• Title/Summary/Keyword: Road Projects

Search Result 318, Processing Time 0.031 seconds

A Study on Estimation of Road and Transportation Facility Improvement Direction Using Random Forest (랜덤 포레스트를 활용한 도로 및 교통시설 개선방향 추정 연구)

  • Hwang, Jae-seong;Kim, Do-kyeong;Kim, Nam-sun;Lee, Choul-ki
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.20 no.6
    • /
    • pp.37-46
    • /
    • 2021
  • Government agencies, such as police and local governments, strive to prevent traffic hazards and create a comfortable road environment by pormoting transportation and road facilities. To this end, roads and transportation facilities are enhanced and adjusted, and improvement projects in areas with frequent traffic accidents are carried out. Usually, improvement projects in areas with frequent traffic accidents vary by projects and region. Moreover, these projects are carried out under the supervision of a person in charge and related parties. Hence, civil complaints and subjectivity are reflected in deriving priorities for the improvement projects, limiting the efficiency of the project. To this end, a study was conducted to estimate the direction of improvement of the project target site. This study comprehensively considered road, traffic, and accident conditions of representative projects with high effectiveness in handling traffic accidents. The results of the study state that the accuracy of estimating the improvement project was around 88%. In addition, the study found that there was a strong relationship between traffic volume, accident rate, and accident severity in estimating the improvement direction.

Review of Railway Projects Evaluation Methodologies considering the Benefit Incidence (편익귀속을 고려한 철도사업의 평가방법론에 대한 고찰)

  • 정병두;박정욱;김경철
    • Proceedings of the KSR Conference
    • /
    • 1999.11a
    • /
    • pp.65-72
    • /
    • 1999
  • In this paper, we reviewed the evaluation methodologies of railway project considering the benefit incidence. Generally railway projects are much more reduced tile energy consumption, traffic accident and environmental pollution than road projects. But conventional B/C analysis of railway project does not measured including those benefits. Also there is a few attention to an incidence of benefits producing from railway construction. So we developed the evaluation method of railway project contained the railway oriented benefits and also considered of the benefit incidence producing from railway construction.

  • PDF

Proposing a BIM Activation Plan in Civil Projects by Investigating Guidelines in Procurement Processes - Proposing Contents of Guidelines to Support BIM Project in the Road Sector - (국내 발주지침 보완을 통한 토목분야 BIM 활성화 전략 제안 - 도로분야 BIM 프로젝트 지원을 위한 과업지시서 구성요소 제안 -)

  • Choi, Go-eun;Lee, Jaewook;Hong, Chang Hee;Moon, Hyeonsuk;Kim, Do Young
    • Journal of KIBIM
    • /
    • v.13 no.2
    • /
    • pp.47-57
    • /
    • 2023
  • The purpose of this study is to propose a guideline to help the client and bidder operate the BIM project in the domestic road field. As BIM design is mandatory in the construction field, documents disclosed by the ordering agency must essentially include procedures and step-by-step requirements to support BIM. The purpose of this study is to propose the structure and components of the guidelines that practitioners need practically by utilizing the currently announced road field guidelines. The guidelines are analyzed based on the procurement documents that were pre-emptively shared overseas, and supplemented according to the domestic situation. Furthermore, the effectiveness of the revised guidelines is confirmed through expert consultation. This study aims to contribute to creating an environment in which construction practitioners who have no experience in BIM project can efficiently carry out BIM projects.

Performance Evaluation Model for Public-Private Partnership Projects - with Reference to BTO (Build-Transfer-Operate) Road Projects - (민간투자사업 성과평가 모델 개발 및 적용 - 도로 부문 사업을 중심으로 -)

  • Park, Hyeon;Park, Inseok;Lee, Shin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.83-95
    • /
    • 2018
  • The aim of this paper is to develop a performance evaluation model for PPP (Public-Private Partnership) projects that appropriately reflects the important traits that are unique to PPP projects. To this end, 1) it defines a set of distinct perspectives involved in the PPP projects and their associated success factors that might differ amongst the perspectives; 2) it identifies the key performance indicators and suggests the performance evaluation criteria for each indicator; and 3) it builds a performance evaluation model by matching the success factors from each perspective with performance measure criteria as well as applies the model to the two selected BTO road projects in Korea. The process of model construction and its application confirms significant differences between the main stakeholder perspectives typically involved in PPP projects, which highlights the need for an evaluation model tailored for PPP projects by taking into account the distinct perspectives. The results from the PPP evaluation model developed in the study is compared against the results from the existing ex-post evaluation model for construction projects in general. The former shows a closer match with the results from the user satisfaction survey conducted. This new evaluation framework and the performance indicators entailed in it permits a balanced evaluation of PPP projects as it takes into account different perspectives involved in PPP projects as well as an understanding of the factors affecting the success of PPP projects. While the construction of the model is based on transport projects, it is applicable to different types of PPP projects through variation with the weight allocation amongst different success factors and/or additions or other adjustments to the performance evaluation criteria as required.

