• Title/Summary/Keyword: Road Construction Project

검색결과 272건 처리시간 0.024초

Construction of a 300-Meter Vertical City: Abeno Harukas

  • Mizutani, Kenichi;Hirakawa, Kiyoaki;Nakashima, Masato
    • 국제초고층학회논문집
    • /
    • 제4권3호
    • /
    • pp.199-207
    • /
    • 2015
  • Abeno Harukas is the tallest building in Japan and is located in Abeno, which is one of the three main railway transport nodes in Osaka. This building has a height of 300 meters, and its lowest levels are 30 meters below ground. It contains a department store, museum, offices, a hotel, and an observatory. In this urban renewal project, a section of the department store that encloses the station was dismantled and replaced by a supertall building complex, while infrastructure was simultaneously constructed, including: upgrades to the station and the existing department store, improved connections to the subway and pedestrian bridges, and a new pedestrian walkway over the road. In this paper, the ingenious erection processes, newly developed technologies, and precise construction management techniques are introduced for Japan's tallest building.

도로건설사업의 생애주기별 정보를 이용한 건설사업정보 통합관리방안 연구 (A Study on Project Information Integrated Management Measures Using Life Cycle Information in Road Construction Projects)

  • 김성진;김범수;김태학;김남곤
    • 한국산학기술학회논문지
    • /
    • 제20권11호
    • /
    • pp.208-216
    • /
    • 2019
  • 건설공사는 기획-설계-시공-유지관리 등 생애주기에 따라 다양한 많은 정보를 발생시킨다. 도로 등 SOC 공공건설공사는 최소 5년에서 10년이상 기간동안 공사가 이루어짐으로서 공정·공사비 등 사업이력에 대한 정보관리가 중요한 실정이다. 또한, 도로건설사업의 생애주기별 정보 관리를 통해 최초 계획했던 목표대로 공사가 수행되었는지 확인하고 유사공사에 반영할 수 있도록 건설정보의 선순환 구조체계로의 전환이 필요하다. 민간건설공사는 건설사에서 계획부터 준공까지 전반적인 정보관리를 수행하는데 반해, 공공건설사업은 각기 다른 기관 또는 부서에서 업무를 수행함으로서 정보의 통합관리가 어려운 실정이다. 특히, 공공건설 중 일반국도의 경우 건설사업정보시스템에서 건설사업정보를 관리하고 있으나, 세부시스템별로 개별 관리함으로서 정보 단절로 인해 통합적인 모니터링을 할 수 없는 실정이다. 따라서, 본 연구는 일반국도 건설사업의 생애주기별 발생 정보를 종합적으로 관리할 수 있도록 정보 통합관리방안을 제시하였다. 이를 위해 건설관련 정보시스템 현황을 조사하고, 기존 건설사업정보시스템을 분석한 후, 표준화 절차에 따라 용어, 단어, 도메인을 정의하였다. 그 결과, DB 표준화에 따라 세부시스템의 DB를 통합하고 개별 관리되던 사용자정보를 통합하며 디브레인과의 연계를 통해 사업예산 기반의 정보관리가 이루어질 수 있도록 정보시스템을 개선하였다.

실적공사비가 적용된 제주도 도로공사의 물가변동률 영향 분석 (Analysis of Road Construction Projects' Escalation under Historical Data-Based Estimate System in Jeju)

  • 홍정호;이동욱
    • 대한토목학회논문집
    • /
    • 제34권2호
    • /
    • pp.667-676
    • /
    • 2014
  • 본 연구는 제주특별자치도 내 실적공사비가 적용된 도로현장을 중심으로 물가변동에 따른 실적공사비 등락률 산정의 문제점을 분석하기 위하여 실시되었다. 본 연구를 위하여 제주특별자치도 내 9개 도로공사 현장을 중심으로 실적공사비방식, 표준품셈방식, 건설공사비지수방식에 따른 등락률을 비교 분석하였다. 분석결과 9개 현장 중 약 56%인 5개 현장에서 실적공사비의 지수조정률이 표준품셈과 건설공사비지수의 지수조정률에 비해 낮게 산정되었다. 이는 실적공사비가 적용됨에 따라 물가변동으로 인한 계약금액 조정 성립요건이 지연되고 있다는 것을 알 수 있으며, 이에 따라 공사 준공 전 물가변동으로 인한 계약금액 조정횟수의 감소와 함께 물가변동금액 역시 차이를 보일 수 있음을 의미한다. 또한, 건설공사비지수 사례분석 결과, 도로부문에 대한 지수를 적용하여 지수조정률을 산출하였으나 지수조정률이 2.0%~9.4%까지 산정되어 이는 공사금액 및 물가변동 적용시기에 따라 상당한 영향을 미치는 문제점이 나타났다.

