• Title/Summary/Keyword: Road Sediment

Search Result 39, Processing Time 0.024 seconds

Effect of forest road establishment based on forest management on occurrence of suspended sediment (산림경영기반의 임도개설이 부유사 발생에 미치는 영향)

  • 이성기
    • Journal of Environmental Science International
    • /
    • v.12 no.3
    • /
    • pp.247-255
    • /
    • 2003
  • Forest management starts from forest road facility, which is designated as generation source of muddy water in mountain stream during initial stage of establishment. Therefore, this study reviewed the effect of suspended sediment generated in forest road surface on the muddy water in mountain stream with respect to marsh area of forest. As a result, characteristics of outflow of suspended sediment was understood, and it was judged that generation of suspended sediment due to establishment of forest road is diluted by mountain stream this charged from drainage area so as to have small effect on muddy water in total mountain stream.

Development and Application of ROADMOD for Analysis of Non-point Source Pollutions from Road: Analysis of Removal Efficiency of Sediment in Road by Sweeping (도로 비점오염 해석을 위한 ROADMOD개발 및 적용: 도로청소 효과 분석)

  • Kang, Heeman;Jeon, Ji-Hong
    • Journal of Korean Society on Water Environment
    • /
    • v.37 no.2
    • /
    • pp.103-113
    • /
    • 2021
  • In this study, an Excel-based model (ROADMOD) was developed to estimate pollutant loading from the road and evaluate BMPs. ROADMOD employs the Chezy-Manning equation and empirical expression for estimating surface runoff, and power function for pollutant buildup, and exponential function for pollutant washoff in SWMM. The results of model calibration for buildup and washoff using observed data revealed a good match between the simulation results and the observed data. The long-term surface runoff and sediment simulated by ROADMOD demonstrated a good match with those by SWMM with 2 ~ 14% of relative error. The shorter sweeping interval (within 8 days) remarkably decreased sediment loads from the road. It was found that the effect of reducing sediment loads from the road was greatly affected not only by the sweeping interval but also by sweeping on the day before a rainfall event. The 48% of removal efficiency of sediment loads from the road was achieved with 26 times of road sweeping per year when sweeping was performed on the day before the rainfall event. A 4-day sweeping interval showed similar removal efficiency (48%) with 96 times of sweeping per year. It is considered that the road sweeping on the day before a rainfall event could maximize the effect of reducing the non-point source pollution from the road with minimization of the number of road sweeping. So, the road sweeping on the day before a rainfall event can be considered as one of the useful and best management practices (BMPs) on road.

Simulation of Surface Flow and Soil Erosion on a Forest Road Using KINEROS2 Model

  • Im, Sang-Jun;Lee, Sang-Ho;Kim, Dong-Yeob
    • Journal of agriculture & life science
    • /
    • v.43 no.4
    • /
    • pp.1-8
    • /
    • 2009
  • The physically based model KINEROS2 was applied to forest road segments for simulating hydrology and sediment production. Data on rainfall amounts, runoff volume, and sediment yields were collected at two small plots in the Yangpyong experimental watershed. The KlNEROS2 model can be parameterized to match the volume of surface flow and sediment yields during seven storm events. Model predictions of hydrology were in good agreement with the observed data at two plots in the year 1997 and 1998. A comparison between the observed and predicted sediment yields indicated that the model provided reasonable estimates, although the model tended to under-estimate for some storm events. The overall result shows that the KINEROS2 model properly represents the hydrology and sediment transport processes in the forest road segments.

Effect of the Forest Road on Suspended Sediment Yield in the Small Forest Watershed (산지(山地) 소유역(小流域)에 개설(開設)된 임도(林道)가 부유사(浮遊砂) 유출(流出)에 미치는 영향(影響))

  • Oh, Jae-Man;Inoue, Shoji;Ezaki, Tsugio;Chun, Kun-Woo
    • Journal of Korean Society of Forest Science
    • /
    • v.88 no.4
    • /
    • pp.477-484
    • /
    • 1999
  • This study was conducted to investigate the effect of forest road on the suspended sediment yield into a stream in the small forest watershed. The samples of suspended sediment yield were collected at surveying points A and B in mountains watersheds unaffected by forest road, and at surveying point C affected by forest road. When hourly change of suspended sediment concentration was investigated, it showed the highest increase along the forest road, and the peak of suspended sediment concentration due to the watershed characteristics of each surveying point occurred before or at the same time with, the peak of discharge. This may be due to the time lag in which stagnated unstable suspended sediment moved strongly upon rainfall. Although suspended sediment load varied depending upon rainfall factors and surveying period, suspended sediment load per unit watershed flowed out 4.1 times more at the point C than at the point A and B. The suspended sediment load on 18~19 September, 1998, strongly affected by rainfall factors, was 4.179g/sec/㏊ at the point C, and 0.343g/sec/㏊ and 0.147g/sec/㏊ at the point A and B, respectively. This load was 12 times higher at the point C than at the point A and 28 times higher than at the point B.

