• Title/Summary/Keyword: Road construction site

Search Result 270, Processing Time 0.026 seconds

Research on Hydraulic System Design and Vehicle Dynamic Modeling for the Development of Tire Roller (타이어 로울러 개발을 위한 유압 시스템 설계 및 차량 동역학적 모델링에 관한 연구)

  • 김상겸;김준호;이운성;김정하
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.10 no.2
    • /
    • pp.201-211
    • /
    • 2002
  • In this research, we are trying to research about hydraulic system design and vehicle dynamic modeling far the development of the tire roller. The reason why we would like develop it is that tire roller is one of the most useful machine for the road construction site and application other construction equipments. Here, we conceptualize the new hydraulic system and derive the equations of motion fur dynamic analysis and also investigate system modeling by using a DAQ board. We design the hydraulic circuit of steering and traction mechanism system. This design can be used to create virtual prototypes of construction equipment. So, we studied tire roller to integrate development technology. In system analysis, we formulate hydraulic traction system model and hydraulic steering system model. Also, we integrate DAQ system to acquire experimental results in real tire roller equipment.

Sink holes material damage and mental harm analysis and risk assessment studies -Focusing on the incidents surrounding the construction site- (씽크홀의 물적손상과 정신적 피해분석 및 위험성 평가연구 -건설현장 주변의 사고사례를 중심으로-)

  • Lim, Jin Sang;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.4
    • /
    • pp.153-160
    • /
    • 2015
  • Recent News patrons of incidents can be called sinkhole that occurred one after another (Sink Hole). Due to this anytime, anywhere I do not know how the land is turned off worry and anxiety is the reason why you can never be dismissed as exaggerated. As we have seen today through the video, the vehicle was traveling on a road or pedestrian who was walking down the street they look out of the basement of a sudden they still come to mind vividly. Here, examples and corresponding measures to prevent the sinkhole off the ground, including the causes and impact on society because of this that occurred, and policy measures and abroad are evaluated with respect to what it is.

A Study on the Field Applicability Evaluation Alali-Activated Soil Mixed Pavement using Red Mud (레드머드를 활용한 알칼리 활성화 흙포장재 현장 적용성 평가에 관한 연구)

  • Kang, Hye-Ju;Lee, Yeong-Won;Oh, Du-Yeon;Lee, Gyu-Yeong;Kim, Dae-Bong;Kang, Suk-Pyo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.96-97
    • /
    • 2015
  • In this search, by evaluating the field applicability of soil mixed pavement of Red mud is mixed into the soil mixed pavement field applicability, and tries to present the basic data about the site application of recycling of red mud and low carbon construction material to. As a result, the conventional soil concrete organization standards (SPS-KSCICO-001: 2003) meets the criteria for a bicycle road, making use of red mud, natural color as well as the natural loess is expressed.

  • PDF

An Analysis for Engineering-Geological Factors on the SL-2 Rock Slope along New Road at Hapcheon-Gun, Gyeongsangnam-Do (경상남도 합천군 신설도로의 SL-2 암반사면에 대한 지질공학적 고찰)

  • Choi Jung-Chan;Song Yong-Sun;La Won-Jin;Kim Nam-Hoon
    • The Journal of the Petrological Society of Korea
    • /
    • v.14 no.3 s.41
    • /
    • pp.180-190
    • /
    • 2005
  • The road slope at Hapcheon-Gun, Gyeongsangnam-Do is under construction, but actual rock quality & discontinuities on the cut slope are something different from the primary design. Therefore, object of this study is to analyze whole engineering-geological characteristics for this slope through site investigation and laboratory analyses because small scale landslides have been occurred during this road construction. For this object, various analyses were performed such as surveying, Schimidt Hammer test, discontinuity investigation and laboratory analysis using DIPS far evaluating slope stability. As the result, it is identified that reinforcement work is needed because plane, toppling & wedge failures will be possibly occurred and seepages are concentrated at several points.

Evaluation of seismic performance of road tunnels in operation (운영 중인 도로 터널의 내진 성능 평가)

  • Ahn, Jae-Kwang;Park, Du-Hee;Kim, Dong-Kyu;Kim, Kwang-Yeom
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.2
    • /
    • pp.69-80
    • /
    • 2013
  • This study evaluates the seismic performance of road tunnels designed before the provisions for seismic design of tunnels were first established in 1999. Extensive design data and site investigation reports are investigated to select tunnels sections that are considered to be most susceptible to seismically induced damage under earthquake loading. Detailed analyses are performed on selected tunnels. The methods used are method of displacement and dynamic analysis. In performing the method of displacement, which is a type of pseudo-static analysis method used for underground structures, full domain and reduced domain modeling were used. The dynamic analyses are performed using finite difference method and using nonlinear constitutive model. Comparisons show that the reduced domain method of displacement match very closely with the dynamic analysis, demonstrating that it is the most suitable method for evaluating the seismic performance of road tunnels built in rocks. It is also shown that road tunnels, for which seismic design were not applied, are safe under the seismic risks corresponding to an earthquake with a return period 1000 years. It is concluded that additional seismic retrofit of tunnels is not necessary.

