The expansion of old road is needed in construction the entrance at the $\bigcirc$$\bigcirc$I/C road in $\bigcirc$$\bigcirc$city. To strength the national competition, many agents who concerned do their best for finishing that construction early as soon as possible. In generally, soil embankment on soft foundation is caused to reduce the stability by making the settlement of ground surface due to the over load. Thus, we try to make it stable by building EPS embankment construction which in our working place is one kind of the method of light embankment construction after excavating the original ground.
경주의 월성에 대한 발굴 작업 없이도 고고학적인 호기심을 충족시킬 수 있도록 비파괴 조사방법의 일환인 GPR(Ground Penetrating Radar) 탐사법을 적용하여 지하유구의 존재 상황을 조사하였다. 이는 현대고고학과 지구물리학을 접목하여 향후 발굴계획이나 고고학적 연구에 과학적이고 체계적인 접근 전기를 마련하고자 하는 의미도 있다. GPR 탐사는 석빙고 앞 및 성의 동편 끝 지역에서 실시되었으며 향후 3차원 자료처리 및 해석을 위해 조사대상지 전체에 대해 조밀한 측선을 설정하였다. 구성된 3차원 볼륨 자료를 고고학적으로 해석한 결과, 대형 건물지 7채와 담장 및 성의 출입시설, 수많은 초석들, 도로,그리고 원지 등을 추정할 수 있었다.
Recently, BIM has been widely applying in civil engineering projects centering on the private construction industry in order to establish self guidelines for spreading in practice. However, most BIM technologies and software are based on the architectural projects. In these environments, it is not easy to apply the BIM to a infrastructure field. Even BIM standards with IFC (Industry Foundation Classes) are also focusing on architectural projects. Especially, both private and public sectors do not know about how BIM delivery system should be performed, and how such deliverable should be submitted to the government yet. Thus, we need to analyze an application level of BIM S/W (Software) in real projects and verify their interoperability. Besides, since there are not any common standards that can exchange IFC models for civil engineering projects, we have many issues in converting as-built infrastructure models into IFC and delivering their design documents to the government. Accordingly, this study aims to perform a BIM process with commercial software for real road project after a detailed design process is finished and verify interoperability between diverse BIM software for securing BIM data reliability.
교통하중이 작용하는 기초지반의 성능 및 도로하부 지반에서의 변형예측을 위해서는 반복적인 교통하중하에서의 장기변형 예측이 필요하다. 그러나 도로와 철도와 같은 다층시스템에서의 장기변형을 예측하는 것은 쉽지 않은 일이다. 따라서 보다 정량적인 해석을 위해서는 적절한 해석방식, 재료모형, 그리고 재료의 상수들을 통한 역학-경험적인 방식이 필요하다. 따라서 본 연구에서는 반복 교통하중에 의한 응력의존적인 기초 지반재료의 장기변형 거동 파악을 위해 반복 하중의 응력수준과 함수비 조건이 고려된 반복재하 장기변형실험을 실시한 결과를 분석하고 해석에 활용하였다. 여러 응력상태조건에서 기초 지반재료의 장기변형 특성이 반영된 유한요소해석을 실시하였고 장기변형 예측모델의 실내시험규모에서의 적용성을 평가하였다.
In the case of a rail road bridge extension work, especially single track to double track, the foundation of new substructure which supports the extended part of superstructure could be interfered by the exist foundation of an old bridge. When these two foundations are jointed to prevent such fatal effects of the structure as unequal subsidence of soil foundations, it is important to prove the structural behaviour of the joining surfaces between new foundation and old foundation. 3-Dimensional Finite Element Analysis Method have been studied for the solutions of the structural behaviour of the foundations. In this analysis, 'Contact Element' which allows the sliding of each adjoining member is used for the joint of the boundary surface of the old and new pier foundations. Furthermore, Material Nonlinear Behaviour Analysis also supports the accuracy of the result in this study because the foundations consist of concrete main bodies and reinforced steel bars. These detailed analyses secure the verification of the structural safety of the foundations in the extension work more firmly.
