• Title/Summary/Keyword: Road maintenance

Search Result 577, Processing Time 0.026 seconds

A Road Surface Temperature Prediction Modeling for Road Weather Information System (도로기상정보체계 활성화를 위한 노면온도예측 모형 개발)

  • Yang, Chung-Heon;Park, Mun-Su;Yun, Deok-Geun
    • Journal of Korean Society of Transportation
    • /
    • v.29 no.2
    • /
    • pp.123-131
    • /
    • 2011
  • This study proposes a model for road surface temperature prediction on basis of the heat-energy balance equation between atmosphere and road surface. The overall model is consisted of two types of modules: 1) Canopy 1 is used to describe heat transfer between soil surface and atmosphere; and 2) Canopy 2 can reflect the characteristics of pavement type. Input data used in the model run is obtained from the Korea Meteorological For model validation, the observed and predicted surface temperature data are compared using data collected on MoonEui Bridge along CheongWon-Sangju Expressway, and the comparison is made on winter and other seasons separately. Analysis results show that average difference between two temperatures lies within ${\pm}2^{\circ}C$ which is considered as appropriate from a micrometeorology point of view. The model proposed in this paper can be adopted as a useful tool in practical applications for winter maintenance. This study being a fundamental research is anticipated to be a starting point for further development of robust surface road temperature prediction algorithms.

An Analysis of Driver Perception of Nighttime Visibility Using Fuzzy Set Theory (퍼지집합이론을 이용한 야간 도로 시인성 평가)

  • LEE, Dong Min;Youn, Chun Joo;KIM, Young Beom
    • International Journal of Highway Engineering
    • /
    • v.17 no.5
    • /
    • pp.57-66
    • /
    • 2015
  • PURPOSES: Nighttime driving is very different from daytime driving because drivers must obtain nighttime sight-distances based on road lights and headlights. Unfortunately, nighttime driving conditions in Korea are far from ideal due to poor lighting and an insufficient number of road lights and inadequate operation and maintenance of delineators. This study is conducted to develop new standards for nighttime road visibility based on experiments of driver perception for nighttime visibility conditions. METHODS : In the study, perception level and satisfaction of nighttime visibility were investigated. A total of 60 drivers participated, including 34 older drivers and 31 young drivers. To evaluate driver perceptions of nighttime road visibility, fuzzy set theory was used because the conventional analysis methods for driver perception are limited in effectiveness for considering the characteristics of perception which are subjective and vague, and are generally expressed in terms of linguistic terminologies rather than numerical parameters. RESULTS : This study found that levels of nighttime visibility, as perceived by drivers, are remarkably similar to their satisfactions in different nighttime driving conditions with a log-function relationship. Older drivers evaluated unambiguously degree of nighttime visibility but evaluations by young drivers regarding it were unclear. CONCLUSIONS : A minimum value of brightness on roads was established as YUX 30, based on final analyzed results. In other words, road lights should be installed and operated to obtain more than YUX 30 brightness for the safety and comfort of nighttime driving.

A study of Improvement on the Road Drainage Poor Site (도로배수 취약구간의 개선방안에 대한 연구)

  • Lee, Man-Seok;Kim, Heung-Rae;Lee, Kyung-Ha;Kang, Min-Soo;Song, Min-Tae
    • International Journal of Highway Engineering
    • /
    • v.13 no.2
    • /
    • pp.125-131
    • /
    • 2011
  • This research aims to investigate the cause of the occurrence of a weak road drainage section scientifically and specifically through a site survey for a poorly drained section occurring due to rainfalls during road operation. This paper deeply reviewed the existing research results and current situation data on the poorly drained sections accumulated in Korea Expressway Corporation in order to investigate the cause of the occurrence of a weak road drainage section, and deeply verified and analyzed the weak sections for the road surface drainage facilities and the other road drainage facilities by visiting the expressway controlled by the 6 local headquarters and 33 branches of Korea Expressway Corporation. As a result of site surveys for the weak road drainage sections, i) in a road surface section, occurrence of ponding in the road shoulder pavement due to slope changes, bad collection of water in the collecting well at a median strip, shortage of road shoulder dike height, and inferior construction, etc. was analyzed to be the main cause of the occurrence of poorly drained sections, and ii) in a road neighborhood section, the occurrence of pavement height difference in a main road and shoulder section due to inferior ditches on a slope and the bad drain age at the inlet and outlet of a culvert due to soil deposits, debris, etc. were analyzed to be the main cause of the occurrence of weak sections. Proposed as a plan to improve the poorly drainage section of road were i)calculation of capacity through material changes at the ditch, enhancement of vertical sections and hydraulic analysis in terms of construction and other aspects, ii)derivation of a combined slope considering a slope and a vertical linearity and maintenance of proper distance between drainage structures in a vertical concave section in terms of geometrical structure, and iii)calculation of the drainage facility installation interval using a minutely rainfall intensity formula and a non-uniform flow analysis technique in terms of hydraulics and hydrologics and prompt removal of rainfalls from the road surface according to a linear drainage method.

