The purpose of this study is just for parking shall identify the status of the lack of rental apartments to relieve parking shortages. Next performed, and subsequent utilization of space just outside the parking space expansion plan is to present an alternative. Analysis of the study only 30 of the direction of the plan and set standards according to the nature of each complex. Planned urban planning aspects and architectural aspects of a parking space that can expand and classify the types of features will be discussed. Suggestions on how to take advantage of the parking space that can expand only in state owned lands in the urban planning aspects. The Architectural Planning of the side lot line change in the space and change the use of the Common Service Facilities or just to change the internal road system, by changing the way of parking, secure parking space. This way of working to improve the environment of the complex, at least. Actually just the space of improvement to be made with the opinion of the residents and the surrounding areas of the business association, must be preceded by a feasibility study.
Greater expansion and more frequent operation of the railroad transportation system anticipated due to its characteristics including low cost, safety and mass transportation. Recently, effects on the railway structures due to expansion of newly constructed road, construction of subway, city gas pipeline, communication network, electric power network and construction of other railway underground crossing in accordance with urban planning and organization has influenced safe operation of trains. Accordingly, standard for selection of construction method that will enable construction of more economical and rational subway underground crossing structures by preventing problems occurring at the time of above construction works and accidents in safe operation of trains due to construction in advance is definitively necessary. Although there are numerous construction methods that can be applied at the time of construction of railway underground crossing, there are much difficulties in selection of appropriate construction method that considers characteristics of each construction method on non-excavation type construction method, train operation plan of number of operational routes and on-site circumstances. Therefore, this research aims to present rational standard for selection of construction method for such, and standard for slowdown speed and interception of train when passing the areas of slowdown in sectors under construction.
Cho, Young Kyo;Lee, Young Hoon;Park, Beom Keun;Kim, Seong-Min
International Journal of Highway Engineering
/
v.19
no.6
/
pp.47-56
/
2017
PURPOSES : The purpose of this study is to investigate the stresses of the middle slab in a double-deck tunnel owing to the slab lift to replace the underlying elastic pads during maintenance work. METHODS : The middle slab was divided into three different sections: typical section, expansion joint section, and emergency passageway section. Finite element analysis models of these three sections of middle slab were developed, and the stress distribution and maximum stresses were obtained using the models when the middle slab was lifted to replace the underlying elastic pads. Various slab lifting methods were examined in this study such as one-, two-, and multiple-point lifts, distributed lifts, and one or both slab side edge lifts. RESULTS : When the slab side edge is lifted, the longitudinal stresses of the slab are almost the same as the principal stresses. This implies that the governing stresses are the longitudinal stresses. The maximum stresses with both-edge lifts are generally smaller than those with one-edge lifts at all three sections of middle slab. CONCLUSIONS : If the middle slab in a double-deck tunnel is lifted for maintenance, the slab should be lifted at multiple points along the longitudinal direction to reduce the tensile stresses.
For improving the effectiveness of travel information, some rational paths are needed to provide them to users driving in real road network. To meet it, k-shortest path algorithms have been used in general. Although the k-shortest path algorithm can provide several alternative paths, it has inherent limit of heavy overlapping among derived paths, which nay lead to incorrect travel information to the users. In case of considering the network consisting of several turn prohibitions popularly adopted in real world network, it makes difficult for the traditional network optimization technique to deal with. Banned and penalized turns are not described appropriately for in the standard node/link method of network definition with intersections represented by nodes only. Such problem could be solved by expansion technique adding extra links and nodes to the network for describing turn penalties, but this method could not apply to large networks as well as dynamic case due to its overwhelming additional works. This paper proposes a link-based shortest path algorithm for the travel information in real road network where exists turn prohibitions. It enables to provide efficient alternative paths under consideration of overlaps among paths. The algorithm builds each path based on the degree of overlapping between each path and stops building new path when the degree of overlapping ratio exceeds its criterion. Because proposed algorithm builds the shortest path based on the link-end cost instead or node cost and constructs path between origin and destination by link connection, the network expansion does not require. Thus it is possible to save the time or network modification and of computer running. Some numerical examples are used for test of the model proposed in the paper.
KIM, Jae-Hak;LEE, Hong-Sool;ROH, Su-Lae;LEE, Dong-Ha
Journal of the Korean Association of Geographic Information Studies
/
v.22
no.3
/
pp.99-106
/
2019
Technology that cannot be excluded from 4th industry is self-driving sector. The self-driving sector can be seen as a key set of technologies in the fourth industry, especially in the DB sector is getting more and more popular as a business. The DB, which was previously produced and managed in two dimensions, is now evolving into three dimensions. Among the data obtained by Mobile Mapping System () to produce the HD MAP necessary for self-driving, Point Cloud, which is LiDAR data, is used as a DB because it contains accurate location information. However, at present, it is not widely used as a base data for 3D modeling in addition to HD MAP production. In this study, MMS Point Cloud was used to extract facilities around the road and to overlay the location to expand the usability of Point Cloud. Building utility poles and communication poles DB from Point Cloud and comparing road name address base and location, it is believed that the accuracy of the location of the facility DB extracted from Point Cloud is also higher than the basic road name address of the road, It is necessary to study the expansion of the facility field sufficiently.
