• Title/Summary/Keyword: Road Construction Project

Search Result 271, Processing Time 0.027 seconds

Development of safety system for Road Tunnel - The study of Quantitative risk assessment for middle scale road tunnel with natural ventilation system - (도로터널 방재시스템 개발 - 자연환기를 수행하는 중규모 도로터널의 정량적 위험도평가관한 연구 -)

  • Yoo, Ji-Oh;Shin, Hyun-Jun;Kim, Jong-Won
    • Proceedings of the SAREK Conference
    • /
    • 2008.11a
    • /
    • pp.67-70
    • /
    • 2008
  • As a part of the project on road tunnel fire safety system development, Quantitative Risk Assessment program was developed. In this study, We carried out Quantitative Risk Assessment with this program by using a factor of cross passage interval, warning announcement time and congestion ratio etc for 1km tunnel with natural ventilation. In the case of 250m below of cross passage interval, Risk value due to warning announcement time was a slightly changed. but if cross passage interval is more than 250m, expected fatalities in the same HRR(heat release rate) was sharp increased. As a result, Quantitative Risk Assessment program which was developed in this research project is possible to risk assessment with ventilation type, cross passage for evacuation and detection system response property etc. hereafter, this program look forward to use as a tool for road tunnel performance based design.

  • PDF

A Consideration on the Approach of Urban Stream Landscape Restoration - The Case of the Chungkye Stream Restoration Project - (도시하천경관복원 접근방법에 관한 고찰- 청계천 복원사업을 사례로 -)

  • Shin Dong-Hoon;Lee Kyoo-Seock
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.32 no.4
    • /
    • pp.39-48
    • /
    • 2004
  • In the 1960s, polluted urban streams were covered and paved in concrete. Rivers became sewers buried under road. As a result, wildlife habitat was lost and the open stream space was gone. In the 1990s, there was a movement for restoring urban streams to enhance the quality of life of inhabitants. Chungkye Stream, whose covering began from early 1950s and ended in 1977, is now in the process of restoration together with the Central Business District (CBD) Redevelopment Plan. However, as the construction proceeds, several problems were raised, and serious controversies resulted. Therefore, this study aims to investigate the validity of the approach of the Chungkye Stream Restoration Project through a literature survey and a site survey, and to present the improved alternative. Ultimately, the study aims to contribute to present references or guidelines for similar urban stream restoration projects. The Chungkye Stream Restoration Project has some of the following problems. First, the construction should be done based on the long-term urban redevelopment plan. Second, the construction period should be extended to restore urban streams. Third, the cultural asset conservation plan should be implemented. In order to fulfill the anticipated purpose, the above mentioned problems need to be solved.

Development of CITIS Model and Analysis of Its functionality as a Collaborative Virtual Factory for Construction Projects (건설프로젝트의 협업적 가상기업으로서의 CITIS 모델개발 및 성능분석에 관한 연구)

  • Han Seung Heun;Chin Kyung Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.2 s.10
    • /
    • pp.87-98
    • /
    • 2002
  • Korea government is making an effort to improve the efficiency in construction industry by introducing CITIS (Contractor integrated Technical Information Service). In order to provide a base for the application of CITIS into the construction industry, this research provides a concept of virtual factory which should be incorporated into CITIS system for the successful collaborative work in the virtual space. It then implements a prototype system through process and data modeling to apply into the road construction projects. The prototype system is tested to verify its efficiency. Finally, lesson learned from these works is provided to advance the current CITIS toward a collaborative virtual factory.

UAV-based Construction Site Monitoring and Analysis System Development for Civil Engineering Management (토목현장에서의 무인비행장치 기반 현장정보 취득 및 분석 시스템 개발)

  • Kim, Changyoon;Youn, Junhee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.4
    • /
    • pp.549-557
    • /
    • 2022
  • Due to harsh conditions of construction site, understanding of current feature of terrain and other infrastructures is critical issue for site managers. However, because of difficulties in acquiring the geographical information of the construction sites such as large sites and limited capability of construction workers, comprehensive site investigation of current feature of construction site is not an easy task for construction managers. To address these circumstances of construction sites, this study deduce difficulties and applicabilities of unmanned aerial vehicle in the area of construction site management. To confirm applicability of UAV in civil construction project, case study have been conducted on the road construction project. The result of case study proved that the developed system is one of promising technologies that has been studied in construction site management. To improve applicability of UAV for construction and process management information, law and technical issues will be an important area of future study.

A STUDY ON THE LIFE-CYCLE FOR SELECTING A GRATING

  • Yun-Sik Kim;Dong-Wan Kang;Taehoon Hong;Chang-Taek Hyun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1189-1194
    • /
    • 2009
  • A gutter-shaped U grating is a facility that is installed at the sides of a road to provide pedestrians with a rainwater-free road. The previous studies on this facility focused mainly on the progress of the efforts that are being made to improve its performance and interception efficiency so as to prevent damages in regional areas due to the heavy rains caused by climate change. The studies on its maintenance, however, are still inadequate. Therefore, this study was conducted to analyze and compare the life cycle costs and performance evaluations of the steel and magic gratings, which are installed in apartments. The results of the study show that the replacement period and rate of gratings differ depending on where they are installed. The initial capital investment cost of a magic grating installed at a road where many vehicles pass is quite high, but in terms of its maintenance and entire-life-cycle costs, its total expenses are lower than those of a steel grating. The results of this study are expected to serve as preliminary data for the selection of an adequate grating that is suitable for particular places in the design phase of construction projects.