Methodology for Benefit Evaluation according to Maintenance Method and Timing of National Highway Pavement Section (국도포장 유지보수 공법 및 시기에 따른 편익산정 방안)

  • Do, Myungsik;Kwon, Soo Ahn;Choi, Seunghyun
    • International Journal of Highway Engineering
    • /
    • v.15 no.5
    • /
    • pp.91-99
    • /
    • 2013
  • PURPOSES : This study aims at proposing the methodology for benefit evaluations in pavement maintenance methods and timings using KoPMS(Korean Pavement Management System) software which was developed for efficient pavement management. METHODS : This study classified pavement sections into 4 clusters considering AADT(Annual Average Daily Traffic) and ESAL(Equivalent Single-Axle Load) using cluster analysis and used the deterioration models in each cluster. Increased user costs due to pavement deterioration as time goes by and agent costs for maintenance were estimated. Based on deterioration model and KoPMS software, Methodology for benefit evaluation was proposed in pavement maintenance methods and with/without implementation using real pavement section data. RESULTS : This study verified that considering agent costs only would be constrained to decide pavement maintenance methods and timings, and ascertained that decision making with agent and user costs would be effective. In addition, this study revealed that pavement maintenance methods and timings can be affected by AADT and ESAL and frequent pavement maintenances can be more efficient for benefits in pavement sections with more AADT and ESAL. Also this study found that user costs would be more affected to decision making than agent costs. Moreover, Delay of conducting pavement maintenance caused increased vehicle operating costs and environmental costs because of poor conditions of pavements. CONCLUSIONS : This study proposed LCCA and benefit estimation methodology of pavement with considering agent and user costs. The results of this study can be used for baseline data of efficient pavement asset management.

A Study for the factors affecting to the life of Asphalt Overlay on Aged Cement Concrete Pavement (노후화 된 시멘트 콘크리트 포장의 아스팔트 덧씌우기 포장 수명에 미치는 영향인자에 관한 연구)

  • Son, Hyeon-Jang;Askhat, Turgynbekuly;Kim, Young-Kyu;Lee, Seung-Woo
    • International Journal of Highway Engineering
    • /
    • v.13 no.1
    • /
    • pp.207-221
    • /
    • 2011
  • More than sixty percentage of highway in South Korea were constructed by concrete pavements and more than half of the concrete pavements were twenty years or older. The most of highway have difficulty in providing detour due to the traffic and road condition of South Korea. So far, asphalt concrete has been used for the overlay of aged cement concrete pavement. However, the frequent early damage and maintenance of typical asphalt overlay due to repetitive maintenance causes inconvenience of road users and expensive costs. It is necessary to investigate the factors affecting the performance of asphalt concrete overlay to improve the performance of asphalt overlay. However, the performance data of asphalt concrete overlay in South Korea does not exist. In this research, to investigate on the factors affecting the life of asphalt concrete overlay was attempted based on statistical analysis of the performance data of asphalt concrete overlay included in LTPP (Long-Term Pavement Performance) Database of U.S.A.

Development and Evaluation of Cold-applied Crack Sealant for Pavement Maintenance (도로포장 보수용 상온식 균열실링 재료의 개발 및 평가)

  • Kim, Yeong Min;Jeong, Kyu Dong;Lee, Kang Hoon;Im, Jeong Hyuk
    • International Journal of Highway Engineering
    • /
    • v.19 no.2
    • /
    • pp.45-53
    • /
    • 2017
  • PURPOSES: The objectives of this study are to develop a new cold-applied crack sealant and to evaluate its properties and field applicability by comparing with other conventionally used crack sealants. METHODS : A new cold-applied crack sealant was developed by using neoprene latex to improve material properties. The fundamental properties such as viscosity, residue %, penetration, and softening point of the developed crack sealant were tested by TxDOT criteria to evaluate crack sealing capability. Moreover, the performance of the developed cold-applied crack sealant was evaluated under both laboratory and field conditions. In the laboratory, the bond property was evaluated using the developed cold-applied crack sealant and conventional hot-applied crack sealant by the bond-properties test standardized under ASTM D 6690. In the field, test sections were constructed on three areas: a trunk road, bus-only lane, and motorway, with the developed crack sealant and three conventional crack sealants. After construction, early field-inspection was performed on the test sections. RESULTS AND CONCLUSIONS : Overall, the developed cold-applied crack sealant demonstrates reasonable storage stability, durability, and bond property compared to conventional hot-applied crack sealants. From the test sections, it was established that the developed cold-applied crack sealant does not pose construction issues. Moreover, the early performance was verified through field inspection. However, as the field inspection was conducted a week after the construction, it is necessary to conduct an inspection of performance from a long-term point of view.