The Subject of this research work is to study the driver's vision and eye-movement ch-aracteristics under the diffrent condiction of road traffic and driving. The analysis of this investigation was conducted spatially or temporaly into three parts'eye-mark distribution, viewing-time percentage and fixation duration. This dissertation focuses on analysis of dr-iver's visual characteristics to improve road circumstamces. In this study driver's ch-aracteristics are measured with eye-mark recorder and analyzed statistically The main features of this study are : 1st Duration distribution of fixation point is significant in 87% at 5% of the significant level in Gamma Distribution. The average of fixation duration by road are 0.33sec on streets 0.45sec on Roads and 0.86sec on highways. The average of fixation duration by visual objects are 0.4sec on road surface 0.26sec on road shoulder 0.49sec on traffic sign 0.37sec on warning sign and 0.67sex on gwide sign. 2st Moving anglrs of a fixation point are fit in the Exponential Distribution. The average moving angle is appeared to be 3.85。 on streets 2.81。 on roads 2.73。 on highway and 5 。 on intersecyion. 3st As a result of examining alignment of guide and warning sign in traffic signs cxisting foundation methods are less affected by lane than by apeed of a vehicle.
The purpose of this research presents a method to position and makes the structure for eco-corridors reasonably with collectable analysing results of various effects shown in mammals' road-kill at 429 points. Target animals of this research are Leopard cat, Siberian weasel, Raccoon dog, Korean hare, Eurasian red squirrel, Siberian chipmunk and Water deer. The results derived from the empirical analysis on the contents above are followed. First, according to the results as for Leopard cat road kill analysis, which is designated as Endangered Species Class II, the eco-corridor might be located at near village having stead food in order to decrease the frequencies of road-kill, because its road kill points were mainly collected at 4 lane hilly road with mountain-road-farm area geological type of. Second, because Siberian weasel's road kill was detected at 2 lane hilly road with mountain-road-stream geological type, the eco-corridor might be located at near a mill to decrease road-kill frequencies. Third, the road-kill frequency of Eurasian red squirrel can be reduced when the eco-corridor is located at the area across coniferous tree near 4 lane west sea freeway with mountain-road-mountain. Fourth, the road-kill of Raccoon dog can be reduced when the eco-corridor is located at 4 lane mountain road or hilly road with the geological type having farm land-road-mountain(stream). Fifth, Korean hare's road-kill can be reduced when the eco-corridor is located at grass land across ridge line of mountain, because wild rabbit road kill was happened at 4 lane mountain road or 2 lane mountain road(mountain-road-mountain). Sixth, As for Siberian chipmunk, the eco-corridor might be located at the side slope of mountain road at 2 lane mountain road under the speed of 60km/h with mountain-road-mountain. Seventh, For Water deer, the eco-corridor might be located at 4 lane hilly road with mountain-road-farm land. As for Common otter, Amur hedgehog, Yellow-throated marten, Weasel, it is difficult to specify the proper site of eco-corridor due to the lack of data. Eco-corridors for carnivores might be well located at 4 lane hilly road or 2 lane hilly road with mountain-road-farm land, and the track for herbivores might be well located as a overhead bridge on mountain-road-mountain type across mountains. In order to position eco-corridors for wildlife properly, we have to research animal's behavior with ecological background, and to consider the local uniqueness and regularly collect the empirical road-kill data in long term 3 to 5 year, which can be the foundation for the more suitable place of wild life eco-corridors.
A methodology is developed to evaluate the vulnerability of bridge piers to scour and to help establish effective disaster measures, taking into account the locality and scour characteristics in Korea. Based on the bearing capacity of bridge foundation-ground integrating system changed by scour, this methodology is able to prioritize bridge foundations reflecting on the geotechnical factors as well as hydraulic ones. The bridge foundation vulnerability to scour is categorized into 7 groups considering the concise information of the bridge foundation-ground integrating system. A case study of implementing this method which includes the analysis of the scour depth and evaluation, and categorizing the scour vulnerability of bridge foundation is presented.
The importance for the department combined is increased concerning structures and pile foundation with the introduction of structures in sesmic design of structures. Therefore, the railway bridge and the road bridge standards approach for the earthquake about above the department combined by using strong coupling. Also, mechanical interpretation is performed as foundation combined with the head of pile foundation assuming the pillars. Accordingly, this study suggests the head of PHC repair can enhance the load carrying capacity and constructability of the department combined after bending, pulling, shear and compressive tests by appling the reinforcement of bending the rebar, the reinforcement of pulling the rebar.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.