• Title/Summary/Keyword: Road construction site

Search Result 270, Processing Time 0.031 seconds

Optimal location planning to install wind turbines for hydrogen production: A case study

  • Mostafaeipour, Ali;Arabi, Fateme;Qolipour, Mojtaba;Shamshirband, Shahaboldin;Alavi, Omid
    • Advances in Energy Research
    • /
    • v.5 no.2
    • /
    • pp.147-177
    • /
    • 2017
  • This study aims to evaluate and prioritize ten different sites in Iran's Khorasan provinces for the construction of wind farm. After studying the geography of the sites, nine criteria; including wind power, topography, wind direction, population, distance from power grid, level of air pollution, land cost per square meter, rate of natural disasters, and distance from road network-are selected for the analysis. Prioritization is performed using data envelopment analysis (DEA). The developed DEA model is validated through value engineering based on the results of brainstorming sessions. The results show that the order of priority of ten assessed candidate sites for installing wind turbines is Khaf, Afriz, Ghadamgah, Fadashk, Sarakhs, Bojnoord, Nehbandan, Esfarayen, Davarzan, and Roudab. Additionally, the outcomes extracted from the value engineering method identify the city of Khaf as the best candidate site. Six different wind turbines (7.5 to 5,000 kW) are considered in this location to generate electricity. Regarding an approach to produce and store hydrogen from wind farm installed in the location, the AREVA M5000 wind turbine can produce approximately $337ton-H_2$ over a year. It is an enormous amount that can be used in transportation and other industries.

A Case Study on the Stability Analysis for the Road Construction above Abandoned Mine (폐광산 상부 도로 안정성 검토 사례)

  • 문상호;나승훈;이상필
    • Tunnel and Underground Space
    • /
    • v.14 no.5
    • /
    • pp.305-317
    • /
    • 2004
  • Due to the steep and narrow characteristic of domestic coal beds, the slant chute caving or sub-level caving method have been mainly adopted in Korea, whereas the long-wall mining has been widely used all around world. However, the slant chute caving or sub-level caving method have disadvantage of not giving much information on the scale and characteristic of abandoned mines. Hence, those information on the abandoned mines in Korea are not easily available. In this study, based on the characteristic investigation of the domestic mining methods, the geological survey and safety analysis were carried out for Donghae highway section 2. Finally, the optimum ground reinforcement methods for that site were selected.

A Case Study on Turkey Eurasia Tunnel Project (터키 유라시아 터널 프로젝트에 대한 사례연구)

  • Kim, Do-Hyung;Bang, Gyu-Min;Jun, Gy-Chan;Kim, Dong-Hyun;Kim, Taek-Kon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.58-69
    • /
    • 2010
  • Turkey Eurasia Tunnel Project is large scale road construction project of which the total length is 14.6km. The subsea shield TBM tunnel will be constructed under Bosphorus strait and the project site is in poor condition as composite ground, high water pressure and earthquake. The design procedure of subsea tunnel was introduced with tender design materials. That procedure contains tunnel type, TBM type and the principal design items considering geological condition such as high water pressure, composite ground and seismic area. This paper states the progress for geotechnical investigation, seismic analysis and TBM tunnel design. Analysis for geotechnical investigation is in progress, aseismatic design is going on stability study for liquefaction and structure. In addition, the performance of shield TBM to be considered such as advance rate and improvement of TBM was reviewed. The plan of fire safety was also reviewed with respect to fire protection.