Dynamic Response of Steel Plate Girder Bridges by the KL-510 Load (KL-510 하중에 의한 강판형교의 동적응답)

  • Chung, Tae-Ju
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.17 no.6
    • /
    • pp.50-60
    • /
    • 2013
  • Dynamic response of steel plate girder bridges by KL-510 design truck in KHBDC considering the road surface roughness of bridges and bridge-vehicle interaction is investigated. Simply supported steel plate girder bridges with span length of 20m, 30m, and 40m from "Standard Highway Bridge Superstructure" published by the Korean Ministry of Construction are used for a bridge model, and ten sets of the road surface roughness of bridge deck are generated from power spectral density (PSD) function by assuming the roadway as "Average Road". A three dimensionally modeled 5-axle tractor-trailer with its gross weight, which is the same as that of KL-510 design truck, is used for dynamic analysis. For the finite element modeling of superstructure, beam element for the main girder, shell element for the concrete deck, and rigid link between main girder and concrete deck are used. Impact factor and DLA of steel plate girder bridges for different span are calculated by the proposed numerical analysis model and compared with those specified by several bridge codes.

Prediction of Life Expectancy of Asphalt Road Pavement by Region (아스팔트 도로포장의 균열률에 대한 지역별 기대수명 추정)

  • Song, Hyun Yeop;Choi, Seung Hyun;Han, Dae Seok;Do, Myung Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.4
    • /
    • pp.417-428
    • /
    • 2021
  • Since future maintenance cost estimation of infrastructure involves uncertainty, it is important to make use of a failure prediction model. However, it is difficult for local governments to develop accurate failure prediction models applicable to infrastructure due to a lack of budget and expertise. Therefore, this study estimated the life expectancy of asphalt road pavement of national highways using the Bayesian Markov Mixture Hazard model. In addition, in order to accurately estimate life expectancy, environmental variables such as traffic volume, ESAL (Equivalent Single Axle Loads), SNP (Structural Number of Pavement), meteorological conditions, and de-icing material usage were applied to retain reliability of the estimation results. As a result, life expectancy was estimated from at least 13.09 to 19.61 years by region. By using this approach, it is expected that it will be possible to estimate future maintenance cost considering local failure characteristics.

Study on the Improvement of Proposal Works for PPP Project: Focused on Operation and Maintenance Cost (민간투자사업의 제안서 작성 업무 개선에 관한 연구 - 운영관리비 산정 업무를 중심으로 -)

  • Koo, Ja Kyung;Lee, Dong Wook;Shim, Myung Seob;Lee, Tai Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6D
    • /
    • pp.655-662
    • /
    • 2010
  • As the national competitive power indicator, the infrastructures have been constructed with government's SOC budgets. However, even SOC budget is decreased, Public-Private Partnership Project (PPP project) has been introduced to solve demands on extending infrastructures, and among PPP projects, road projects take high portions. This study analyzes the operation & management item of financial model which is connected to the O&M cost and project proposal of previously proposed road project and analyzes the Korea Expressway Co.,'s project cost items and O&M tasks to reflect the characteristics of road projects. Based on results, this study suggests necessity of the O&M cost breakdown structure and the cost calculation standard on each cost item. Also, for the existing task execution tools, O&M cost calculation tool and finance analysis task tool will be integrated, and the system is suggested web-based system. Thus, it is expected that it contributes to the securing overall business values on PPP project and expending profit-base infrastructures.

Suggestion of the Post-Environmental Evaluation of Road-side Cut Slope after Revegetation Works (도로비탈면 녹화공사의 사후환경평가 항목 제언)

  • Kim, Tae-Kook;Kim, Nam-Choon;Kim, Eun-Bum;Koo, Min-Kyu
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.21 no.4
    • /
    • pp.75-86
    • /
    • 2018
  • This research was thereby made to study and analysis ecological, landscape, and stability qualities of roadside cut Slopes in expressways and national highways that went through revegetation works. Also, evaluation items and framework for integrated assessment of plant structure and restored state for the maintenance were suggested. Following is the summary of the result. firstly, for stabilization of introduced native plant species on roadside cut slops, assessment on the post-project environmental management through long-term monitoring and maintenance works must be made. It signifies a form of authentic recovery and restoration by the native plants. second, current evaluation framework on the test beds is well managed with clear evaluation standards and table while its method of assessing the post management with only test bed results lacks conformity with this study site. Newly developed evaluation framework on the post construction sites is estimated to be used as assessment standards on any roadside construction sites. Third, after site investigation distinction was observed among different revegetating construction types in the long-term perspective. Due to the different duration time of vegetation state between seed-spray measures(degraded in time) and layer-spray measure(maintained), the use of coarse straw-mat mulching work or Coir net was suggested in long term maintenance of cut slopes. forth, segmentation of post environmental assessment is organized into three large categories of "ecological", "stabile", and "landscape" qualities regarding post restoration quality and stability of slope through native plants with which categories marks 50, 30, 20 points of rates. fifth, components of the post environmental assessment were segmented in twelve categories driving results from former experimental construction and newly focused items on site. In the future, it is possible to propose a customized assessment method considering the location and location of construction work if the research on the application of post-environment assessment methods for road construction surface recording is conducted systematically.