Occurrence and Influence of acid Leachate by Pyrite in Underground Rocks of Road Construction Field in the Miryang Area (밀양지역 도로건설 현장 지반암석내 분포하는 황철석에 의한 산성침출수 발생과 영향)

  • Chae, Sun Hee;Jeong, Chan Ho;Lee, Yu Jin;Lee, Yong Cheon;Shin, Sang Sik;Park, Jun Sik;Ou, Song Min
    • The Journal of Engineering Geology
    • /
    • v.28 no.3
    • /
    • pp.501-512
    • /
    • 2018
  • The acid leachate derived from the sulfide mineral such as pyrite can cause problems such as aging of infrastructure and environment contamination around the civil construction site. The purpose of this study is to assess the environmental effect of an acid leachate derived from pyrite in the Miryang area under road construction. In this study, 13 samples of situ core were used for the net acid generation (NAG) experiment. The chemical composition including pH, oxidation and reduction potential (ORP) and electrical conductance of water samples produced from the NAG test was analyzed. In additional, five polished thin sections of rock cores were made for electro microprobe analyses. In the results of the NAG tests, 7 samples showed lower values than pH 3.5. It strongly indicated that these areas are under the environmental and infrastructure damage by the acid leachate. The chemical type of the 7 samples was classified as the $Fe(Ca)-SO_4$ type, which is totally a different type compared to general groundwater. The concentration of total sulfur ranges from 0.004% to 12.5%. 6 rock samples are plotted on a potentially acid forming zone in the relation diagram between the total sulfide and NAG-pH. In conclusion, it is suggested that a protection method against an environmental demage and an infrastructure corrosions by the acid leachate should be prepared in all of areas under a road construction.

Geotechnical Characteristics and Field application of Soil Mixed with Waste Lime (부산석회 혼합토의 지반공학적 특성 및 현장 적용 사례)

  • 정하익;홍승서;김상근;홍성완;유홍기;임병익
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.03a
    • /
    • pp.217-222
    • /
    • 2003
  • This study was carried out to investigate the geotechnical characteristics and field application of soil mixed with waste lime. Waste lime used in this study is producted as a by-product in the manufacturing process of making Na$_2$CO$_3$from local chemical factory in Incheon. Currently about 320 milton tons of waste lime are accumulated and annually 100,000 tons are producted. In this study, feasible use of waste lime mixed with granited whathered soil, clay, crushed rock was invesigated through laboratory tests including specific gravity test, sieve analysis, hydrometer analysis, compaction test, CBR test. Field investigations were conducted on the road construction site in Incheon.

  • PDF

Bearing Capacity and Environmental Assessment on Ground with By-product Lime (부산석회 재활용 부지에 대한 지지력 및 환경영향 평가에 관한 연구)

  • Chung, Ha-Ik;Hong, Seung-Seo;Lee, Yong-Soo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.897-903
    • /
    • 2004
  • Waste lime used in this study is producted as a by-product in the manufacturing process of making $Na_2CO_3$ from local chemical factory in Incheon. Currently about 320 millon tons of waste lime are accumulated and annually 100,000 tons are producted. Reuse of waste lime mixed with soil for banking and backfill materia in civil works was analysed in this study. This study was Carried out to investigate the geotechnical and environmental characteristics on field application. Field investigations were conducted on the road construction site in Incheon. This study presents the results of the engineering characteristics in field test and the leaching characteristic of waste lime in laboratory column tests. Countermeasure for reduction of environmental effects was suggested from the test results.

  • PDF

A Study on Tunnel Excavation by Controlled Blast Vibration at Particular Environment Conditions (발파진동 제어에 의한 특수구간 터널굴착에 관한 연구)

  • Choi, Hyung-Bin;Lim, Han-Uk
    • Journal of Industrial Technology
    • /
    • v.20 no.A
    • /
    • pp.257-267
    • /
    • 2000
  • It was difficult to apply conventional excavation methods in some sections from Seoul to Pusan high speed rail road construction of 1 lot 2, due to highway concrete road, gas pipe, water pipe and nearby factories with automatic control system machine. To excavate safely and efficiently in these sections new blast patterns were employed within allowable blast vibration level, by test blast and controlled vibration by sequential blast. Behaviors of the rock mass including convergence and displacement around tunnel were measured with construction works and the crack width in concrete wall was also monitored for controlling allowable limits. The results can be summarized as follow : 1. The allowable blast vibration level in structure site is less 1.0cm/sec for highway concrete, 0.5 cm/sec for gas pipe, water pipe and building housing and 0.3 cm/sec for automatic control system machine. 2. The convergence displacement, single rod extensometer and multi rod extensometer around tunnel and cracks in concrete wall were measured, it was confirmed that the measured values were converged within allowable level. 3. The empirical formular of ground vibrations with 90% confidence lines for PD-3 was given as follow. $$V_{90%}=45.549({\frac{D}{\sqrt{W}}})^{-1.353}$$

  • PDF

An experimental construction of railway steel plate girder strengthen adding ballast system by transport equipment (선로 이송 가설공법을 적용한 철도판형교 유도상화)

  • Min, Ji-Hong;Seo, Jong-Won;Jang, Hyeong-Sik;Park, Joon-Won
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.707-716
    • /
    • 2011
  • It has been applied using cranes or insertion methods to install heavy structures to strengthen existing railway bridges. These methods are uneconomical because of two reasons. The first one is it is required to construct approach roads for heavy equipment and/or working yard. The second one is the electric lines shall be cutoff during construction. Both require additional construction cost and duration. In this study, new transport equipment was developed which can be applied to heavy structures up to 100 ton. Using this method, the heavy structure can be loaded into the new transport equipment at working yard and transported to the working site. This method can be applied, but not limited to railway bridge or roadbed rehabilitation. It was found that the precious construction can be achieved to install heavy structure using this method. The experimental construction to make non-ballast girder bridge composite with new pc deck slab using this method was carried out for Jewon bridge. The example bridge is in extreme condition because it locates above national road #38 within extreme transition curve and has 10 ‰ slope and skew. The experimental construction results were satisfactory both for safety and construction precision.

  • PDF