  • PDF

The Planning of Micro-climate Control by Complex Types (단지 유형에 따른 도시의 미기후 조절 계획에 관한 연구)

  • Jeong, Juri;Chung, Min Hee
    • KIEAE Journal
    • /
    • v.17 no.1
    • /
    • pp.49-54
    • /
    • 2017
  • Purpose: Temperature in urban areas increase much more than suburban areas and it is called urban heat island (UHI) phenomenon. There are several solutions to control UHI phenomenon such as green roof system, water space construction, and cool roof system. However, application of green roof system and cool roof system to some of the buildings which compose the city has a critical limit. Therefore, in order to diminish the temperature rising and UHI phenomenon due to climate change of the city, it needs to approach from the viewpoint of site or city, rather than the viewpoint of individual buildings. This study is aims at analyzing UHI phenomenon by characteristics of surface materials and suggesting the solutions to reduce UHI phenomenon by types of complex. Method: Literature reviews were conducted to analyze the cause, mitigating plan, and recent trends of UHI phenomenon. For the simulation analysis, the type of complex was classified 3 representative complex. Based on measured reflectivity, simulation about UHI phenomenon was conducted by setting 4 strategies; albedo of roof, road pavement, green roof system, and vegetating around buildings. Result: As the results of simulating the UHI reduction factor by types of complex, it showed that the effect of temperature reduction on the building roof layer is more effective than adjusting the reflectivity of buildings such as green roof system, planting near the buildings in both the detached house complex, apartment complex, and commercial complex.

Feasibility of Forest Land Conversion to Other Use by Considering Forest Fragmentation (산지전용타당성조사제도에서 산림파편화지수의 고려방안 연구)

  • Kim, Mina;Choi, Jaeyong;Lee, Sanghyuk
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.16 no.4
    • /
    • pp.53-63
    • /
    • 2013
  • The purpose of this study is to analyze impacts of the forest fragmentation caused by development project. Furthermore, to investigate the applicability of landscape indicator when 'Feasibility of forest land conversion to other use' is conducted. The study site was consisted of golf course development and road construction. It is to compare before and after impacts of areal and linear development. As for the methods, selecting landscape indices, clustered into 3 Categories have been utilized. Category I was concerned with 'size of forest patches', II as 'shape of forest patches', and III as 'Core Area' These were calculated by FRAGSTATS, the program for analyzing fragmentation. The results showed that linear development caused more fragmented than areal development projects. Also, patch size, patch shape and core area are related to impacts of development, while Patch size decreased, patch shape and core area increased after development. Therefore, it is necessary to minimize the impacts of forest by considering fragmentation when development project is planned.

Effect of Rock Mass Properties on the Blast Vibration by Taguchi method (다꾸치법에 의한 암반물성의 발파진동 영향요소 분석)

  • 김남수;김보현;양형식
    • Tunnel and Underground Space
    • /
    • v.10 no.3
    • /
    • pp.475-480
    • /
    • 2000
  • The propagation of blast vibration and the damping characteristics depend on both the mechanical properties of rock mass and weight charge. In this study, the characteristics of propagation and damping were analyzed by FLAC. The construction site was the second Kwang-ju circulating road. Taguchi method which is one of experimental design methods was used for determination of input data and parameter levels. The results showed that rock density was the most dominant of variables being concerned in this study, which affect the propagation of blast vibration.

  • PDF

Bearing Capacity of Mid & Small dia Hellical Pile (중·소구경 헬리컬 파일의 지지력 특성)

  • Park, Jong-Bae;Park, Yong-Boo;Kwon, Young-Hwan
    • Land and Housing Review
    • /
    • v.11 no.2
    • /
    • pp.75-86
    • /
    • 2020
  • As the urban regeneration project and the old housing maintenance project are actively progressing in Korea, small-scale building construction is being carried out in downtown areas. Small buildings in the downtown area are constructed on about 4 to 10 floors, and since they are carried out in small units in residential areas, it is difficult to enter large equipment to construct existing piles, and it is more vulnerable to complaints about noise and vibration. in this study, helical piles suitable for urban areas or small sites where it is difficult to enter large equipment, such as noise and vibration. Reliability analysis was performed on the results of the static load tests and dynamic load tests conducted at the LH site and the bearing capacity calculated by the hydrostatic method and the empirical formula (N value). As a result of comparing and analyzing the design formula and the results of static load test and dynamic load tests, the correlation between the design formula of the bored pile (Road bridge design standard) formula using N value and the design formula by the modified Davisson method frequently used by method commonly European helical file practitioners.

