soil physical properties promoted the plant recovery on the logging road surface. The dominant species on the logging roads were Comus kousa, Prunus sargentii as overstory species, Rubus crataegifolius, Lespedeza bicolor as understory species, and Saussurea gracilis, Pteridium aquilinum var. latiusculum as herbaceous species. The plant recovery of bank-slopes was faster than that of cut-slopes and road surface. In progress of year, average plant coverage were 70 to 90% in cut- and bank-slopes and 30 to 60% on the logging road, surface which was elapsed 9 years after logging road construction. Therefore, additional planting and seeding work could be effective to the soil condition and vegetation restoration.

  • PDF

Anticipated and actual performance of composite girder with pre-stressed concrete beam and RCC top flange

  • Gurunaathan, K.;Johnson, S. Christian;Thirugnanam, G.S.
    • Structural Engineering and Mechanics
    • /
    • v.61 no.1
    • /
    • pp.117-124
    • /
    • 2017
  • Load testing is one of the important tests to determine if the structural elements can be used at the intended locations for which they have been designed. It is nothing but gradually applying the loads and measuring the deflections and other parameters. It is usually carried out to determine the behaviour of the system under service/ultimate loads. It helps to identify the maximum load that the structural element can withstand without much deflection/deformation. It will also help find out which part of the element causes failure first. The load-deflection behaviour of the road bridge girder has been studied by carrying out the load test after simulating the field conditions to the extent possible. The actual vertical displacement of the beam at mid span due to the imposed load was compared with the theoretical deflection of the beam. Further, the recovery of deflection at mid span was also observed on removal of the test load. Finally, the beam was checked for any cracks to assert if the beam was capable of carrying the intended live loads and that it could be used with confidence.

A Study on the Verification of Traffic Flow and Traffic Accident Cognitive Function for Road Traffic Situation Cognitive System

  • Am-suk, Oh
    • Journal of information and communication convergence engineering
    • /
    • v.20 no.4
    • /
    • pp.273-279
    • /
    • 2022
  • Owing to the need to establish a cooperative-intelligent transport system (C-ITS) environment in the transportation sector locally and abroad, various research and development efforts such as high-tech road infrastructure, connection technology between road components, and traffic information systems are currently underway. However, the current central control center-oriented information collection and provision service structure and the insufficient road infrastructure limit the realization of the C-ITS, which requires a diversity of traffic information, real-time data, advanced traffic safety management, and transportation convenience services. In this study, a network construction method based on the existing received signal strength indicator (RSSI) selected as a comparison target, and the experimental target and the proposed intelligent edge network compared and analyzed. The result of the analysis showed that the data transmission rate in the intelligent edge network was 97.48%, the data transmission time was 215 ms, and the recovery time of network failure was 49,983 ms.

East Inverse Perspective Mapping and its Applications to Road State Detection

  • Gang, Yi-Jiang;Eom, Jae-Won;Song, Byung-Suk;Bae, Jae-Wook
    • Proceedings of the IEEK Conference
    • /
    • 2000.07a
    • /
    • pp.23-26
    • /
    • 2000
  • An improved inverse perspective mapping (IIPM) is proposed so as to reduce computational expense of recovery of 3D road surface. An experimental system based on IIPM is developed to detect lane parameters for a driver assistant system. A re-organized image is obtained quickly and exactly by IIPM. Efficient preprocessing techniques are used to enhance the information of lane and obstacles. Lane in the preprocessed. image is located with region identification. Lane parameters are estimated effectively. An algorithm to adaptively modify the parameters of IIPM is given. Properties of obstacle on 3D road surface are discussed and used to detect obstacles in the current lane and neighboring lanes. Experimental results show that the new method can extract lane state information effectively.

  • PDF

Estimation of Road-Network Performance and Resilience According to the Strength of a Disaster (재난 강도에 따른 도로 네트워크의 성능 및 회복력 산정 방안)