Guk-Gon Song;Seok-Kyeong Bae;Woo-Young Cho;Hyun-Woo Cho
Journal of the Korea institute for structural maintenance and inspection
/
v.28
no.5
/
pp.47-53
/
2024
This study investigates the noise reduction effects of various road pavement methods to mitigate traffic noise caused by the increasing proximity between roads and residential areas in urban environments. The noise characteristics of four types of road pavement-Dense Asphalt Concrete (DAC), Double Layer Porous Asphalt Concrete (DLPAC), Transverse Tining Concrete (TTC), and Exposed Aggregate Concrete (EAC)-were evaluated using CPX close-proximity noise and pass-by noise measurements. The CPX measurements showed that noise levels increased logarithmically with vehicle speed for all pavements. Specifically, DLPAC demonstrated higher noise levels in the low-frequency range below 800 Hz and lower noise levels in the high-frequency range, which is attributed to resonance effects within the internal pores of the pavement and the reduction of compression and expansion noise. In pass-by noise measurements, DLPAC exhibited higher low-frequency noise compared to DAC, likely due to pavement durability deterioration and the influence of external environmental noise. The results indicate that the CPX measurement method is more effective in evaluating road noise performance as it better reflects the impact of vehicle speed. However, since the study was conducted under limited site conditions, further research across various sites and conditions is necessary to enhance reliability.
Kim, Sang Mok;Choi, Hyeon;Yoon, Jin Sung;Park, Jeong Jun
Journal of the Society of Disaster Information
/
v.16
no.2
/
pp.267-275
/
2020
Purpose: In this study, GPR exploration equipment, spray vehicles and flow meters, core drill, borehole image processing system(BIPS), 3D cavity imagery equipment, and cavity formatting equipment were used to identify this cavity growth process. Method: A certain amount of water was injected in proportion to the mass of the cavity, and the cavity was observed to expand as the injected water was drained out. The cavity rating change was evaluated by quantitatively evaluating the expansion factors and the speed of growth. Results: According to the results of examining the volume change through injection time - injection flow rate - volume increase for the four experimenters, the volume increase decreased as the injection time increased, and there was no further increase in volume if injected for one hour or so. Conclusion: In addition, the injection test analyzed the volumetric variation to determine whether the cause of the cavity occurrence was the effect of the underground burial in the vicinity of the cavity. Therefore, it was found that the cavity expansion is caused by the repetition of the relaxation soil collapse due to the groundwater flow and the loss of the collapsed soil below the cavity.
Tak, Yong Hun;Kim, Jae Dong;Kim, Young Do;Kang, Boosik
KSCE Journal of Civil and Environmental Engineering Research
/
v.36
no.3
/
pp.395-406
/
2016
Population and development are concentrated by urbanization. Consequently, the usage of underground area and the riverside area have been increased. By increasing impermeable layer, the urban basin drainage is depending on level of sewer. Flood damage is occurred by shortage of sewer capacity and poor interior drainage at river stage. Many of researches about flood stress the unavailability of connection at the river stage with the internal inundation organically. In this study, flood calculated considering rainfall and combined inland-river. Also, using urban runoff model analyze the overflow of sewer. By using results of SWMM model, using flood inundation analysis model analyzed internal drainage efficiency of drainage system. Applying SWMM model, which results to flood inundation analysis model, analyzes internal drainage efficiency of drainage system under localized heavy rain in a basin of the city. The results of SWMM model show the smoothness of internal drainage can be impossible to achieve because of the influence of the river level and sewer overflow appearing. The main manholes were selected as the manhole of a lot of overflow volume. Overflow reduction scenarios were selected for expansion of sewer conduit and instruction retention pond. Overflow volume reduces to 45% and 33~64% by retention pond instruction and sewer conduit expansion. In addition, the results of simulating of flood inundation analysis model show the flood occurrence by road runoff moving along the road slope. Flooded area reduces to 19.6%, 60.5% in sewer conduit expansion scenarios.
The Journal of The Korea Institute of Intelligent Transport Systems
/
v.21
no.6
/
pp.1-20
/
2022
The basic way to charge vehicles for using road and public transport networks is the entry-exit toll system. This system works by reading Hi-Pass and public transportation cards of the vehicles using card readers. However, the problems of navigating a route in consideration of entry-exit toll systems include the non-additive costs of enumerating routes. This problem is known as an NP-complete task that enumerates all paths and derives the optimal path. So far, the solution to the entry-exit toll system charging has been proposed in the form of transforming the road network. However, unlike in the public transport network where the cards are generalized, this solution has not been found in situations where network expansion is required with a transfer, multi-modes and multiple card readers. Hence, this study introduced the Link Label for a public transportation network composed of card readers in which network expansion is bypassed in selecting the optimal path by enumerating the paths through a one-to-one k-path search. Since the method proposed in this study constructs a relatively small set of paths, finding the optimal path is not burdensome in terms of computing power. In addition, the ease of comparison of sensitivity between paths indicates the possibility of using this method as a generalized means of deriving an optimal path.
The purpose of this study is to find out the methodologies, using GIS techniques, to appraise the parcel prices and to estimate the compensation expenditures according to road expansions. This study consists of 2 parts. The first pare is to find out the ways for appraisal of patrol prices in certain area by the publicly announced land prices. The second part is to estimate the differences of compensation expenditures according to road expansion methods. The conclusions are as follows. First, to appraise the target parcel prices, a comparison to the publicly announced land prices should be used. For this, 19 items of land characteristics of existing land information should be analyzed and compared using GIS techniques. Second, the compensation expenditure could be easily estimated using GIS techniques too. In this process, if necessary, we have to apply the minimum parcel size in Building Codes.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.