  • PDF

Development of VR Simulation Functions for Supporting Optimal Design Information in Road Project (도로공사의 최적 설계정보 지원을 위한 VR시뮬레이션 기능 구축)

  • Kang, Leen-Seok;Moon, Hyoun-Seok;Park, Seo-Young;Bae, Cheol-Won;Kim, Min-Ji
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.662-665
    • /
    • 2008
  • This research attempts to develop 4D CAD function to support optimal road design by expanding the existing 4D CAD utilization system, which focused on construction phase, to the design phase. The functions such as earthwork simulation for selecting of road alignment, alternative route simulation and structure type simulation were suggested as functions to support road design. Through those virtual reality (VR) functions, visual confirmation of the condition of route and earthwork Is possible by the developed system, and an optimal alternative route can be selected by carrying out layout simulation of the alternative route. The functions presented in this research provide the decision making tools based virtual model for efficient support to road design.

  • PDF

Design Improvement of the Road Expansion on a Deep Thick Soft Ground (대심도 연약지반 도로확장 공사에서의 설계 개선)

  • Kim, Tae-Hyung;Park, Tae-Young;Kim, Sung-Ryul;You, Sang-Ho;Kim, Kook-Han;Kim, Yun-Tae
    • Journal of the Korean Geotechnical Society
    • /
    • v.28 no.8
    • /
    • pp.89-99
    • /
    • 2012
  • The expansion of a road on soft ground could induce an additional settlement to the existing road because of the consolidation characteristics of the soft soil layer subjected to additional load by an adjacent banking. In such case, the existing road could be faced with various problems during the stages of the construction and maintenance, such as deterioration of not only the surface smoothness yielding the decrease in automobile performance safety but also the structural stability of the embankment. These kinds of problems are expected to occur more freguently especially for the deep ground level with a fairly thick soft soil layer. Therefore, they should be examined and studied adequately during the design stage. As a reference case study, this paper deals with the project named Namhae Expressway of 2nd Branch with the soft soil layer with the thickness upto about 50m. After a lengthy review of the original design, an improved design is proposed.

Case Study and Standard Process Analysis of Change Order in Design for Road Tunnel Project (터널공사 사례분석에 의한 설계변경 표준프로세스 구성방안)

  • Kang Leen-Seok;Kim Dong-Kwang;Jung Won-Myoung;Lee Seung-Ryul;Kim Hyun-Soo
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.1149-1152
    • /
    • 2005
  • Recently, tunnel structure is being widely used in railway or roadway construction projects because earthwork causes large cutting and damages in environmental factors. However, there are many changes of design by different items comparing with design phase in tunnel structure by uncertain drawings. This study develops a standard process for the change of design to reduce change orders in construction phase.

  • PDF

Merits and Demerits of the Inspection System introduced in Construction of City Planning Road: In Case of Crossing Road of the Aioiyama Green Area in Nagoya

  • Yutaka Okamura
    • Journal of the Korean Institute of Landscape Architecture International Edition
    • /
    • no.2
    • /
    • pp.178-184
    • /
    • 2004
  • The Yatomi - Aioiyama line is a city-planning road that was notified in 1957 and subsequently prepared by land readjustments. Currently, approximately 900m of road pass in the inside of the Aioiyama green area has not been constructed. The surveying briefing session for inhabitants was held in July 1992, the project was authorized by the Ministry of Land, Infrastructure and Transport in September 1993, and the project briefing session for inhabitants was held in September 1993. The site purchase has been completed. At the May 2000 briefing session, inhabitants of the area began voicing dissenting demanding the conservation of the natural environment of this green area. The inspector system serves as the third party, independent of both the administration and the inhabitants. Before finalizing the geometric line form of the road to be constructed, some surveys of animals and plants found along the walking trails carried out intensively in the northern area, which is approximately 50 ha, of the Aioiyama green area. The natural environment inspector submitted a plan for changing the geometric line form of the road decided upon by city planning, and it was approved by the city planning council. If the shelter structure or the retaining wall structure is adopted at the location where large slope faces are produced by excavation or landfill, and if the bridge structure is adopted at the place where stream-lines and walking trails intersect, it leads to a reduction of approximately $40\%$ in the areas for which change is planned. Furthermore, approximately $20\%$ of the area to be changed is restored by returning soil to the roof of the shelter.

  • PDF

Proper Estimating Method for Environmental Preservation Cost in Road Projects (도로공사 환경보전비의 적정 산출 방안)

  • Park, Ji-Sun;Lee, Sea-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.3-10
    • /
    • 2012
  • The current enforcement regulation of "Construction Technology Management Act" prescribes calculation standard of environmental preservation cost in construction site. According to this standard, environmental preservation cost is calculated by using the quantity-per-unit costing method or applied fixed rate on direct cost. However, when calculated by using the quantity-per-unit costing method it is few items to put in the budget according to standard of construction estimate and in the case of using the fixed rate on direct cost it is not considering various characteristics of the construction site. Therefore, it is needed a improvement plan of estimating method and management system for environmental preservation cost. In this study, it surveyed the actual state of the environmental preservation cost according to magnitude of project, site location, anti-pollution facilities and etc. over 38 road projects. The research reported in this paper environmental preservation cost was variously distributed over construction sites. Thus it needs to estimating method and management system to consider characteristics of construction site for environmental preservation cost.