• Title/Summary/Keyword: Road Construction Project

Search Result 271, Processing Time 0.023 seconds

A Study on Analysis of Issues in Developing a Basic Road Transport Database and Proposals for Enhancing Its Reliability and Data Sharing (with Focus on Databases Related to Road Transport Demand Estimation) (도로부문 교통기초자료 구축사업의 문제점 분석 및 개선방안 연구 (교통수요 예측 자료를 중심으로))

  • Lee, Sang-Hyeop;O, Chang-Seok
    • Journal of Korean Society of Transportation
    • /
    • v.27 no.6
    • /
    • pp.55-67
    • /
    • 2009
  • In Korea, previously implemented road construction project caused a big budget waste due to overestimation of transport demand. There could be reasons for such inaccuracy of transport demand estimation, but the main reasons are: (1) low reliability of used basic road transport data and (2) inadequate sharing of data among agencies/departments. The National Transport Database and the Household Travel Database in Seoul Metropolitan Area, two representing basic road transport database, will be used to the establishment of a road construction plan that will be promoted afterwards. However, these materials have problems such as low reliability and inadequateness, too. Hence, focusing on transport demand estimation related databases, this paper will make proposals for enhancing their reliability and data sharing.

A Study on the Test Bed Evaluation for the Ecological Restoration of Unused Road - Focused on the Experimental Construction Site in Young Dong Province of GyungBu Expressway(Seven years after construction.) - (폐도로 생태복원을 위한 시험시공지 평가 연구 - 경부선 영동군 황간지역 시험시공지에 대한 시공 후 7년 시점의 추적조사 -)

  • Jeon, Gi-Seong
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.19 no.5
    • /
    • pp.47-57
    • /
    • 2016
  • In the recent years, the incidence of abandoned concrete roads have been increasing rapidly due to road improvements and facilities route construction, these abandoned expressway and unused roads are scattered throughout the country but the management system is not clear, they does not be an effectively managed because there is no maintenance cost. In response to these social concern and expectation, the Korea Expressway Corporation that is management authority of the expressway is developing policy initiatives and various projects to restore the closed road to ecological for eco-friendly projects of the existing expressway. And as part of these projects, Hwanggan IC unmanaged abandoned concrete roads restoration project was done and it was conducting monitoring for ecological restoration that is not one-off but sustainable. After test construction over seven years at the time, test construction of four ways enforced but the boundaries have become blurred over time. And Pinus koraiensis, Callicarpa dichotoma and Sorbaria stellipilla var. typica planted in the site are dominating, else Amorpha fruticosa and Indigofera pseudotinctoria sowed are dominating. Invasive species is that Robinia pseudoacacia was growing in the colony. Over monitoring result time, the vegetation was taking root and the ecosystem was being restore. But the disturbance of vegetation happens due to planting of tree species that doesn't fit in the restoration area and advent of ecosystem Disturbing Species. The study will be providing a basic data that identify change of plant environment by monitoring of the site and soil environment during June to November 2016 and secure an objective evaluation data by analyzing the effects of ecological restoration for revegetation test bed evaluation for ecological restoration of expressway in ecological restoration construction in later.

DEVELOPMENT OF PERFORMANCE MEASURES IN ASSET MANAGERMENT FOR BRIDGE MANAGEMENT IN KOREA

  • Cheolwoo Park;Kyung-Hoon Park;Min-Jae Lee;Jung-Sik Kong;Yoon-Koog Hwang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1166-1169
    • /
    • 2009
  • Bridges are exposed to very severe environment and experience, as service life increased, elevated traffic load and traffic flow, in addition to natural disasters. In comparing to other road structures, bridges may cause more significant damage, such as human-involved accidents, to the society in the event of collapse. A certain level of service shall be necessarily secured to assure the minimum safety of users. The cost for manage and preserve bridges will increase gradually and more restrictions will be loaded to efficiently distribute the limited resources, such as monetary budget and human resource etc. In order to enhance performance and serviceability of bridges with the limited resource, asset management technique has been applied into the bridge management system, which capitalizes the road infrastructures including bridges and assess them in accordance with the government finance report. In the application of asset management, there must be a tool for assess the performance of bridges and this study introduces the basic information on the definition and role of performance measures for asset management for bridges. This research suggests future development direction of performance measure for asset management for bridges in Korea.

