• Title/Summary/Keyword: Road maintenance

Search Result 574, Processing Time 0.022 seconds

도로포장 유지보수 공사비산정기준 개정에 대한 연구 (A Study on Revising Construction Cost Calculation for Road Paving Maintenance Work)

  • 오재훈;안방율
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.155-156
    • /
    • 2020
  • Unlike new construction projects, road paving maintenance work shows large productivity discrepancies depending on the conditions of the worksite. The current construction cost calculation scheme, however, only provides daily construction volume categorized by work scope and scale: There are no detailed standards that can be implemented on various types of worksites. To develop standards that enable the calculation of appropriate construction costs by taking into account worksite conditions, the current study conducted on-site surveys and interviews. The on-site research and analysis revealed that location, construction width, the day's worksite lot, work scope, and construction objectives were found to cause differences in construction volume. In addition to the existing work scope and work scape variables, the current study added weight constants reflecting the daily work volume based on movement conditions at site and the size of the worksite lot. In this process, the current study found that even one type of construction project can have fifteen different levels of daily construction volume. Such detailed classification was deemed to enable the proper calculation of construction costs based on worksite conditions.

  • PDF

국도 시설물 유지관리를 위한 현장점검시스템 개발 (The Development of Visual Inspection System for National Road Facility Maintenance Management)

  • 주기범;김태학;박상근
    • 한국전자거래학회:학술대회논문집
    • /
    • 한국전자거래학회 2003년도 종합학술대회 논문집
    • /
    • pp.72-77
    • /
    • 2003
  • 시설물의 손상현황을 파악하기 위한 현장점검업무는 의사결정과 유지보수공사를 위한 원천 정보를 생성하는 과정으로서 시설물 유지관리 Life Cycle에서 매우 중요한 부분을 차지하고 있다. 하지만, 수작업 및 중복입력 둥의 과다한 업무와 손상상태의 결정, 점검이력의 활용미비, 유지관리업무의 전문성 부족 등으로 효율성과 신뢰성을 갖춘 점검업무가 수행되지 못하고 있는 실정이다. 본 연구에서는 국도 상의 주요구조물인 교량, 터널, 지하차도 등을 대상으로 과다한 현장점검업무를 효율적으로 처리하고 점검결과에 신뢰성을 제공할 수 있는 현장점검시스템을 개발하였다. 현장점검업무의 분석과정에서 나타나는 문제점들을 파악하여 개선방안을 기능설계에서 반영하여 시스템화하였다. 본 시스템은 국도유지건설사무소에서 활용할 애정이며, 손상상태의 추적, 보수 물량 산출 등 유지관리 업무의 효율적인 관리가 가능해질 것으로 기대된다.

  • PDF

계층분석법을 이용한 도로관리장비 운영의 효율성 평가 (Evaluation for Operational Efficiency of Road Management Equipment using Analytical Hierarchy Process)

  • 양충헌;김인수
    • 한국도로학회논문집
    • /
    • 제14권5호
    • /
    • pp.157-164
    • /
    • 2012
  • PURPOSES: Regional offices of the Ministry of Land, Transport and Maritime Affairs use a computerized system called KAMIS so as to manage road equipment systematically. Road agencies can record number of operating days by equipment, actual working hours, accumulated operating hours (or distance) by equipment, and operating cost. However, KAMIS does not provide critical information, although it is strongly related to efficient road management equipment operation. In other words, road agencies do not know whether they have sufficient equipment to handle their actual work. METHODS: Therefore, this study suggests a methodology to evaluate for operational efficiency of road management equipment using analytical hierarchy process(AHP). First of all, estimated weights related criteria can be produced by AHP, and then use operational history by pieces of equipment. RESULTS: Results show that importance of management work can differ from weather conditions through five areas. CONCLUSIONS: Commonly, this results can imply to help save money for the purchase and maintenance of road management equipment, and they would improve the functional performance of KAMIS.

자전거도로 조사장비를 이용한 포장상태 평가 기준 연구 (A Study on the Evaluation Criteria of Pavement Condition Using Investigation Equipment of Bicycle Road)

  • 김경남;조신행;안지헌;김낙석
    • 대한토목학회논문집
    • /
    • 제36권6호
    • /
    • pp.1125-1131
    • /
    • 2016
  • 자전거 이용 활성화를 위해 자전거도로 이용자의 안전성 및 승차감을 고려한 포장상태 평가 기준을 제시하고자 하였다. 자전거도로는 주행환경의 변화에 민감하게 반응하기 때문에 일반적인 도로에 적용하는 포장상태 평가기준을 도입하기에 무리가 있다. 본 연구에서는 자전거도로에 적합한 새로운 포장상태 평가기준을 제시하였다. 제시된 자전거도로 포장상태 평가기준은 자전거 조사장비(RMSI; Road Monitoring System using ICT)를 통해 측정된 충격가속도 값을 기준으로 5등급으로 구분하였으며, 자전거도로 이용자의 만족도조사를 통해 제시 기준의 타당성을 검토하였다. 제시된 기준의 등급은 포장상태가 매우 양호한 A 등급부터 즉각적인 보수가 필요한 E 등급으로 구분된다. 이용자 만족도조사 결과 A 등급의 경우 91%, E 등급은 95%의 상관성을 보여 만족도조사 결과와 제시된 기준의 상관성이 매우 높은 것으로 나타났다. 이를 통해 자전거도로 조사장비를 이용한 자전거도로 유지관리에 상당히 효과적이며 자전거도로 이용자의 안전성 및 주행성을 확보할 수 있을 것으로 기대된다.

