• Title/Summary/Keyword: Road Construction Project

Search Result 271, Processing Time 0.025 seconds

GREENHOUSE GAS EMISSIONS FROM ONSITE EQUIPMENT USAGE IN ROAD CONSTRUCTION

  • Byungil Kim;Hyounkyu Lee;Hyoungbae Park;Hyoungkwan Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.286-291
    • /
    • 2011
  • Onsite usage of construction equipment accounts for a 6.8% of air pollution in Korea. The high concentration of carbon dioxide in such emissions impact not only climate change, but also people's health. However, greenhouse gas emissions from onsite equipment usage have not yet been fully investigated. This study presents a comparative analysis on how much greenhouse gas is generated by various equipment types used in different construction activities. Two ongoing cases which involve a typical road construction project in Korea were selected for the comparison purpose. Greenhouse gas emissions from each onsite equipment usage of the different activities were estimated on the ground of design documents. The estimates were compared and analyzed to derive the main sources of greenhouse gas emissions. The result showed that earthwork constituted the largest part-more than 90%-among work types. Dump truck, bulldozer, and loader were major sources for such emissions. The study results are expected to be used as a basis for reduction of greenhouse gas emission from onsite equipment usage.

  • PDF

ESTIMATING COSTS DURING THE INITIAL STAGE OF CONCEPTUAL PLANNING FOR PUBLIC ROAD PROJECTS: CASE-BASED REASONING APPROACH

  • Seokjin Choi;Donghoon Yeo;Seung H. Han
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1183-1188
    • /
    • 2009
  • Estimating project costs during the early stage of conceptual planning is very important when deciding whether to approve the project and allocate an appropriate budget. However, due to greater uncertainties involved in a project, it is challenging to estimate costs during this initial stage within a reasonable tolerance. This paper attempts to develop a cost-estimate model for public road projects under these circumstances and limitations. In the conceptual planning stage of a road project, there is only limited information for cost estimation, for example, such input data as total length of the route, origin and destination, number of lanes, general geographic characteristics of the route, and other basic attributes. This implies that the model should individuate suitable but restricted information without considering detailed features such as quantity of earthwork and a detailed route of a given condition. With these limited facts, this paper applies a case-based reasoning (CBR) method to solve a new problem by deriving similar past problems, which in turn is used to estimate the cost of a given project based on best-fitted previous cases. To develop a CBR cost-estimate model, the authors classified 8 representative variables, including project type, the number of lanes, total length, road design grades, etc. Then, we developed the CBR model, primarily by using 180 actual cases of public road projects, procured over the last decade. With the CBR model, it was found that the degree of error in estimation can be reasonably reduced, to below approximately 30% compared to the final costs estimated upon the completion of detailed design.

  • PDF

Government's Roles in Public Private Partnership Toll Road Projects

  • Rohman, Mohammad Arif;Doloi, Hemanta;Heywood, Christopher
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.381-385
    • /
    • 2015
  • This research aims to investigate critical factors of the government's role in achieving success in Public Private Partnership (PPP) toll road projects in Indonesia according to government and private sectors' perceptions. A preliminary interview Subsequently a questionnaire survey was also conducted involving 143 respondents across the two sectors from eight operating toll were five critical factors of the government's roles in achieving success in PPP toll road projects, namely; "Active involvement in overall project stage activities", "Establishment of good bureaucracy", "Provision of conducive environment", "Appropriate project planning and competitive tendering" and "Provision of appropriate government support and supervision". This research finding is expected to assist the government in defining clear roles and underlying responsibilities in development of PPP toll roads in Indonesia.

  • PDF

Impacts of Rural Road Project on the Social and Economic Activities of Community People (농어촌도로사업이 지역사회 주민의 사회.경제 활동에 미치는 영향)

  • Hong, Chan-Sun;Im, Sang-Bong;Huh, Yoo-Man
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2003.10a
    • /
    • pp.95-98
    • /
    • 2003
  • The objectives of the study are to analyze the impacts of rural road project on the social and economic activities of community people, offer basic data to perform evaluation of the project, and suggest future directions of the project. Research methodology adopted is a questionnaire method. There were interviewed 281 adult residents selected from 34 villages in Yeongdong-gun(mountainous), Miryang-si(middle), and Gochang-gun(plain). Results of the study are as follows: 1) Increase of income and land prices in mountainous and middle regions by the rural road project is higher than in plain; 2) Most inconvenient road expressed by the interviewee is the one linking farm and residence and 3) The problems of rural roads derived are narrowness, unpavement and partial pavement, unreliable maintenance, and long construction time. In order to meet the community needs on rural roads, it may be necessary that community people participate in the process of the project. And it is desirable to put priority on expanding and paving existing roads rather than constructing new one.

  • PDF

Development of VR Simulation Algorithm and System for Supporting Optimal Road Design Information (가상 시뮬레이션에 의한 도로설계정보 최적화 방법론 및 지원체계 개발)

  • Moon, Hyoun-Seok;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.101-110
    • /
    • 2009
  • The current virtual reality(VR) simulation functions in construction project are focused on the construction phase. This study attempts to extend the application of VR functions to the design phase. This study suggests various VR functions such as earthwork simulation by road alignment, alternative route selection simulation, structure type selection simulation and underground structure visualization simulation. These functions can visualize road route and earthwork condition and select an optimal design route by simulating virtual placement of alternative route. This study configures systematic methodology for suggested VR simulation functions and develops VR system by the functions. Finally this study suggests an improved design process of road construction project by using the developed VR functions