  • PDF

Building of Efficient Route Alignment Information using GSIS -Focused on plan and vertical alignment- (GSIS를 이용한 효율적 도로선형 정보의 구축 - 평면 및 종단선형을 중심으로 -)

  • 강상구;정영동
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.18 no.4
    • /
    • pp.325-333
    • /
    • 2000
  • This paper deals with real time building of route and vertical alignment information system for the efficient and scientific management using GSIS. First, we redesigned route and vertical alignment for obtained basic data using road projector(road design main software). Using by these acquired result, we made a database on road plan and vertical alignment drawing as a basic information being used to construction of road complex information system. The main objectives in this study are the rational maintenance road planing for drawings, its database and the systematization of route information management through the fast updating, mending, supplement. Result of this study enables us to manage route information.

  • PDF

Analyzing Environmental Impacts in Construction Project at Different Ownership - Focus on Express Road Pavement Process - (공공발주자와 민간기업 측면의 건설공사 온실가스 환경비용 영향분석 - 고속도로 포장공종을 중심으로 -)

  • Jang, Woo Sik;Park, Heedae;Han, Seung Heon;Jeon, Jong Seo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.1D
    • /
    • pp.111-117
    • /
    • 2011
  • In the wake of increased concerns on reduction of greenhouse emission which started with United Nation's Framework Convention on Climate Change (UNFCCC) and Kyoto protocol, Korean government is making various efforts under the represented slogan "Low Carbon, Green Growth". Therefore, it is inevitable that construction industry also follow the Korea government's slogan and the international trend in environmental problems. This study identified several main construction materials and equipments of civil construction projects and suggested a environmental cost estimation method and related estimation standards (Public and private owners are distinguished). A case analysis of a real road construction project is also performed and characteristics according to the owner type is compared. This study analyzed the environmental impact to total construction cost variations. In the result, public owner required 11~16% of extra budget and private owner required 19~22% of extra costs. This study is limited in consideration of environmental factors and carbon trading prices.

The Pavement Method of Farm Road with Geo-Cement(Lime) (석회계 고화재를 이용한 간척지내 경작로 포장방안)

  • Kong, Kil-Yong;Kim, Hyun-Tae;Lee, Kyu-Seop;Kim, Young-Ho
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2005.10a
    • /
    • pp.367-374
    • /
    • 2005
  • In order to construct the farm road in Shi-Hwa project, coarse soils excavated from hillsides have been used as road materials for reclamation. Suitable borrow pits available in land are now limited and also they bring about environmental problems when soils are excavated at the borrow pits and transported to the site. When using fine and wet materials as fill, however, many engineering problems can be encountered. Usually, the materials have high water contents, low strength, and high compressibility. In order to use them, we need research that can improve the inherent properties of those materials. In order to tackle with the problems, researches on soil improvement involve mixing lime geo-cement to the fine wet soils. A lab model test is necessary to verify effectiveness and comparison of those techniques. A field test is also required to show applicability and to find problems that may exist in the design and construction stages.

  • PDF

A Case Study for the 1st Double-level Tunnel for Light vehicle in Urban Area in Korea (국내 최초 소형차 전용 도심지 대심도 복층터널 설계 사례)

  • Kim, Gyoung-Hun;Choi, Jun-Dong;Jun, Duk-Chan;Shin, Il-Jae;Sim, Dong-Hyun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.1302-1313
    • /
    • 2010
  • The west express way is notorious for extremely heavy traffic area in the west of Seoul, South Korea. Hence, the city government recently initiated a new underground BTO (Build-Transfer-Operate) road project to solve traffic congestion and a high construction cost. The proposed underground express road being designed is the first double-level tunnel ever designed in South Korea and using Conventional tunnelling method (NATM). A total length of tunnel for light vehicles is 10.91km long including both open cut structures and concrete lining with middle-deck in bored tunnel. There are also 4 ventilation shafts for ventilation and evacuation on emergency. Many design issues had been aroused during the preliminary design phase and detail design phase is currently going on. This paper discusses design focuses including excavation methods, ground water issues, a deck slab installation, and a construction cost etc. for the double level road tunnel design of urban area.