서울시 중앙버스전용차로 포장방법 개선방안 연구 (A Study on the Improvement of Pavement for Bus Rapid Transit System in Seoul)

  • 배윤신;권완택;이상염
    • 한국도로학회논문집
    • /
    • 제16권4호
    • /
    • pp.11-19
    • /
    • 2014
  • PURPOSES: This study is to suggest the improvement for bus rapid transit system in Seoul METHODS: The maintenance cost for bus lane damages and plastic deformations are increased by bus passing speed, heavy bus weight, and climate change (localized torrential downpour, subtropical climate) and the accident risk has been increased. RESULTS: Recent analysis of pavement damage indicates that bus lane damage caused by heavy weight is overwhelming and it is urgent to prepare countermeasures. CONCLUSIONS : Pavement data of bus rapid transit system, bus transit numbers and pavement damage elements were analyzed. By analyzing pavement maintenance, design and construction, the countermeasures for the improvement of bus lane pavement and effective maintenance were suggested.

Development of performance evaluation model for road and railway tunnels in use

  • Kim, Hong-Kyoon;Moon, Joon-Shik;An, Jai-Wook;Michael, E.S.
    • Geomechanics and Engineering
    • /
    • 제29권3호
    • /
    • pp.369-376
    • /
    • 2022
  • Accurately evaluating and predicting the performance of facilities is a key task in establishing a maintenance strategy for facilities. The importance of performance evaluation is becoming more pronounced, especially when the aging of facilities requires a huge budget. In this study, performance assessment models were developed for road and railway tunnels. Delphi analysis was performed to identify sub-elements necessary to evaluate the performance of a tunnel. The relative importance of the evaluation factors was derived from the AHP analysis. The correlation analysis was performed between each assessment factor and the final result to verify the significance of the model. For the correlation analysis, the survey data measured through precision safety diagnosis in tunnels in use was applied. The cost effectiveness analysis was also conducted according to the scenarios with different composition of performance factors in order to improve the practical applicability of the evaluation model developed in this study.

Monitoring and performance assessment of a highway bridge via operational modal analysis

  • Reza Akbari;Saeed Maadani;Shahrokh Maalek
    • Structural Monitoring and Maintenance
    • /
    • 제10권3호
    • /
    • pp.191-205
    • /
    • 2023
  • In this paper, through operational modal analysis and ambient vibration tests, the dynamic characteristics of a multi-span simply-supported reinforced concrete highway bridge deck was determined and the results were used to assess the quality of construction of the individual spans. Supporting finite element (FE) models were created and analyzed according to the design drawings. After carrying out the dynamic tests and extracting the modal properties of the deck, the quality of construction was relatively assessed by comparing the results obtained from all the tests from the individual spans and the FE results. A comparison of the test results among the different spans showed a maximum difference value of around 9.3 percent between the superstructure's natural frequencies. These minor differences besides the obtained values of modal damping ratios, in which the differences were not more than 5 percent, can be resulted from suitable performance, health, and acceptable construction quality of the bridge.

AHP분석을 통한 도로 교통안전지킴이 로봇 개발에 관한 연구 (A Study on the Development of Road Traffic Safety Moderator Robot using AHP)