교통/도로 기본지리정보 구축에 관한 연구 (Study on Construction of Transportation/Road Framework Data)

  • 유환희;김의명;김성삼;조정운
    • 대한공간정보학회지
    • /
    • 제9권1호
    • /
    • pp.27-38
    • /
    • 2001
  • 1995년 국가GIS사업이 추진된 이래 수치지형도를 활용한 GIS 구축사업이 활발하게 진행되고 있으나, 수치지형도의 기하학적 결점 및 위상관계가 정립되어 있지 않아서 GIS 구축 시 바로 활용할 수 없는 실정이다. GIS 선진국에서는 속성 자료와 공간 자료간의 위상이 정립된 자료를 GIS 사용자들에게 제공해주고 있는데, 이 자료를 프레임워크 자료(Framework Data) 즉, 기본지리정보라 하며 공간정보의 가장 핵심적이고 기본이 되는 자료로 활용하고 있다. 본 연구에서는 국가 공간정보의 기본도가 되는 국가기본지리정보의 범위와 정의를 설정하였으며, 기본지리정보 중 도시기반정보구축에 있어 가장 핵심이 되고 기준이 되는 교통/도로 기본지리정보 구축과 품질관리 방안에 관한 연구를 수행하였다.

  • PDF

도로관리통합시스템을 위한 도로영상 데이터베이스 구축 방안 (Construction Strategy of Road Imagery Database for the Highway Management System)

  • 정동훈;성정곤
    • Spatial Information Research
    • /
    • 제14권1호
    • /
    • pp.1-13
    • /
    • 2006
  • 한국건설기술연구원에서는 기존의 도로현황을 더욱 빠르고 정확하게 파악하기 위해 전국의 일반국도에 대해 매 10m 간격으로 2매의 고해상도의 칼라 영상을 취득하고 이를 도로관리통합시스템에 제공하는 사업을 수행하고 있다. 현재는 경기, 강원, 충청지역의 일반국도 영상을 도로관리통합시스템에서 제공하고 있으며 2006년 상반기까지 전국으로 확대할 계획이다. 본 논문에서는 취득한 위치자료와 영상자료를 일대일로 매칭하거나 노선별로 취득한 자료를 국도유지건설사무소별로 재구성하는 것과 같이 도로영상수집차량을 이용하여 수집한 영상을 데이터베이스화하는 전 과정에 대해 기술하였다.

  • PDF

1차로 전면차단 후 도로포장 보수방법의 효과분석 (김천~선산 사례중심) (Evaluation of a Traffic Lane Closure and Pavement Repair for a Certain Period (Focusing on the Gimcheon~Sunsan Project))

  • 류성우;박권제;한승환;최인구;조윤호
    • 한국도로학회논문집
    • /
    • 제18권3호
    • /
    • pp.11-19
    • /
    • 2016
  • PURPOSES : This study supports the evidence that it is possible to rehabilitate a damaged pavement with a lane closure specifically based on the Gimcheon~Sunsan project. METHODS : The prediction results from the simulation programs were compared with field monitoring, which focused on traffic management planning, congestion (length, time, and passing speed), bypass, and user cost, among others. RESULTS : The research results showed that lane closure application and pavement repair of the aged pavement in Korea were possible, even though the prediction results were minimally different from the field monitoring. The road agency contributes to service life extension of the rehabilitated pavement using this method. CONCLUSIONS : A marginal effect caused by the lane closure was observed on travelling users or vehicles, and the user cost of pavement repair decreased. Therefore, introducing the repair method or rehabilitation in Korea is possible. Information dissemination through various media was properly done to execute the project well. Moreover, the construction area traffic utilized nearby alternative roads. Therefore, improving the repaired pavemen's service life while ensuring that the pavement management agency can provide a road with comfortable user riding quality was possible.