A Case Study of Hot In-Place Recycling Asphalt Mixture in Korea (국내 현장가열재생아스팔트 시공 혼합물 시험평가)

  • Kwon, Sooahn;Yang, Sunglin;Lee, Jaejun;Hong, Jaecheong;Lim, Jaekyu
    • International Journal of Highway Engineering
    • /
    • v.15 no.1
    • /
    • pp.57-63
    • /
    • 2013
  • PURPOSES: This study is to investigate the Hot In-Place recycling asphalt mixture in Korea using field produced materials. METHODS: Hot In-Place reclaimed asphalt mixture was investigated to evaluate the mixture properties based on various test results such as Marshall Test, Indirect Tensile Test, TSR, and Wheel Tracking Test. These test values were compared with domestic standard specification. RESULTS: The result of the laboratory experiment indicates that the Hot In-Place Reclaimed(HIR) asphalt mixture produced at the field constrution site was satisfied all of the test criteria such as Indirect tensile test, Marshall and TSR test, and wheel tracking test. During the test, the research team found that current HIR system is required an extention of mixing time to improve quality and to reduce variation of sample to sample. Although the current HIR mixture was passed the test criteria, there is a potential capability to enhance the mixture properties as extend mixting time. CONCLUSIONS: Based on these laboratory test results, It would be concluded that domestic HIR mixture's properties were satisfied all standard specification related with evaluation of recycling asphalt mixtures. Based on this case study result, there is a chance to save construction cost and increase the usage of reclaimed asphalt concrete in the future.

Operating Process of Transverse Type Roadheader for Tunnel Excavation in Korea (횡방향 타입 로드헤더의 터널면 절삭공정 고찰)

  • Min-Gi Cho;Jung-Woo Cho;Mun-Gyu Kim;Jae-Hoon Jeong;Sung-Hyun Choi
    • Tunnel and Underground Space
    • /
    • v.33 no.1
    • /
    • pp.1-9
    • /
    • 2023
  • Roadheaders have been operated in the construction of Korean tunneling projects. The note introduces operation manual and management case of transverse type roadhead in a Korean tunneling site. The cutting and reaction forces of axial and transverse type cutting heads were qualitatively analyzed. The shaping surfaces of tunnel faces were visualized in both cases of fixed and auto-controlled telescopic cylinder conditions. Excavating with fixed cylinder, concave surfaces were shaped on tunnel face. The total processes of sumping and shearing were illustrated for excavating hard rock tunneling. The supplementary graphical explanations for total tunneling procedures in Korea were provided.

Geometric Analysis of Fracture System and Suggestion of a Modified RMR on Volcanic Rocks in the Vicinity of Ilgwang Fault (일광단층 인근 화산암 암반사면의 단열계 기하 분석 및 암반 분류 수정안 제시)

  • Chang, Tae-Woo;Lee, Hyeon-Woo;Chae, Byung-Gon;Seo, Yong-Seok;Cho, Yong-Chan
    • The Journal of Engineering Geology
    • /
    • v.17 no.3
    • /
    • pp.483-494
    • /
    • 2007
  • The properties of fracture system on road-cut slopes along the Busan-Ulsan express way under construction are investigated and analyzed. Fracture spacing distributions show log-normal form with extension fractures and negative exponential form with shear fractures. Straight line segments in log-log plots of cumulative fracture length indicate a power-law scaling with exponents of -1.13 in site 1, -1.01 in site 2 and -1.52 in site 3. It is likely that the stability and strength of rock mass are the lowest in site 1 as judged from the analyses of spacing, density and inter-section of fractures in three sites. In contrast, the highest efficiency of the fracture network for conducting fluid flow is seen in site 3 where the largest cluster occupies 73% through the window map. Based on the field survey data, this study modified weighting values of the RMR system using a multiple regression analysis method. The analysis result suggests a modified weighting values of the RMR parameters as follows; 18 for the intact strength of rock; 61 for RQD; 2 for spacing of discontinuities; 2 for the condition of discontinuities; and 17 for ground water.