• Title/Summary/Keyword: Road foundation

Search Result 168, Processing Time 0.021 seconds

A Study on Improvement Measures for the Design Documents Delivery System in Public Road Construction Projects (공공 도로건설사업에서의 설계도서 납품체계 개선방안에 관한 연구)

  • Ok, Hyun;Kim, Seong-Jin;Kim, Tae-Hak;Ju, Ki-Bum
    • International Journal of Highway Engineering
    • /
    • v.20 no.2
    • /
    • pp.45-55
    • /
    • 2018
  • PURPOSES : This study aims to survey and analyze the status of the design and completion documents output delivery system in public construction projects in order to assess the problems of the Ministry of Land, Infrastructure and Transport (MOLIT)'s electronic delivery system, with a focus on roads and rivers, and to offer improvement measures. METHODS : This study first surveys and analyzes laws and existing study trends with regard to the design and completion documents output delivery system in public construction projects. It further analyzes the status of the output delivery system in public construction projects, including roads, rivers, expressways, water resources, and railroads. In addition, a comparative analysis of the current electronic delivery system of MOLIT and Korea Expressway Corporation in the road field is conducted, and the problems and improvement measures for MOLIT's electronic output delivery system are presented. This study seeks to analyze problems and prepare improvement measures with regard to road and river public construction projects, as ordered by MOLIT's five regional offices. RESULTS : This study sought to prepare the electronic output delivery system with regard to public construction projects and present the analysis of its major problems and improvement measures in four categories: "the preparation of electronic design documents output delivery system improvement measures including inspection and delivery," "preparation of guidelines, systems, etc., concerning electronic design documents," "preparation of improvement measures for the construction project management system and electronic design document support tools", and "linking of MOLIT's electronic output delivery system with relevant agencies and the expansion thereof to local governments." CONCLUSIONS : This study analyzed the current status and problems of the MOLIT's electronic output delivery system in the field of road and river construction projects, and presented corresponding improvement measures. This study is expected to address the problems of the MOLIT's electronic output delivery system, and to provide the foundation for the preparation of an efficient electronic output delivery system for design and completion documents. In addition, this study is expected to boost the quality and utilization of the electronic design documents output, and to exchange, share, and link construction information among relevant agencies so as to prepare the foundation for sharing construction information.

Evaluation of Comfortable Improvement of the Tractor Seatbelt

  • Kim, Kwan-Woo;Kim, Hyuk-Joo;Park, Keun-Sang
    • Journal of the Ergonomics Society of Korea
    • /
    • v.30 no.4
    • /
    • pp.495-501
    • /
    • 2011
  • The objective of this study was to evaluate the convenience of the tractor seatbelt. We selected four healthy men as subjects. We measured their body pressure and examined the comfort of the seatbelt, while driving 50m on three different types of agricultural road with two types of seatbelts: automatic and manual. As results, when they used manual seatbelt, subjective uncomfortable rate was much higher than the automatic seatbelt on all types of road. Especially, body pressure was undistributed while using manual seatbelt on rough road.

A Study on the Yeongam Eupseong (Town Fortress) (영암읍성(靈巖邑城) 소고(小考))

  • Kim, Young-Pil
    • Journal of architectural history
    • /
    • v.20 no.5
    • /
    • pp.47-61
    • /
    • 2011
  • This study examined the background and change of building Yeongam eupseong and characteristics and construction method of its spatial structure. The results of this study can be summarized as follows. First, Yeongam eupseong was built for the same purpose of national border defense against the invasion of Japanese army as other Eupseongs were built and it was found first in the literature in the era of King Munjong of Joseon Dynasty with the scale of three gates and 4,369 cheok of castle wall. Such a scale was continued and in particular, according to flat structure, road network and gate position shown in the map, the form and road system of Yeongam eupseong before the 19th century were mostly identical with the current ones. Second, castle wall was built over foundation by using talcum after leveling the foundation soil and castle wall can be divided into outer wall, filling part and inner wall from the section. Outer wall was constructed by inserting and layering pebbles with big irregular stone, filling part was made with talcum and riprap and inner wall with soil in several layers by keeping gradient. This building method showed common features in inserting and layering pebbles for outer wall, use of protruded base and section form compared to Jeollado Eupseong.

