Journal of the Korean Society of Hazard Mitigation
/
v.6
no.1
s.20
/
pp.17-27
/
2006
To estimate the retained strength of reinforced concrete structure after fire is very difficult because the complex behavior of structure is hard to understand during course of a fire. However, the damages which is caused by fire of the traffic facility infrastructure are enormous. Therefore the security against fire is important element that must not be overlooked. For this reason, an exact estimate method of the fire endurance is highly demanded. In this study, the validity of the nonlinear finite element method approach for the fire endurance of reinforced concrete structure is verified. The results of fire endurance estimate of underground road way by nonlinear finite element method approach are compared with those by ACI 216R-89.
Landslides are one of the natural disasters that cause a lot of financial and human losses every year It will be all over the world. China, especially. The Mainland China can be divided into 12 zones, including 4 high susceptibility zones, 7 medium susceptibility zones and 1 low susceptibility zone, according to landslide proneness. Climate and physiography are always at risk of landslides. The purpose of this research is to prepare a landslide hazard map using the Hierarchical Analysis Process method. In the GIS environment, it is in a part of China watershed. In order to prepare a landslide hazard map, first with Field studies, a distribution map of landslides in the area and then a map of factors affecting landslides were prepared. In the next stage, the factors are prioritized using expert opinion and hierarchical analysis process and nine factors including height, slope, slope direction, geological units, land use, distance from Waterway, distance from the road, distance from the fault and rainfall map were selected as effective factors. Then Landslide risk zoning in the region was done using the hierarchical analysis process model. The results showed that the three factors of geological units, distance from the road and slope are the most important have had an effect on the occurrence of landslides in the region, while the two factors of fault and rainfall have the least effect The landslide occurred in the region.
The Transactions of The Korean Institute of Electrical Engineers
/
v.60
no.4
/
pp.885-891
/
2011
In this paper, we studied dc leakage current properties analysis of LED lamps of road and landscape lighting when leakage current appeared in dc power line. Generally, converter of LED lighting is divides to insulated type and non-insulated type according to components. When electric leakage happened in AC power line, earth leakage breaker(ELB) senses leakage current and interrupts electric circuit. In dc power source, We need experimental verification about dc electric leakage for electricity safety. In normal wiring conditions and in the water, in case of using insulated type of converter, dc leakage current did not occur. However, in case of using non-insulated type of converter, dc leakage current occurred and passed through into the ground. We found that there is a hazard of electric shock by dc leakage current. We expect that the results of these studies would be helpful for electrical safety of LED lamps for road and landscape lighting.
PURPOSES : This study prioritizes potential technology for establishing a safe work zone environment on roadways. We consider almost all conceivable technologies that enable mitigation of unexpected accidents for both road workers and drivers. METHODS : This study suggests a methodology to set the priority of potential technology for establishing a safe work zone environment by using the analytical hierarchy process (AHP). For this purpose, the AHP structure was first developed. Thereafter, a web-based survey was conducted to collect experts' opinions. Based on the survey results, weights associated with the relevant criteria of the developed structure were estimated. With the consistency index (CI) and consistency ratio (CR), we verified the estimated weights. In addition, a sensitivity analysis was performed to confirm whether the estimated weights were reliable. We finally proposed the priority for potential technology for establishing a safe work zone environment on roadways. RESULTS : In the first level, safety technology has the highest priority, and real-time information delivery for work zone, hazard warning for drivers, and temporal automated operation for traffic facilities were selected in the second level of hierarchy. CONCLUSIONS : The results imply that establishing the priority will be useful to establish a future road map for improving the work environment for road workers and drivers by employing appropriate protection facilities and developing safety systems.
Current methods for evaluating unsignalized intersections, and estimating level-of-service (LOS) is determined from efficiency-based criteria such as little or no delay to very long delays. At present, similar procedures to evaluate intersections using safety-based criteria do not exist. The improvement of sight distances at intersections is the most effective way of improving intersection safety. However, a set of procedures is necessary to account for the limitations in current methodology. Such an approach would build upon such methods, but also account for: deficiencies in the current deterministic solution for the determination of intersection sight distances; opportunity for an accident and severity of an accident; and cost-effectiveness of attaining various levels of sight distances. In this research, a model that estimates the degree of safety at two-way stop-controlled intersections is described. Only crossing maneuvers are considered in this study because accidents caused by the crossing maneuvers are the dominate type among intersection accidents. Monte Carlo methods are used to estimate the hazard at an intersection as a function of roadway features and traffic conditions. Driver`s minimum gap acceptance in the crossing vehicles and headway distribution on the major road are used in the crossing vehicles and headway distribution on the major road are used in the model to simulate the real intersectional maneuvers. Other random variables addressed in the model are: traffic speeds; preception-reaction times of both drivers in the crossing vehicles and drivers in oncoming vehicles on the major road; and vehicles on the major roads. The developed model produces the total number of conflicts per year per vehicle and total potential kinetic energy per year per vehicle dissipated during conflicts as measurements of safety at intersections. Based on the results from the developed simulation model, desirable sight distances for various speeds were determined as 350 feet, 450 feet and 550 feet for 40 mph, 50 mph and 60 mph prevailing speed on the major road, respectively. These values are seven to eight percent less than those values recommended by AASHTO. A safety based level-of-service (LOS) is also developed using the results of the simulation model. When the total number of conflicts per vehicle is less than 0.05 at an intersection, the LOS of the intersection is `A' and when the total number of conflicts per vehicle is larger than 0.25 at an intersection, the LOS is `F'. Similarly, when the total hazard per vehicle is less than 350, 000 1b-ft2/sec2, the LOS is `F'. Once evaluation of the current safety at the intersection is complete, a sensitivity analysis can be done by changing one or more input parameters. This will estimate the benefit in terms of time and budget of hazard reduction based upon improving geometric and traffic characteristics at the intersection. This method will also enable traffic engineers in local governments to generate a priority list of intersection improvement projects.