Framework to Compute Vehicle Emission Costs Associated with Work Zones

  • Shrestha, K. Joseph;Adebiyi, Jeremiah;Uddin, Mohammad Moin;Sturgill, Roy
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.952-959
    • /
    • 2022
  • Active construction work zones will result in longer travel time and/or longer travel distances for road users because of reduced speed limits and/or detours. This results in increased fuel consumption and increased emissions of harmful gases such as Carbon Monoxide (CO), Nitrogen Oxides (NOx), and Sulfur Oxides (SOx), which causes discomfort to the environment and road users around the work zone. The impact of such emissions should be considered while designing work zones or determining the number of days the roadway will be allowed to be closed partially or fully. This study develops a methodology to compute additional road user costs associated with such work zones. To achieve this goal, a) an extensive literature review is conducted, b) a framework to compute emission cost is developed, c) emission rates are computed for all counties (95) of the state of Tennessee, and d) a case study is conducted to demonstrate the use of the framework to estimate the additional impact of emission because of the work zone. For the case study conducted, the emission cost was computed to be $10,653.60 for the duration of the project. State DOTs can account for such road user costs while selecting contractors using A+B bidding. Accounting for such impact of emission will also indicate the agency's willingness to consider sustainability as a part of the business practices.

  • PDF

Analyzing Planning Performance of Road Construction Projects Using Preliminary Feasibility Analysis Data (예비타당성조사 결과를 활용한 도로건설사업의 계획단계 성과 분석 연구)

  • Mun, Junbu;Yun, Sungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.1
    • /
    • pp.3-11
    • /
    • 2023
  • According to the post evaluation scheme in Korea of a public construction project which is more than 30 Billion KRW, project performance is evaluated by investigating outcomes and effects of the construction after the completion of the project. The current post evaluation results can be used for planning and estimating a construction project in the future. However, it is not easy to utilized for an on-going project because the system does not provide the phase-based performance of a project. Although project planning performance is important for project initiation, few attempt has been made to evaluate planning performance in Korea. The purpose of this study is to provide a conceptual performance evaluation of planning performance using preliminary feasibility study conducted by Korea Development Institute. This study developed a planning performance database using data extracted from preliminary feasibility study reports of the completed 354 road construction projects. This study analyzed the performance of the planning stage of road projects by developing absolute metrics such as standard construction cost and standard construction schedule based on a Lane-Km. Using the standard construction cost and schedule metrics, the planning performance was analyzed by project characteristics. The results of this study can be used for phase-based performance evaluation from planning phase to construction phase.

A Study on Criteria for investment Priority of Railway Project (철도건설 투자우선순위에 관한 연구)

  • Park, Il-Ha;Park, Yong-Gul;Kim, Si-Gon
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.112-116
    • /
    • 2008
  • Determining the investment priority of the railway project is essential to keep its object of railway investment. [National railway construction plan] provide 4 major evaluation indicators and their weighting range in determining the investment priority of railway construction. Which are investment efficiency, inter-regional balance of development, network effects, government supporting policy. However this present criteria has inconsistency in determining economical feasibility of the railway transportation when applying the same evaluation indicator, investment efficiency, with the road transportation. The railway transportation is superior to road transportation in terms of transportation capacity and distance, while offering less carbon emissions. In spite of the prominent position of the railway transportation, it can be failed to obtain its proper investment priority when being determined under economical feasibility based. Therefore, this study analyzed the inconsistency under present evaluation criteria and proposed new evaluation method for the investment priority of the railway construction using AHP(analytic hierarchy process), while differentiate from the road construction. This method is optimized for only determining the priority of the railway construction itself under object of railway investment respectively.

  • PDF

Cost Estimation Model Framework of Road Construction Project through Quantity of Standard Work (대표물량을 활용한 도로공사 개략공사비 산정모델 프레임워크)

  • Kwak, Soo-Nam;Kim, Du-Yon;Han, Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.607-612
    • /
    • 2007
  • Early cost estimation promote efficient budget plan by comparing alternatives and presenting cost information However it is hard to predict accurate cost because of vague cost standard and lack of available information in the early stage. The precious cost model has limitations in the accuracy because they are simple linear model which uses the unit cost per kilometer. This study presents the framework of early cost estimation for road construction projects to overcome the limitation of previous cost model. This study analyzed domestic and foreign cost model and cost data of previous road construction project to present method of cost model framework.

  • PDF

A Study on Development of Remote Site Monitoring System in Public Road Construction Projects (공공 도로건설사업에서의 원격 현장모니터링 체계 구축에 관한 연구)

  • Ok, Hyun
    • International Journal of Highway Engineering
    • /
    • v.14 no.6
    • /
    • pp.57-65
    • /
    • 2012
  • PURPOSES : Efficiency Improvement of a public road construction project management work using the development of a real-time remote site monitoring system METHODS : In this study, we developed the remote site monitoring system using a web camera for road construction projects in the RCMA(Regional Construction Management Administration). We can be monitored a construction progress and a weak point of the situation in real time using this. To achieve this, we tested about 10 road construction projects ordered by RCMA. Then, we verified a applicability for the site monitoring system in future. RESULTS : Take advantage of the remote site monitoring system consists of the Construction CALS System, one of the business systems used in the part of the MLTM(Ministry of Land, Transport and Maritime Affairs) institution-agencies. Was configured to be served through the "Construction CALS System" of "Construction Management System(Contractors)" and the "Construction CALS Portal System". Through this, Benefit analysis through a pilot application of the 10 road construction sites and developing considerations and "Guide for visual information processing equipment installation-operating in construction sites"are presented. CONCLUSIONS : Through the establishment of remote site monitoring system can improve the efficiency of construction management services. In addition, Various disasters and calamities, accidents and illegal construction will be prevented in advance is expected. This is expected to further improve the quality of the facilities.