  • PDF

Soil displacement from frost heave on forest road cut-slopes

  • Lee, Myeong-Kyo;Lee, Joon-Woo;Choi, Sungmin;Kim, Hyoun-Sook
    • Korean Journal of Agricultural Science
    • /
    • v.45 no.2
    • /
    • pp.177-184
    • /
    • 2018
  • The frost heave process from repeated freezing and thawing actions in winter on forest road cut-slopes is important for forest road maintenance and management. This study investigated the damages of the forest heave process on forest road cut-slopes by measuring the changes in the road-cut surface elevation and sediment production and by conducting vegetation surveys which were aimed at providing information for forest road maintenance plans. The temperature and humidity differences were determined between the north and south cut-slopes. T-test showed that the north slope had a lower temperature and humidity than that of the south slope. Field observations also confirmed frozen soils on the north slopes, indicating that the north slopes are susceptible to frost heave. Sediment was converted to dry weight per unit area ($g/m^2$). T-test showed that the north slope produced more sediment than that of the south slope. The study confirmed that more frost heave occurred on the north cut-slopes than on the south cut-slopes. Vegetation surveys were conducted on five cut-slope plots. Considering the dominant species found above the cut-slopes, vegetations in all the plots are expected to succeed to pine and oak in the future. The dominant species appearing on the cut-slopes of the study area were exotic species because the elapsed time of the site was only 2 - 4 years.

Analysis of Characteristics and Removal Efficiency of Road-deposited Sediment on Highway by Road Sweeping According to Particle Size Distribution (고속도로 노면퇴적물의 특성 및 도로청소에 의한 입도별 제거효율 분석)

  • Kang, Heeman;Kim, Hwang Hee;Jeon, Ji-Hong
    • Journal of Korean Society on Water Environment
    • /
    • v.37 no.4
    • /
    • pp.286-295
    • /
    • 2021
  • The removal efficiency of road-deposited sediment (SDR) by road sweeping was analyzed by performing particle size analysis before and after road sweeping at four highways during May to December 2019. The SDR accounted for the largest proportion in the range of 250 to 850 ㎛ and the degree of its proportion had an effect on the particle size distribution curve. The particle size distribution of the collected sediments showed a similar distribution at all sites. Below 75 ㎛, the removal efficiency of SDR showed a constant value around 40%, but above 75 ㎛, it increased as the particle size increased. The removal efficiency was 82-90% (average 86%) for gravel, 66-93% (average 79%) for coarse sand, 35-92% (average 64%) for fine sand, 29-69% (average 44%) for very fine sand, 19-58% (average 40%) for silt loading, 10-59% (average 40%) for TSP, 13-57% (average 40%) for PM10, and 15-61% (average 38%) for PM2.5. SDR removal efficiency showed an average of 69% for the four highways. It was found that if the amount of SDR was less than 100 g/m2, it was affected by the road surface condition and had a large regional deviation. As such, the amount of SDR and the removal efficiency increased. The fine particles, which have relatively low removal efficiency, contained a large amount of pollutants, which is an important factor in water and air pollution. Therefore, various measures to improve the removal efficiency of fine particles in SDR by road sweeping are needed.

The design load factor of road structure considering long-term coastal geographic change (해안지형의 장기적 변화에 따른 도로 구조물 설계하중 고려 요소에 관한 연구)

  • Bae, Sun-Hak;Kang, Sang Hyeok
    • Journal of The Geomorphological Association of Korea
    • /
    • v.20 no.1
    • /
    • pp.75-83
    • /
    • 2013
  • Human-induced modifications in coastal area may cause strong geomorphic responses by disturbing sediment supply, transport and deposition regimes. Morever, engineering structure have been built to stabilize coastal change, these effort impact on other morphologic change. In case of coastal area, there are lack of sediment yield data. This study focus on the tendency of long-term shoreline change, estimate method od sediment discharge which is a major factor of coastal change and adduced to way for considering design load influenced to coastal road.

Behavior of sediment from the dam FERGOUG in road construction

  • Benaissa, Assia;Aloui, Zehour;Ghembaza, Moulay S.;Levacher, Daniel;Sebaibi, Yahia
    • Advances in concrete construction
    • /
    • v.4 no.1
    • /
    • pp.15-26
    • /
    • 2016
  • In Algeria, wastes are often stored in such conditions that do not meet standards. Today and more than ever, we really must implement an environmentally management of wastes. Recovery of waste in Algeria has a considerable delay due to the absence of a policy favorable to the development of waste management. But many researchers have shown the possibility to reuse dredged sediments in road construction. Through Europe, recent research works have been already performed on dam sediments. Present study fits into the context of the valorization of dredged sediments from Fergoug dam. They are found in considerable quantities and mainly composed of mineral phases, organic matters and water. The reservoir sedimentation poses problems for the environment and water storage, dredging becomes necessary. Civil engineering is a common way of recycling for such materials. Dredged sediments have not the required mechanical characteristics recommended by the standards as GTR guide (LCPC-SETRA 1992). So as to obtain mechanical performance, dredged sediment can be treated with cement, lime, or replaced materials like quarry sand. An experimental study has been conducted to determine physical and mechanical characteristics of sediments dredged from dam. Then different mixtures of sediment and/or quarry sand with hydraulic binders are proposed for improving the grain size distribution of the mixes. Finally, according these mixtures, different formulations have been tested as alternative materials with dredged sediments.