Settlement behaviours and control measures of twin-tube curved buildings-crossing shield tunnel

  • Jianwei, Jia;Ruiqi, Gao;Defeng, Wang;Jianjun, Li;Ziwen, Song;Jinghui, Tan
    • Structural Engineering and Mechanics
    • /
    • v.84 no.5
    • /
    • pp.699-706
    • /
    • 2022
  • Settlement control techniques are critical for the safety of shield tunnel constructions, especially for facing complex situations. In this study, the shield tunnel structure from Huaita east road station to Heping Road station in Xuzhou metro No.3 line (China) is taken as engineering background, which has various complex problems of the upper-soft and lower-hard composite stratum conditions, twin curve shield tunnels, and underpass the foundation of the piled raft. The deformation characteristics of shield tunnelling passing through buildings are explored. Subsequently, comprehensive research methods of numerical simulation and field measurement are adopted to analyzing the effectiveness of settlement control by using the top grouting technique. The results show that the settlement of the buildings has obvious spatial characteristics, and the hysteresis effect can be obviously observed in soil deformation caused by shield construction. Meanwhile, the two shield constructions can cause repeated disturbances, reducing the soil deformation's hysteresis effect. Moreover, the shield tunnel's differential settlement is too large when a single line passes through, and the shield construction of the outer curve can cause more significant disturbance in the tunnel than the inside curve. Notably, the proposed process control parameters and secondary topgrouting method can effectively control the deformation of the shield tunnel, especially for the long-term deformation.

Evaluation of Traffic Load and Moisture-Induced Nonlinear In-situ Stress on Pavement Foundation Layers (도로기초에서 교통 및 환경하중에 의한 비선형 현장응력 평가)

  • Park, Seong-Wan;Hwang, Kyu-Young;Jeong, Mun-Kyoung;Seo, Young-Guk
    • Journal of the Korean Geotechnical Society
    • /
    • v.25 no.7
    • /
    • pp.47-54
    • /
    • 2009
  • Better understanding of in-situ mechanical behavior of pavement foundations is very important to predict long-term effects on the system performance of transport infrastructure. For this purpose resilient stiffness characterization of geomaterials is needed to properly adopt such mechanistic analysis under both traffic and environmental loadings. In this paper in-situ monitoring data from KHC test road were used to analyze the non-linear response using finite element method for a selected constitutive model of foundation geomaterials, and the results were compared with the field data.

Characteristics of Road Slopes and Decision of Priority for Investigation at the Central part of Vietnam (베트남 중부지방 도로비탈면 노출 특성 및 조사우선순위 결정 연구)

  • Kim, Seung-Hyun;Kwon, O-Il;Kim, Jae-Jung;Koo, Hobon
    • The Journal of Engineering Geology
    • /
    • v.27 no.3
    • /
    • pp.275-292
    • /
    • 2017
  • Large landslides have occurred more than 100 times each year by the influence of cyclones and torrential rain each year in Vietnam. Nevertheless, they $don^{\circ}$Øt have a scientific management system to prevent the landslide disaster in advance. In this study, we acquisited the risk factor and damage factor about each slope throughout basic survey at Hoang Sa Costal Road, Danang and at Ho Chi Minh Road, Quangnam. The priority of investigation technique considering of the exposure characteristics of the road slope in Vietnam developed by the empirical analysis with the acquired data. As a result, we can set the foundation of scientific management for the road slope management system in Vietnam.

A Review of Instrumentation System and Construction of Korea Highway Test Road (시험도로 건설과 계측시스템 구축)

  • 최준성;김도형;김성환
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.11a
    • /
    • pp.603-606
    • /
    • 2000
  • The cost needed for the construction and management of highways in the whole nation is rapidly growing so the research that can decrease the cost is required. However, most of the highway specs have simply converted from those of other countries, including USA. Therefore, some of our design and construction specs were not the optimum ones based on our own situation, requiring a research under the actual traffic and environment of our nation. The use of test road develops many aspects of highway engineering. Those are evaluation of construction materials, a general overview of korea pavement design and serviceability under the actual traffic and environmental condition of the nation. It is also economical and efficient compared to the trial construction of each item in spreaded form. A test road, 7.7km long with two lanes, is being constructed on the Inner Central Expressway. In this test road, 2.7km is planned for asphalt pavement and 3.4km is planned for concrete pavement. Three test bridges and five earth retaining structures will be included in the test road. Based on the master plan, the major performance was progressing such as detailed research modules of each area, preliminary research for the future research, sensor surveys for the behavior analyses of pavements and structures with installation methods and data acquisition systems, the foundation research of Integrated Instrumentation System and the Management Plan for automated measurement. Some area(structure research division, geotechnical research division) was designed the instrumentation plan because some instrument sensors must be installed during the construction of the test road. And then the instrumentation plan of each area was enforcing because a large majority of the instrument sensors must be installed after the construction of the test road. The field surveys with material property tests and pilot instrumentation test with sensor tests was also performing in accordance with the construction in the field.

