• Title/Summary/Keyword: Road Side Slope

Search Result 51, Processing Time 0.024 seconds

Numerical investigation of truck aerodynamics on several classes of infrastructures

  • Alonso-Estebanez, Alejandro;del Coz Diaz, Juan J.;Rabanal, Felipe P.A lvarez;Pascual-Munoz, Pablo;Nieto, Paulino J. Garcia
    • Wind and Structures
    • /
    • v.26 no.1
    • /
    • pp.35-43
    • /
    • 2018
  • This paper describes the effect of different testing parameters (configuration of infrastructure and truck position on road) on truck aerodynamic coefficients under cross wind conditions, by means of a numerical approach known as Large Eddy Simulation (LES). In order to estimate the air flow behaviour around both the infrastructure and the truck, the filtered continuity and momentum equations along with the Smagorinsky-Lilly model were solved. A solution for these non-linear equations was approached through the finite volume method (FVM) and using temporal and spatial discretization schemes. As for the results, the aerodynamic coefficients acting on the truck model exhibited nearly constant values regardless of the Reynolds number. The flat ground is the infrastructure where the rollover coefficient acting on the truck model showed lowest values under cross wind conditions (yaw angle of $90^{\circ}$), while the worst infrastructure studied for vehicle stability was an embankment with downward-slope on the leeward side. The position of the truck on the road and the value of embankment slope angle that minimizes the rollover coefficient were determined by successfully applying the Response Surface Methodology.

Development of Safety Sensor for Vehicle-Type Forest Machine in Forest Road

  • Ki-Duck Kim;Hyun-Seung Lee;Gyun-Hyung Kim;Boem-Soo Shin
    • Journal of Forest and Environmental Science
    • /
    • v.39 no.4
    • /
    • pp.254-260
    • /
    • 2023
  • A sensor system has been developed that uses an ultrasonic sensor to detect the downhill slope on the side of a forest road and prevents a vehicle-type forest machine from rolling down a mountainside. A specular reflection of ultrasonic wave might cause severe issues in measuring distances to targets. By investigating the installation angle of the sensor to minimize the negative effects of specular reflection, the installation angle of lateral monitoring ultrasonic sensor could be determined based on the width of road shoulder. Obstacles such as small rocks or piece of log in a forest road may cause the forest machine to be overturned while the machine riding over due to excessive its posture change. It was determined that the laser sensor could be a part of a sensor system capable of specifying the location and size of small obstacles. Not only this sensor system including ultrasonic and laser sensors can issue a warning of dangerous sections to drivers in forest forwarders currently in use, but also it can be used as a driving safety sensor in autonomous forest machine or remote-control forest machine in the future.

A Study on Safety Improvement of Safety Devices at Entrance of Expressway Tunnels (터널 입구부 안전시설물 안전성 증대방안 연구)

  • Lee, Jeom-Ho;Kim, Jang-Wook;Kim, Deok-Soo;Lee, Soo-Beom
    • International Journal of Highway Engineering
    • /
    • v.10 no.4
    • /
    • pp.235-245
    • /
    • 2008
  • Since rapidly increase of tunnel with increasing of expressway, the study on safety improvement of safety device at entrance of expressway tunnels is necessary. The existence of tunnel occurs more speed reduction than an upward slope by itself, the collision accident of tunnel entrance causes heavier damage than that of general accident on the road. So, many kinds of safety devices such as poly-ethylene barrier, guard-rail are placed on the road side. But these devices affect the drivers as an obstacle. Although there are various safety devices that are placed at tunnel entrance, this study is related to following 2-cases. One is that the poly-ethylene barrier is placed and the other is that a safety devices is not placed. The reason that these two cases are selected, is that poly-ethylene barrier is usually placed at many tunnel entrances and safety devices can affect the drivers as an obstacle. This study is related to the difference of right-hand side clearance between inside tunnel and outside tunnel, too. The average difference observed car speed and VDS(vehicle detect system) speed nearby the tunnel is analysed. Through the statistical analysis of the average difference, this study suggests an alternatives on safety improvement of safety devices at entrance of expressway tunnels. It is concluded that the small difference of right-hand side clearance is desirable to drivers when a poly-ethylene barrier is placed. And when the difference of right-hand side clearance is large, no safety devices is desirable, and when the difference of right-hand side clearance is small, poly-ethylene barrier should be placed to improve safety.