In case of a fire outbreak in a uni-directional road tunnel, the flow of traffic immediately behind the fire disaster will be stalled all the way back to the entrance of the tunnel. Furthermore, when the vehicle passengers try to flee away from the fire toward the entrance of the tunnel, the extremely hot fume that propagates in the same direction will be fatal to the multitudes evacuating, but may also cause damage to the ventilation equipments and the vehicles, compounding the evacuation process. This paper will present the 3-dimensional modelling analysis of the preventive measures of such a fume propagation in the same direction as the evacuating passengers. For the analysis, the fire hazard was assumed to be a perfect combustion of methane gas injected through the 1 m X 2 m nozzle in the middle of the tunnel, and the product of $CO_2$ as the indicator of the fume propagation. From the research results, when the fire hazard occurred in middle of the 400 m road tunnel, the air density decreased around the fire point, and the maximum temperatures were 996 K and 499 K at 210 m and 350 m locations, respectively, 60 seconds after fire disaster occurred, when the fumes were driven out only towards the exit-direction of the tunnel. By tracing the increase of $CO_2$ level over 1% mole fraction, the minimum longitudinal ventilation velocity was found to be 2.40 m/sec. Furthermore, through Analysis of the temperature distribution graphs, and observation of the cross-sectional distribution of $CO_2$ over 1% mole fraction, it was found that the fume did not mix with the air, but rather moved far in a laminar flow towards exit of the tunnel.
Journal of the Korean Society of Hazard Mitigation
/
v.10
no.2
/
pp.23-30
/
2010
The research presents moisture content measuring and calibration method of road pavement, especially asphalt concrete pavement for performance evaluation or remaining life prediction using Time Domain Reflectometry(TDR) sensor, CS616 made by campbell INC. Before calibration test of CS616, accomplished a sensor verification tests. Verification test items were covering depth and interference effect of two CS616 sensors, temperature effects between $5^{\circ}C\sim25^{\circ}C$ and compaction ratio effects. Covering depth and interference effects between two CS616 sensors were just small and the effects of temperature and compaction ratio effected a Volumetric Moisture Contents at $\pm6%$ under disregard appeared with the fact that was possible. Also, obtained the calibration equation of the subgrade and subbase course, $R^2$ showed above of all 0.9.
Song, Hyun Yeop;Choi, Seung Hyun;Han, Dae Seok;Do, Myung Sik
KSCE Journal of Civil and Environmental Engineering Research
/
v.41
no.4
/
pp.417-428
/
2021
Since future maintenance cost estimation of infrastructure involves uncertainty, it is important to make use of a failure prediction model. However, it is difficult for local governments to develop accurate failure prediction models applicable to infrastructure due to a lack of budget and expertise. Therefore, this study estimated the life expectancy of asphalt road pavement of national highways using the Bayesian Markov Mixture Hazard model. In addition, in order to accurately estimate life expectancy, environmental variables such as traffic volume, ESAL (Equivalent Single Axle Loads), SNP (Structural Number of Pavement), meteorological conditions, and de-icing material usage were applied to retain reliability of the estimation results. As a result, life expectancy was estimated from at least 13.09 to 19.61 years by region. By using this approach, it is expected that it will be possible to estimate future maintenance cost considering local failure characteristics.
Journal of Korean Society of Disaster and Security
/
v.15
no.3
/
pp.31-40
/
2022
Domestic disaster risk maps are mainly produced and studied as a single disaster map by grid unit and disaster type. In particular, it is necessary to present an evaluation method of the disaster risk map that is more suitable for the relevant facility (local road) in order to utilize the work of practitioners who are mainly in charge of facility maintenance. In this study, an evaluation method was presented to evaluate the risk with a focus on local roads by using the landslide risk map and debris flow risk map provided by the Korea Forest Service. In addition, the risk was evaluated and verified for the provinces located in Gangwon-do. As a result of the evaluation, it was possible to evaluate the risk of grades 1 to 5 for 1,513 evaluation sections in the evaluation section with a total length of 234.59 km.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.