  • PDF

Development of IFC Converter Prototype for Applying BIM in the Road Field (도로분야 BIM 적용을 위한 IFC 변환기 프로토타입 시스템 개발)

  • Seo, MyoungBae;Ju, KiBeom
    • Korean Journal of Computational Design and Engineering
    • /
    • v.19 no.4
    • /
    • pp.347-355
    • /
    • 2014
  • IFC converters and viewers, applicable in the construction field, are being actively developed while, in the civil engineering field, IFC schemata are being developed. To prove the IFC schema grammatically, the existing ISO 10303 30s' pre-processors and post-processors may be used. However, to visually prove the IFC model, the existing commercial 3D modeling software should be converted into the IFC schema of civil engineering field, and a viewer is needed to view it. Thus, this study developed a IFC converter and viewer prototype system to apply BIM in the road field. To express the road line, LandXML was analyzed, and IFC suitable for expressing shapes in the road field was designed. Also, an IFC suitable for bridges with focus on representative bridge structures such as abuts, piers and decks was designed. Further, a converter was developed using AutoCAD's Civil3D and Revit's 3rdp party tools, and software was also developed designed to combine each converted IFC model into one IFC. In addition, a viewer designed to view IFC in the road field was developed to prove the converted IFC. Eight major verification and examination items were selected and used in testing the converted model, and it was confirmed that the viewer normally viewed the IFC schema in the road field. The proposed IFC converter is expected to be used as a visual IFC verification tool in the road field.

Archaeological Interpretation for Wolseong Fortress in Gyeongju using GPR (GPR을 이용한 경주 월성 지하유구의 고고학적 해석)

  • Oh, Hyun-Dok;Shin, Jong-Woo
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2004.08a
    • /
    • pp.180-189
    • /
    • 2004
  • The name of (Ban)wolseong thanks to its having a shape like a half-moon. Wolseong fortress is one of 'Gyeongju Historic Area', world heritage. The Silla kingdom's royal palace previously maintained its capital fortress at the locale of Wolseong. However its real face has been kept in mystery. This study grafts Geophysics on modern Archaeology and approaches with scientific and systematic methods to an excavation plan or archaeological study by means of GPR exploration which can complement archaeological curiosity without destroying Wolseong fortress. The exploration area is $12,000m^2$ in front of Seokbinggo(stone storage for ice). It is only $10\%$ area of Wolseong fortress. As a conclusion, GPR detected 7 of squared buildings($8{\times}8m^2$ size), stone wall, an entrance for the fortress, lots of foundation stones, road(presumptive), and a presumptive pond which size is 35${\~}$40m in diameter.

  • PDF

Static and Dynamic Stability Evaluation of Model Guardrail Posts Based on Geotechnical Properties (지반특성에 기초한 모형 연성방호책 지주의 정적 및 동적안정성 평가)

  • Lim, Yu-Jin
    • International Journal of Highway Engineering
    • /
    • v.11 no.1
    • /
    • pp.233-245
    • /
    • 2009
  • Availability of pressuremeter test for evaluation of geotechnical properties of foundation soil into which guardrail post is to be installed is investigated in this study. First, an analysis method of the post based on the pressuremeter test is proposed that can obtain bending moment and load-deformation profiles of the post. Then static horizontal load test onto a small scale guardrail post is performed in order to get bearing capacity and load-deformation pattern of the model post. The obtained results are compared with the load-deformation curves and bearing capacity of the post obtained from the pressuremeter method. In addition horizontal impact test to the post is performed using a model bogie car in order to check failure pattern around the model foundation and to investigate dynamic bearing capacity due to deceleration and inertia force of the soil. It is verified that the pressuremeter test is so useful and reasonal technique to analyze road foundation-post interaction.

  • PDF