Effects of Forest Road Construction on Stream Water Qualities(I) - The Variation of Suspended Sediment by Forest Road Construction - (임도개설(林道開設)이 계류수질(溪流水質)에 미치는 영향(影響)(I) - 임도개설(林道開設)에 따른 부유토사량(浮遊土砂量)의 변화(變化) -)

  • Chun, Kun-Woo;Kim, Min-Sik;Ezaki, Tsugio
    • Journal of Korean Society of Forest Science
    • /
    • v.85 no.2
    • /
    • pp.280-287
    • /
    • 1996
  • This study was carried out to investigate the export rate of suspended sediment by different precipitation intensity after forest road construction for torrential streams on three different watersheds with various forest road density(Watershed A : 6.67m/ha, Watershed B : 5.52m/ha, and Watershed C : control) in the Experimental Forest of Kangwon National University. The results were as follows. 1. Closely related to the the amount of rainfall in both 1994 and 1995, the average streanfkiw rate was less than $0.25{\times}10^4m^3/day$ during May and June and $5.0{\times}10^4m^3/day$ during July and August. More than $25{\times}10^4m^3/day$ of streanflow rate was occurred twice in 1994 and seven times in 1995. 2. The amount of suspended sediment in three watersheds was less than standard of drinking water(25mg/l) before road construction with daily rainfall of 74mm, 92mm, and 120mm in 1994, also after road construction with daily rainfall of 21mm and 47mm in 1995. But, under the 192mm of daily rainfall, Watershed C did not show the difference in the amount of suspended sediment, however, Watershed A and B produced 1,525mg/l and 775mg/l, respectively, which is 61 and 31 fold of stabdard of drinking water, and construction to export for 35 hours after rainfall. 3. The maximum amount of suspended sediment was less than the standard of drinking water with light rainfall before and after road construction. Under the 192mm of daily rainfall, the maximum amounts of suspended sediment in Watershed A and B were 13,150mg/l and 2,690mg/l, of 526 and 108 fold of standard of drinking water, respectively, showing obvious water pollution by sedimentation. Results of the study indicated that the forest road construction had great influence on the sedimentation, and getting increased by higher road density and heavier rainfall. Therefore such practices as vegetation covering and soil erosion control facility should be established accompanying with forest road construction to prevent from sedimentation.

  • PDF

Pollutant Contents with Particle Size Distribution in Bridge Road Drainage Sediment (교량도로 배수받이 퇴적물질의 입경별 오염물질 함량)

  • Lee, Jun-Ho;Cho, Yong-Jin;Bang, Ki-Woong
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.29 no.12
    • /
    • pp.1360-1365
    • /
    • 2007
  • The purpose of this study is to present the basic data for nonpoint pollutant loads from bridge road drainage sediments using the results to analyze organic matter and heavy metals from the four bridge drainage sampling sites with sediments of different particle size ranges. The sediment sample was collected from the bridge road drainage and the masses of nine sediments fractions were obtained after drying the separated sediment in an over at $85^{\circ}C:>2,000{\mu}m$, $1,000\sim2,000{\mu}m$, $850\sim1,000{\mu}m$, $425\sim850{\mu}m$, $212\sim425{\mu}m$, $125\sim212{\mu}m$, $90\sim125{\mu}m$, $75\sim90{\mu}m$, $<75{\mu}m$. The sediment extract was analyzed water quality constituents, including chemical oxygen demand(COD), total nitrogen(T-N), total phosphorus(T-P), heavy metals and particle size distribution. The results indicate that most of particle size ranges of the bridge road sediments was $125\sim425{\mu}m$, and portion of $<75{\mu}m$ was low. But most of the pollutants are associated with the finer fractions of the load sediments. As the results of analysis, the range and average values of COD, T-N, T-P, Fe, Cu, Cr, and Pb were $177\sim198.8$ mg/kg(77.6 mg/kg), $23\sim200$ mg/kg(83 mg/kg), T-P $18\sim215$ mg/kg(129 mg/kg), and $1,508\sim5,612$ mg/kg(3,835 mg/kg), $9.2\sim69.3$ mg/kg(49 mg/kg), $19.1\sim662.2$ mg/kg(214 mg/kg), and $28.4\sim251.4$ mg/kg(114 mg/kg), respectively. The relationship between sediment size and pollutants concentration have an inverse proportion. The removal of road sediments with frequently could be reduced the significant nonpoint pollutant load, because of the bridge road sediment contains considerable micro-particles and heavy metals.