  • PDF

Extension of the IFC Schema for Road Subsidiary Facility (도로 부대시설 수용을 위한 IFC 스키마 확장 개발)

  • Cho, Geun-Ha;Ju, Ki-Beom
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.12
    • /
    • pp.7385-7392
    • /
    • 2014
  • Extension IFC schema of subsidiary facilities were developed for the purpose of establishing an information model standard for roads. The IFC entities, types and properties for subsidiary facilities were defined through an analysis of the road design documents for the extraction physical component and design information. The converter and viewer for applying the new schema were then developed. Subsidiary facilities BIM models were converted to new IFC models to verify the research results. Standard BIM-based delivery and verification systems are enabled by using a standard model converted by new schema. Furthermore, it can establish an open BIM environment using an IFC over the entire life cycle of the civil engineering project.

An Analysis for the Economic Impact of Forest Road Investment (임도시설 투자의 경제적 파급효과 분석)

  • Lee, Seung-Jung;Jung, Byung-Heon;Kim, Ki-Dong;Jeon, Hyon-Sun;Jo, Min-Woo
    • Journal of Korean Society of Forest Science
    • /
    • v.106 no.2
    • /
    • pp.219-229
    • /
    • 2017
  • Forest road is an essential infrastructure for forest management such as the composition and management of forest resources, timber and forest byproduct production & transportation. It has recently been utilized forest recreation and forest sports as well as also forest pest control, forest fire prevention and evolution. When you build a forest road, the economic function in the forest is activated, so that it can result in the ripple effect of induced employment, value-added creation and production inducement. The purpose of this study is to analyze the impact caused by forest road construction occurring as the overall economy. For analysis it was applied to inter industry analysis method that is a method for analyzing the quantitative cross-correlation. The data were used in the Input-Output Tables In 2014, the Bank of Korea. When you build a forest road, economic effect due to the construction of the forest road is generated and economic effects are also generated due to the increase in the production of forest products after the construction of the forest road. Therefore, we will analyze the economic impact of the two effects. The estimated economic value of forest products, which is the economic effect of forest product cultivation, was calculated through some assumptions and the economic ripple effect was analyzed. The forest road construction sector is defined as land clearing and reclamation, and irrigation project construction and the forestry forest products sector is defined as the sum of raw timber, edible forest products and misc. forest products. In total, 32 sectors were classified, and except for the two sectors defined as forest road construction and forestry forest products, the remaining sectors were integrated according to the classification system of 30 integrated classifications of the Bank of Korea. As a result, the production inducement coefficient for forest construction was analyzed to be 2.767 and the production inducement coefficient for forestry forest products was analyzed to be 1.565. This means that 2,767 times the production of forest road construction investment is induced in the whole industry and the production of 1.562 times the amount of forestry forest products is caused by the whole industry as the production of forestry forest products increases. The value added inducement coefficient for forest road construction was 0.977 and the value added inducement coefficient for forestry forest products was 0.985. Forest road are essential infrastructure for forestry development and should be continuously invested because they are essential elements of timber production and forest byproduct production with functions such as forest management, forest recreation, forest sports, and town connection.

Performance Evaluation of Smart Intersections for Emergency Response Time based on Integration of Geospatial and Incident Data

  • Oh, Heung Jin;Ashuri, Baabak
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.945-951
    • /
    • 2022
  • The major objective of this research is to evaluate performance of improved intersections for response time to emergency vehicle preemption. Smart technologies have been introduced to civil infrastructure systems for resilient communities. The technologies need to evaluate their effectiveness and feasibility to confirm their introduction. This research focuses on the performance of emergency vehicle preemption, represented by response time, when smart intersections are introduced in a community. The response time is determined by not only intersections but also a number of factors such as traffic, distance, road conditions, and incident types. However, the evaluation of emergency response has often ignored factors related to emergency vehicle routes. In this respect, this research synthetically analyzes geospatial and incident data using each route of emergency vehicle and conducts before-and-after evaluations. The changes in performance are analyzed by the impact of smart intersections on response time through Bayesian regression models. The result provides measures of the project's performance. This study will contribute to the body of knowledge on modeling the impacts of technology application and integrating heterogeneous data sets. It will provide a way to confirm and prove the effectiveness of introducing smart technologies to our communities.

  • PDF