  • PDF

Ultimate Capacity of Guardrail Supporting Pile Subjected to Lateral Impact Load Using Centrifuge Model Test (원심모형실험을 통한 차량방호울타리 지지말뚝의 수평방향 충격하중에 대한 극한지지력)

  • Yun, Jong Seok;Lee, Min Jy;Choo, Yun Wook
    • Journal of the Korean Geotechnical Society
    • /
    • v.35 no.11
    • /
    • pp.25-36
    • /
    • 2019
  • The safety barrier is installed on road embankment to prevent vehicles from falling into road side slope. Among the safety barrier, flexible guardrails are usually installed. The flexible guardrail generally consists of a protection cross-beam and supporting in-line piles. These guardrail piles are installed nearby slope edge of road embankment because the side area of the road is much narrow. The protection cross-beam absorbs impact energy caused by vehicle collision. The pile-soil interaction also absorbs the rest of the impact energy and then, finally, the flexible guardrail system resists the impact load. This paper aims to investigate the pile-soil interaction subjected to impact load using centrifuge model tests. In this study, a single pile was installed in compacted residual soil and loaded under lateral impact load. An impact loading system was designed and developed available on centrifuge tests. Using this loading system, a parametric study was performed and the parameters include types of loading and ground. Finally, the ultimate bearing capacity of supporting pile under impact load was analyzed using load-displacement curve and soil reaction pressure distributions at ultimate were evaluated and compared with previous studies.

Eco-corridor Positioning for Target Species - By Field Surveying of Mammals' Road-Kill - (목표종 생태통로의 위치선정 -포유류 Road-kill 현장조사를 중심으로-)

  • Lee, Yong-Wook;Lee, Myeong-Woo
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.9 no.3
    • /
    • pp.51-58
    • /
    • 2006
  • The purpose of this research presents a method to position and makes the structure for eco-corridors reasonably with collectable analysing results of various effects shown in mammals' road-kill at 429 points. Target animals of this research are Leopard cat, Siberian weasel, Raccoon dog, Korean hare, Eurasian red squirrel, Siberian chipmunk and Water deer. The results derived from the empirical analysis on the contents above are followed. First, according to the results as for Leopard cat road kill analysis, which is designated as Endangered Species Class II, the eco-corridor might be located at near village having stead food in order to decrease the frequencies of road-kill, because its road kill points were mainly collected at 4 lane hilly road with mountain-road-farm area geological type of. Second, because Siberian weasel's road kill was detected at 2 lane hilly road with mountain-road-stream geological type, the eco-corridor might be located at near a mill to decrease road-kill frequencies. Third, the road-kill frequency of Eurasian red squirrel can be reduced when the eco-corridor is located at the area across coniferous tree near 4 lane west sea freeway with mountain-road-mountain. Fourth, the road-kill of Raccoon dog can be reduced when the eco-corridor is located at 4 lane mountain road or hilly road with the geological type having farm land-road-mountain(stream). Fifth, Korean hare's road-kill can be reduced when the eco-corridor is located at grass land across ridge line of mountain, because wild rabbit road kill was happened at 4 lane mountain road or 2 lane mountain road(mountain-road-mountain). Sixth, As for Siberian chipmunk, the eco-corridor might be located at the side slope of mountain road at 2 lane mountain road under the speed of 60km/h with mountain-road-mountain. Seventh, For Water deer, the eco-corridor might be located at 4 lane hilly road with mountain-road-farm land. As for Common otter, Amur hedgehog, Yellow-throated marten, Weasel, it is difficult to specify the proper site of eco-corridor due to the lack of data. Eco-corridors for carnivores might be well located at 4 lane hilly road or 2 lane hilly road with mountain-road-farm land, and the track for herbivores might be well located as a overhead bridge on mountain-road-mountain type across mountains. In order to position eco-corridors for wildlife properly, we have to research animal's behavior with ecological background, and to consider the local uniqueness and regularly collect the empirical road-kill data in long term 3 to 5 year, which can be the foundation for the more suitable place of wild life eco-corridors.

A Study on the Excavation of Tunnel Portal Zone Located at High Steep Slope (급경사 지형에 위치하고 있는 갱구부의 굴착 방안 연구)

  • Kim, Woo-Sung;Lee, Sang-Eun
    • Explosives and Blasting
    • /
    • v.26 no.2
    • /
    • pp.38-44
    • /
    • 2008
  • Recently, planning road construction in South Korea is focused on upgrading of the existing road by rerouting or restructuring. For this, roads under current construction in Korea go for more straight in its alignments and routing. Straight routing makes it all the more required to construct many mountain tunnels and bridges in Korea where mountains are so widely spread. Some portal of mountain tunnel is not rarely planed at high steep slope of mountain valley where it is not easy to secure working space for tunnel excavation. Reverse excavation is an alternative measure for excavation of tunnel portal at high steep slope. Construction in reverse excavation method has three important points requiring careful consideration: 1)planning of pilot tunnel in proper width, height, and length etc., 2)measure against the effect of one-side earth pressure to the direction of tunnel portal, 3)securing tunnel safety against shallow ground condition at portal zone. This paper intends to suggest applicable range of pilot tunnel for reverse excavation at the portal zone located at high steep slope, and shows result of study on the appropriateness of a reverse excavation by means of 3D numerical analysis. Result of 3D numerical analysis for reverse excavation at high steep slope shows that pilot tunneling will be applicable to start from the point $20{\sim}25m$ before the portal from inside the tunnel.