Analysis of Problems and Improvement of Environmental Impact Assessment in Social-Economic Items Based on 19 Major Large Scale Development Projects (주요개발사업의 환경영향평가서 분석을 통한 사회경제항목평가의 문제점과 개선방안)

  • Lee, Sang-Don
    • Journal of Environmental Impact Assessment
    • /
    • v.13 no.4
    • /
    • pp.165-185
    • /
    • 2004
  • Assessment in Socio-economic items should be used to estimate social influence when policies and projects were introduced. To estimate current situation of socio-economic items 19 Environmental Impact Statement (EIS) of large scale projects were analyzed. The projects were selected based on magnitude of social impact when the projects were implemented. Environmental Impact Statement was categorized into line projects(road construction, railroad construction, stream development, etc), and surface projects(energy development, wetland reclamation, recreation and sport development, and housing and residential development, etc) thus being chosen for 19 projects in each categories. This report was based on the analysis of 7 items in socio-economic environmental items(i.e., population, residents, industry, public facilities, education, transport and historical monument). Most EIS did not follow the regulation suggested by Ministry of Environment, and only current circumstances were briefly described. Indifference of in-depth analysis of socioeconomic environmental items would influence the process of social and environment impact negatively in the midst of construction of National Projects such as Outer Circle Seoul Highways, Saemankeum Reclamation Projects, etc. This abrupt halt of construction was mostly based on a lack of public hearing or public participation. Socio-economic items are also very much lacking in quantitative method and strengthening socio-economic environmental items is needed via checklist or matrix that brings decision-makers better ideas objectively.

A Study on the Standard of Cutting and Filling Height to Minimize Topographical Damage in Road Side Construction (도로건설사업 시 지형 훼손 최소화를 위한 절·성토 높이 기준 연구)

  • Kim, Mi-Ri;Kim, Su-Ryeon;Shin, Ji-Hoon;Sung, Hyun-Chan
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.42 no.1
    • /
    • pp.115-122
    • /
    • 2014
  • The purpose of this study is to analyze the relationship between height of cutting and filling as well as the height of slope of roadsides. It also suggests the rational height of slope to minimize topographical damage in road construction. Hence, in this study, 44 cases of expert's opinions related to height of slope in Environmental Impact Assessment(EIA) for road construction projects are reviewed, and 23 cases of data related to height of cutting and filling in EIA for road construction projects are used for analyzing relationship between height of slopes and height of cutting or filling of roadside. The results are as follows; Most of heights of cutting, filling and slope in EIA for road construction are over the required standards 20 or 30m(in case of cutting) and 10 or 15m(in case of filling). It also shows that there is high-level correlation between height of cutting and filling and height of slope of roadside. According to regression analysis, it is suggested that the general standard of each heights of cutting and filling are 25.33~33.23m(in case of cutting) and 14.56~18.08m(in case of filling), but it should be considered in EIA review for road construction projects that these heights suggested in this study are over the required standards.

Improving Road Construction Productivity by Developing a Programmatic Resource Distribution System for Equipment Sharing in Multi-sectioned Road Construction Projects (다(多)공구 도로 건설 현장의 장비 공유시스템 구축을 통한 생산성 향상에 관한 연구)

  • Koo, Bonsang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.134-145
    • /
    • 2013
  • Road construction projects are parcelled into sub-sections which are then tendered to individual contractors for construction. The type of work and equipments used are similar for each sub-section. However, such equipment are not shared on a regular basis among the contractors and only partially performed in an informal and ad hoc manner. Consequently, road construction equipment suffer from low utilization and increased leasing costs. Lean construction and Program Management approaches stress the importance of collaboration among individual participants in a way that increases the collective cost savings of the entire project. This research attempts to apply such theories with the notion that under utilization of expensive equipment can be improved by formalizing a way to enable the sharing of equipment in large, public sponsored, multi-sectioned road construction projects. A system was developed consisting of a set of criteria and processes that enables automatic allocation of equipment to multiple sites on daily basis, in a way that minimizes equipment costs and improves their individual utility. The system was then applied in allocating three different types of equipment to an actual road construction project with four sub-sections for three months. A new metric, nDPR showed that utilization improved for all equipment and also equipment related costs were decreased by 4.45%. Results also showed that increased shared opportunities of equipment correspond to an increase in utilization and cost savings.