  • Jung, Hoyong;Choi, Seunghyun;Do, Myungsik
    • International Journal of Highway Engineering
    • /
    • v.20 no.1
    • /
    • pp.35-45
    • /
    • 2018
  • PURPOSES : This study examines the performance changes of road networks according to the strength of a disaster, and proposes a method for estimating the quantitative resilience according to the road-network performance changes and damage scale. This study also selected high-influence road sections, according to disasters targeting the road network, and aimed to analyze their hazard resilience from the network aspect through a scenario analysis of the damage recovery after a disaster occurred. METHODS : The analysis was conducted targeting Sejong City in South Korea. The disaster situation was set up using the TransCAD and VISSIM traffic-simulation software. First, the study analyzed how road-network damage changed the user's travel pattern and travel time, and how it affected the complete network. Secondly, the functional aspects of the road networks were analyzed using quantitative resilience. Finally, based on the road-network performance change and resilience, priority-management road sections were selected. RESULTS : According to the analysis results, when a road section has relatively low connectivity and low traffic, its effect on the complete network is insignificant. Moreover, certain road sections with relatively high importance can suffer a performance loss from major damage, for e.g., sections where bridges, tunnels, or underground roads are located, roads where no bypasses exist or they exist far from the concerned road, including entrances and exits to suburban areas. Relatively important roads have the potential to significantly degrade the network performance when a disaster occurs. Because of the high risk of delays or isolation, they may lead to secondary damage. Thus, it is necessary to manage the roads to maintain their performance. CONCLUSIONS : As a baseline study to establish measures for traffic prevention, this study considered the performance of a road network, selected high-influence road sections within the road network, and analyzed the quantitative resilience of the road network according to scenarios. The road users' passage-pattern changes were analyzed through simulation analysis using the User Equilibrium model. Based on the analysis results, the resilience in each scenario was examined and compared. Sections where a road's performance loss had a significant influence on the network were targeted. The study results were judged to become basic research data for establishing response plans to restore the original functions and performance of the destroyed and damage road networks, and for selecting maintenance priorities.

On the Recovery from Error Based on Aging (Error 회복 중심의 Aging)

  • Lee, Keun-Boo
    • Journal of the Korea Safety Management & Science
    • /
    • v.11 no.2
    • /
    • pp.159-165
    • /
    • 2009
  • Through the understanding of the change of productivity and the ability of error recovery according to aging and the assessment and analysis of them, we may take this research to contribute to make a design for the road-map to help set up the policy of employment for old generation. For this we have taken an experiment of the coordination tester for 100 person who are chosen randomly and analysed the collected data using SAS, which is one of widely used statistical analysis packages. The main results are as follow: $\circledcirc$ The result of regression between the working speed and the length of the correction of error shows independence. (pr>0.2029). $\circledcirc$ The regression between age and working speed is statistically significant. (pr<0.0001) $\circledcirc$ The relation between age and the length of the correction of error is not significant. (pr>0.9123).

A Study of Recovery Standards and Post-Evaluation Method for Long Term Community Preventive Recovery Plan (개선복구계획 수립기준 및 효과측정 연구)

  • Jung, Woo-Young;Jung, Sang-Man;Choi, Hyun-Kyu;Lee, Sang-Moon
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.2
    • /
    • pp.31-37
    • /
    • 2009
  • Most damages of civil infrastructures under natural disasters are frequently occurred at surrounding areas of the river or the road. Every year, Recovery for these disaster damages are performed by the government. Recently, the government decide to change current recovery plan system because current recovery plan which doesn't consider future disaster impacts at a site has been proved to be ineffective. Accordingly, new permanency recovery plan system is needed and its corresponding ideas are presented in this research considering more detailed disaster damage classifications and cause assessments. The proposed permanency recovery plan would also provide more systematic and diverse recovery response strategies including both two concepts, for example Preparedness considered by risk assessment and management, and Mitigation investigated by hazard impact analyses.

Accelerated Construction Method of Long-span PSC Girder Bridge for the Recovery of Flood Damaged Road (수해도로 복구를 위한 장경간 프리캐스트 바닥판 PSC거더교 교량 급속 시공)

  • Oh, Hyun Chui;Ma, Hyang Wook;Kim, In Gyu;Kim, Young Jin
    • Journal of Korean Society of societal Security
    • /
    • v.1 no.4
    • /
    • pp.51-56
    • /
    • 2008
  • Because of our country's climate that has the 50% of the annual precipitation in summer, annually a lot of bridges on the roads are broken in this season. So, we need an accelerated bridge construction method that complete to repair the roads. This paper introduces the Hangae 2 bridge, prefabricated bridge using full depth precast deck panels and new types of PSC girders. The Hangae 2 bridge located in lnje-gun, kangwon-do. This is a good example of the accelerated bridge construction method for recovery of flood damaged road. The PSC girder bridge system introduced in this paper is a rapid construction method for bridge that can reduce the term of works over 50%.

  • PDF