Field measurement and numerical simulation of snow deposition on an embankment in snowdrift

  • Ma, Wenyong;Li, Feiqiang;Sun, Yuanchun;Li, Jianglong;Zhou, Xuanyi
    • Wind and Structures
    • /
    • v.32 no.5
    • /
    • pp.453-469
    • /
    • 2021
  • Snow accumulation on the road frequently induces a big traffic problem in the cold snowy region. Accurate prediction on snow distribution is fundamental for solving drifting snow disasters on roads. The present study adopts the transient method to simulate the wind-induced snow distribution on embankment based on the mixture multiphase model and dynamic mesh technique. The simulation and field measurement are compared to confirm the applicability of the simulation. Furthermore, the process of snow accumulation is revealed. The effects of friction velocity and snow concentration on snow accumulation are analyzed to clarify its mechanism. The results show that the simulation agrees well with the field measurement in trends. Moreover, the snow accumulation on the embankment can be approximately divided into three stages with time, the snow firstly deposited on the windward side, then, accumulation occurs on the leeward side which induced by the wake vortex, finally, the snow distribution reaches an equilibrium state with the slope of approximately 7°. The friction velocity and duration have a significant influence on the snow accumulation, and the vortex scale directly affected the snow deposition range on the embankment leeward side.

Performance Analysis of Electronic Control System for Weeding Implement such as Slope Land (경사지 제초 작업기의 전자제어시스템 성능분석)

  • Park, Won-Yeop;Hong, Sung-Ha;Lee, Jae Min;Lee, Sang-Sik
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.8 no.3
    • /
    • pp.229-238
    • /
    • 2015
  • This study was conducted to develop electronic control system of weeding implement that can operated at various areas such as slope land and inclined road side. The weeding implement consists of five main parts; the electronic control system, the hydraulic system, the main frame, the boom and arm mechanism, and the rotary type weeder. And the weeding implement was developed to be attached by three-point hitch of tractor considering the use of electronic control system. As a result, the electronic control test was conducted with the weeding implement attached to tractor in slope land. The results of the electronic control system test showed satisfactory weeding performance.

Suggestion of the Post-Environmental Evaluation of Road-side Cut Slope after Revegetation Works (도로비탈면 녹화공사의 사후환경평가 항목 제언)

  • Kim, Tae-Kook;Kim, Nam-Choon;Kim, Eun-Bum;Koo, Min-Kyu
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.21 no.4
    • /
    • pp.75-86
    • /
    • 2018
  • This research was thereby made to study and analysis ecological, landscape, and stability qualities of roadside cut Slopes in expressways and national highways that went through revegetation works. Also, evaluation items and framework for integrated assessment of plant structure and restored state for the maintenance were suggested. Following is the summary of the result. firstly, for stabilization of introduced native plant species on roadside cut slops, assessment on the post-project environmental management through long-term monitoring and maintenance works must be made. It signifies a form of authentic recovery and restoration by the native plants. second, current evaluation framework on the test beds is well managed with clear evaluation standards and table while its method of assessing the post management with only test bed results lacks conformity with this study site. Newly developed evaluation framework on the post construction sites is estimated to be used as assessment standards on any roadside construction sites. Third, after site investigation distinction was observed among different revegetating construction types in the long-term perspective. Due to the different duration time of vegetation state between seed-spray measures(degraded in time) and layer-spray measure(maintained), the use of coarse straw-mat mulching work or Coir net was suggested in long term maintenance of cut slopes. forth, segmentation of post environmental assessment is organized into three large categories of "ecological", "stabile", and "landscape" qualities regarding post restoration quality and stability of slope through native plants with which categories marks 50, 30, 20 points of rates. fifth, components of the post environmental assessment were segmented in twelve categories driving results from former experimental construction and newly focused items on site. In the future, it is possible to propose a customized assessment method considering the location and location of construction work if the research on the application of post-environment assessment methods for road construction surface recording is conducted systematically.

Slope Failure Along the Weathered And Mobilized Foliation Plane : Studies for Causes of the Failure and the Supporting Methodologies (풍화된 엽리면을 따라 붕괴된 대절토 사면의 붕괴요인 분석과 보강방안에 대한 연구)

  • Hwang, Sang-Gi;Kim, Young-Muk;Ji, In-Taeg;Jeon, Byoung-Choo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.775-784
    • /
    • 2009
  • Weathered foliation could act as a critical failure plane because this type of plane tend to have low roughness and long extensions. A big constructed slope at $\bigcirc\bigcirc$ road construction site was failed due to the block movement along a fault zone which is parallel to foliation. Tectonic activity reactivated a fault zone parallel to foliation, and the fault clay within the shear zone metamorphosed retrogressively to chrolite. The failed block moved when the block weigh lost the balancing with the resisting force of the retrogressively metamorphosed chrolite. Evaluating the three dimensional distribution of the foliation was critical for establishing a plan for the stabilization of the slope. For this purpose, 10 boreholes were drilled as a lattice distribution, and the BIPS analyses are performed at each boreholes. The fractures measured in the boreholes are projected into 15 cross sections and their distributions are analysed, using Fracjection software. The projection analyse show that the strike of the foliation gets dipper towards left side of the slope. This geometry indicates that there are more failure block geometry at left side of the slope. Potential failure planes are searched using the projection method, and these information are provided for further support design.

  • PDF