도로공사의 공정 및 공사비 연계활용을 위한 디지털 수량산출정보시스템(QDBS) 개발 연구 (A Study on developing WBS based QDBS(Quantity Database System) for the schedule and the cost data integration for road construction project)

  • 윤석헌;김성식
    • 한국건설관리학회논문집
    • /
    • 제8권4호
    • /
    • pp.119-127
    • /
    • 2007
  • 공정 및 공사비는 건설사업관리에 있어서 가장 중요한 정보들로써, 건설사업관리는 이들 정보를 얼마나 효율적으로 관리하는지에 달려 있다. 국내에서는 아직 체계적인 공정관리가 정착되지 못하였으며, 공사비와의 연계관리 또한 정보의 연계성 부족과 많은 노력의 필요로 인하여 실용성이 부족한 형편이다. 본 연구에서는 공정, 공사비 정보의 연계관리를 위하여, 도로공사를 대상으로 사업초기단계부터 공통작업분류체계를 기준으로 디지털수량산출정보(QDB)를 작성하는 방안과 이를 기반으로 하는 디지털 수량산출정보시스템(QDBS)을 제안하고자 한다.

Effect of Inadequate Design on Cost and Time Overrun of Road Construction Projects in Tanzania

  • Rwakarehe, Eradius E.;Mfinanga, David A.
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권1호
    • /
    • pp.15-28
    • /
    • 2014
  • Completing road construction projects within the budget and time has been a problem for the Tanzania National Roads Agency (TANROADS); and the major problem highlighted in almost all projects being inadequate design. However, the extent to which inadequate design contributes to both time and cost overruns and its causes remained under-studied. The objective of this study is therefore to determine the extent of the effect of inadequate design, its causes and remedial measures. The methodology used in this study includes reviewing recent projects completion reports, holding roundtable discussions with consultants and TANROADS officials and analyzing the information. Cost and time overruns for the reviewed projects averaged 44% and 26% respectively. Similarly, the extents to which inadequate design contributes to cost and time overruns were on average found to be 61% and 85% respectively. The overruns are predominantly related to problems that occurred during the design process. To alleviate the problem, TANROADS is advised to improve the management of design projects, enhance the process of reviewing design reports, improve the design process including introducing Road Safety Audit and geometric design manuals, and increase staff to match the work-load.

도로개발 사업이 외래식물 유입에 미치는 영향 (Impact on Introduction of the Alien Plants by Road Development Projects)

  • 추연수;김중권;이효혜미
    • Ecology and Resilient Infrastructure
    • /
    • 제4권3호
    • /
    • pp.156-168
    • /
    • 2017
  • 도로 및 철도 건설과 같은 선형개발은 외래생물의 확산에 중요한 요인으로 고려된다. 본 연구는 도로사업 수행이 외래식물 유입에 미치는 영향을 파악하기 위하여, 한강유역환경청 관할 사업 (80개 사업) 중 현재 공사가 70% 이상 진행 중이거나 완공된 도로사업장을 대상으로 공정률에 따른 외래식물 변화를 연구하였다. 공정률은 공사 전 (P0)과 공사 중 (P25, P50, P75, P100)의 5단계로 구분하였다. 공사가 진행됨에 따라 귀화율, 도시화지수 및 외래식물 종수가 증가하였다. 특히 외래식물은 공사 초기에 급속히 유입되고 유입종은 공사가 완료될 때까지 지속적으로 출현하는 경향이었다. 그러므로 도로사업장의 외래식물 관리를 위하여 공사 초기에 성토 공정과 식생복원 공정을 집중관리하여 외래식물 유입을 최소화시킬 필요가 있다고 생각된다.

고가 구조물 건설에 따른 일조권 분석 (Analysis of the right to sunshine for elevated structure construction)

  • 강기수;김상석;양승태;강인준
    • 한국측량학회:학술대회논문집
    • /
    • 한국측량학회 2004년도 춘계학술발표회논문집
    • /
    • pp.485-490
    • /
    • 2004
  • Recently, distribution transfer velocity was extremely lowered by high supply rate of vehicle and low road rate. Therefore expansions of transfer network these were subway, road and railway to recover competitive power as a reform measure of physical distribution traffic were become preference previous subject. For reason of that, an expansion of transfer network is meeting competitive power as selected an elevated road in the ground road network that condition of location calm and get out of the existing urban than the underground road to connect oversensitive a large city and expanded small and medium satellite town. In the meantime, while elevated structures construct, they go through the civilian residential section, agriculture land, etc. The consequence is that it raises a vibration, noise, dust, an infringement of the right to a view and an infringement of the right to a sunshine. In this study, we analyzed Quantitatively sunshine quantity with building 3D simulation model of civil structure. Therefore, we present as planning data to reduce a civilian appeal for dispute of the right to sunshine and an economic and time loss between the government and construction company In addition to that, for the standard of the standard plan of usable sunshine quantity program in the practical business, the building of convenient user interface will be the project to be done.

  • PDF