  • 이영우;권혁준
    • 한국도로학회논문집
    • /
    • 제16권6호
    • /
    • pp.159-167
    • /
    • 2014
  • PURPOSES : The purpose of this study is to analyze the requirements of the road traffic safety moderator robot when road repairing. The road traffic safety moderator robot is road traffic safety equipment and to conversions mechanical engineering and IT when road repairing. METHODS : The study used AHP based on the survey from road repair related expert that field engineers, design engineers, public officials and professors. The survey used paired comparison. The survey items were safety, convenience and economics. The safety is classified as visibility or efficiency, the convenience is classified as utility or mobility and the economics is classified as initial investment cost or maintenance $ management cost. The survey alternatives were the road traffic safety moderator robot, traffic regulation by human, traffic regulation by mannequin and traffic signs. The software for AHP is Expert Choice 2000. RESULTS : The results of AHP analyze, the weighted value of safety was analyzed with the highest at 0.488 of survey items. The weighted value of convenience was analyzed at 0.295, the weighted value of economics was analyzed at 0.218. The results of the road traffic safety moderator robot, the weight value of efficiency and utility were analyzed with the highest at 0.284 and 0.259 of alternatives. The weighted value of initial investment cost and maintenance & management cost were analyzed with the lowest at 0.203 and 0.211 of alternatives. The consistency test results of each items, null hypothesis is rejected because the CR values were 0.000 respectively. Therefore, the study results are consistency. CONCLUSIONS : The result of this study, overall value of the road traffic safety moderator robot came off second-best of other alternatives. The road traffic safety moderator robot has been received highest praise by the result of the study as good road traffic safety equipment when road repairing because the weighted values of efficiency and utility were analyzed with the highest of survey items. The efficiency mean securing safety and the utility mean practical assistance when road repairing. The results of this study showed that the road traffic safety moderator robot will effective for traffic safety when road repairing. economics and visibility are that supplementation of the road traffic safety moderator robot because the weighted values of economics and visibility were analyzed with the lowest of survey items. The consistency test results are consistency because the CR values were 0.000 respectively.

광산 비포장도로 상태 조사를 위한 스마트폰 애플리케이션 개발 (Development of a Smartphone Application to Investigate Unsurfaced Road Conditions in Mines)

  • 최요순;김헌무;서장원
    • 터널과지하공간
    • /
    • 제28권6호
    • /
    • pp.555-568
    • /
    • 2018
  • 광산에서 효율적이고 안전한 운반 작업을 수행하기 위해서는 덤프트럭이 이동하는 비포장도로의 상태를 정기적으로 점검하고, 그 결과에 따라 체계적인 유지보수를 시행해야 한다. 본 연구에서는 광산의 비포장도로 상태를 주기적으로 조사하는데 사용될 수 있는 스마트폰 애플리케이션을 개발하였다. 개발된 애플리케이션을 사용하면 미국 육군 공병대에서 개발한 Unsurfaced Road Condition Index(URCI) 평가 체계에 따라 필요한 정보를 현장에서 쉽게 수집하고, 비포장도로의 상태를 정량적으로 평가할 수 있다. 부산 일광광산 비포장도로 일부 구간의 조사를 위해 개발된 애플리케이션을 적용하였다. 그 결과 URCI 평가 체계에서 고려되는 7가지 인자들을 사용자 인터페이스 화면을 통해 손쉽게 조사하고, 현장에서 URCI 값을 빠르게 계산하여 비포장도로의 상태를 평가할 수 있었다. 본 연구에서 개발한 스마트폰 애플리케이션은 광산현장의 비포장도로의 상태 조사 및 평가를 위해 유용하게 활용될 수 있을 것이다.

아스팔트포장 유지보수 적정공사비 산정방안 연구 (A Study on the Estimation of Proper Construction Cost for Road Pavement Maintenance Work)

  • 오재훈;송태석;안방율
    • 한국건설관리학회논문집
    • /
    • 제21권6호
    • /
    • pp.16-26
    • /
    • 2020
  • 도로포장 유지보수 공사는 다양한 현장 여건에 의해 작업량이 다양하게 발생되고 있으나, 공사비 예정가격 작성시 세분화된 기준이 없어 적정공사비가 산정되기 어렵다. 도로포장 유지보수는 신설포장과 달리 차량들이 운행하고 있는 상황에서 시공을 할 수 밖에 없어, 도심지, 작업제한시간, 야간, 시공면적 등에 따라 생산성에 많은 차이를 보이고 있다. 이를 보정하기 위해 공사비산정기준 등에서는 차로수, 주택가, 작업가능시간, 야간작업 등의 할증을 제시하고 있으나, 공사관계자들에 따라 상이하게 적용이 되고 있는 실정이다. 본 연구에서는 도로포장 유지보수 주요 작업공종에 대하여 현장의 여건을 제대로 반영 할 수 있는 공사비산정 기준을 마련하고 적용할 수 있는 방안을 조사하였다. 주로 많이 시공되고 있는 '절삭 후 아스팔트 덧씌우기', '표층복구', '포장복구', '도로복구'를 대상으로 현장을 조사·분석 하였으며, 현장조사 결과를 바탕으로 기본적인 번화가, 주택가 등 할증을 포함하여 작업시간과 시공개소 및 면적에 따라 시공량을 구분하여 적용할 수 있는 기준을 제시하였다. 작업시간은 이동과 준비시간을 제외한 순수작업시간을 3개 type(7시간, 5시간, 3시간)으로 구분하여, 각 type에 따라 시공개소의 면적을 5가지로 구분할 수 있는 계수를 마련하였으며, 공사비를 비교·분석 하였다. 이에 따라 시공목적, 현장여건에 따른 공사비산정기준 설계방법을 제시하여 설계자가 현장여건을 고려하여 적정한 공사비를 산정할 수 있는 방안이 마련된 것으로 판단된다.